Skip to content
Independent United States Cost GuidesPrices verified November 2026 · 39 trades · 195 US cities · 221+ sources For pros →
Get a fair quote

Cost guides

Plumbing & water4 trades
Electrical & energy5 trades
Renovation8 trades
Structural7 trades
Outdoor & yard7 trades
Cleaning & maintenance8 trades

More

Get a fair quote
Cost guide

How much does a bathroom remodel cost in Boston?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched12 min read
Bathroom remodel cost

Bathroom remodel costs in Boston

Boston, MAChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Boston, MA
$9,900–$28,000per project

Most bathroom remodels in Boston cost $9,900–$28,000 per project for a 5×8 full bath gutted and rebuilt on the same layout. Most homeowners here pay about $16,900. A tub-to-shower conversion is $2,850–$13,600.

How we get this data
Typical
$16,900
Low end
$5,850
High end
$46,600
Mid-range 5×8 bath
$9,900–$28,000
Half bath
$2,850–$13,800
Tub-to-shower
$2,850–$13,600
Primary bath
$20,400–$56,600

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.

Get my fair quote →
Typical bathroom remodel price: Boston vs nearby citiesTypical price, per project. The line marks the US typical.
Boston, MAThis guide $16,900
Providence, RI $16,200
Worcester, MA $15,600
Hartford, CT $15,500
Manchester, NH $14,500
Springfield, MA $14,400
Portland, ME $14,000

The typical Boston price is $16,900, 17% above the US typical of $14,500.

Where Boston sits among 195 US metrosNumber of metros at each typical bathroom remodel price, per project.

Boston's price band

Boston is pricier than 91% of the 195 US metros we price for bathroom remodel work.

A mid-range remodel of a 5×8 bathroom costs $9,900–$28,000 in Boston, and $16,900 is what most homeowners pay. A half bath runs $2,850–$13,800, a primary bath $20,400–$56,600, and a tub-to-shower conversion $2,850–$13,600.

Bob Vila's June 2024 city table puts a Boston bathroom remodel at $6,800–$15,600 and HomeGuide's at $6,800–$19,500. Massachusetts home improvement contractors must register with the state, and its Guaranty Fund can pay eligible homeowners up to $25,000 on unpaid judgments against a registered contractor; a registration is not a license, so also ask who holds the construction supervisor license and the plumbing license.

Project prices include materials and labor. Fixtures, tile and the vanity are the lines you control; demolition, waterproofing and plumbing are where Boston remodelers earn their fee.

Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.

Quick answer

$9,900–$28,000 for a mid-range remodel of a 5×8 bathroom in Boston, labor and materials — typically $16,900. A half bath runs $2,850–$13,800, a primary bath $20,400–$56,600, and a tub-to-shower conversion $2,850–$13,600. Verified November 2026. Get free Boston quotes →

  • Mid-range 5×8 full bath remodel: $9,900–$28,000 ($16,900 typical)
  • Half bath $2,850–$13,800; primary bath $20,400–$56,600
  • Tub-to-shower conversion $2,850–$13,600; tiled walk-in shower $6,250–$18,100
  • Vanity installed $865–$4,350; toilet $390–$1,100; permits $160–$1,600
  • Priciest area to remodel in: Downtown, South End & Back Bay; lowest quotes: Allston, Brighton & Cambridge

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Detailed pricing — Bathroom remodel cost in Boston 2026

Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Boston metro, re-verified November 2026.

ServiceLowTypicalHigh
Mid-range full remodel, 5×8 ft bath, same layoutper project$9,900per project$16,900$28,000
Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project$6,300per project$9,750$13,800
Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project$27,900per project$42,400$67,000
Luxury primary bathroom remodel, 100+ sq ftper project$55,000per project$88,000$132,000
Half bath (powder room) remodelper project$2,850per project$6,900$13,800
Small full bath remodel (under 40 sq ft), same layoutper project$6,900per project$11,500$18,400
Primary bathroom remodel, mid-range, about 100 sq ftper project$20,400per project$32,900$56,600
Full remodel, cost per square foot (whole-room average)per sq ft$140per sq ft$285$460
Demolition to studs and debris disposalper project$805per project$1,600$2,850
Plumbing rough-in or moving one fixtureper fixture$920per fixture$2,300$5,750
Electrical: GFCI outlets, vanity lights and exhaust fanper project$575per project$1,400$2,850
Shower waterproofing (membrane or pan liner)per shower$680per shower$1,350$2,850
Tile installation, floor or shower walls, materials and laborper sq ft$14per sq ft$25$45
Vanity with top, sink and faucet, installed (36–48 in)installed$865installed$1,950$4,350
Toilet, installed (mid-range two-piece)installed$390installed$670$1,100
Alcove bathtub replacement, 60-in acrylic, installedinstalled$1,650installed$3,300$6,600
Freestanding soaking tub with floor-mount filler, installedinstalled$3,250installed$6,500$10,800
Prefab shower (acrylic or fiberglass kit), installedinstalled$1,650installed$3,500$6,600
Custom tiled walk-in shower, installedinstalled$6,250installed$10,800$18,100
Tub-to-shower conversionper project$2,850per project$6,250$13,600
Frameless glass shower door, installedinstalled$975installed$1,600$3,050
Heated towel rack, hardwired, installedinstalled$385installed$770$1,300
Faucet, showerhead and trim package, installed (mid-range)per project$770per project$1,450$2,750
Permits: building, plumbing and electricalper project$160per project$540$1,600
Bigger bathroom remodel jobs in Boston: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Luxury primary bathroom remodel, 100+ sq ft $88,000$55K–$132K
Upscale remodel, high-end tile and fixtures (5×8 to 8×10) $42,400$27.9K–$67K
Primary bathroom remodel, mid-range, about 100 sq ft $32,900$20.4K–$56.6K
Mid-range full remodel, 5×8 ft bath, same layout $16,900$9,900–$28K
Small full bath remodel (under 40 sq ft), same layout $11,500$6,900–$18.4K
Smaller bathroom remodel jobs and repairs in BostonPer project, low to high with the typical price marked. Every line is in the table above.
Budget full remodel, 5×8 ft, stock fixtures and ceramic tile $9,750$6,300–$13.8K
Half bath (powder room) remodel $6,900$2,850–$13.8K
Tub-to-shower conversion $6,250$2,850–$13.6K
Demolition to studs and debris disposal $1,600$805–$2,850
Faucet, showerhead and trim package, installed (mid-range) $1,450$770–$2,750
Electrical: GFCI outlets, vanity lights and exhaust fan $1,400$575–$2,850
Permits: building, plumbing and electrical $540$160–$1,600
Already got a quote?
Check it against these Boston prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local bathroom remodelers in Boston

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Prices cover the Boston metro. Outlying towns can run 5–10% lower; condos and older homes in Downtown, South End & Back Bay sit at the top of each range.

How bathroom remodel costs vary across Boston

Bathroom remodel prices across Boston

Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Downtown, South End & Back Bay take the longest; same-layout jobs in Allston, Brighton & Cambridge tend to come in at or under the city typical.

Bathroom remodel prices across BostonTypical range by part of the metro, per project. The line marks the Boston typical.
Downtown, South End & Back Bay10–15% above the city average $10.7K–$32.2Kper project
Allston, Brighton & CambridgeStandard to 5% below $9,400–$27.4Kper project
Dorchester, Roxbury & MattapanStandard pricing $9,900–$28Kper project
Quincy, Lynn & the suburbsStandard; bigger primary baths $9,900–$29.4Kper project

Downtown, South End & Back Bay

10–15% above the city average
Downtown, South End, Back Bay, Fenway
Full remodel (5×8)
$10,700–$32,200 per project
Tub-to-shower
$3,100–$15,600 / tub-to-shower conversion

Pre-war and mid-century buildings with cast-iron drains and plaster walls. Expect a bigger contingency and a longer schedule than in a newer house.

Allston, Brighton & Cambridge

Standard to 5% below
Allston, Brighton, Cambridge, Somerville
Full remodel (5×8)
$9,400–$27,400 per project
Tub-to-shower
$2,700–$13,300 / tub-to-shower conversion

Rentals and older houses. Landlord remodels tend to be budget-level with prefab showers and stock vanities, which keeps prices a little under the city average.

Dorchester, Roxbury & Mattapan

Standard pricing
Dorchester, Roxbury, Mattapan, Hyde Park
Full remodel (5×8)
$9,900–$28,000 per project
Tub-to-shower
$2,850–$13,600 / tub-to-shower conversion

Standard pricing for standard jobs. Driveway access for the dumpster and easy parking keep crew time down.

Quincy, Lynn & the suburbs

Standard; bigger primary baths
Quincy, Lynn, Brockton, Waltham
Full remodel (5×8)
$9,900–$29,400 per project
Tub-to-shower
$2,850–$14,300 / tub-to-shower conversion

Two or three full baths per house are common here. Expect standard pricing, and ask about doing two baths at once to share the demo and permit costs.

What you'll actually pay — job by job

Real-World Bathroom Remodel Costs in Boston

Here's what common bathroom remodel jobs cost in Boston in 2026, labor and materials on the existing layout.

Mid-range 5×8 full bath, same layout — 2–4 weeks

$9,900–$16,900

Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Boston jobs land here; stone tile or a layout change pushes it toward $28,000.

Tub-to-shower conversion with frameless glass

$3,850–$16,700

Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,850–$13,600) and add a frameless glass door ($975–$3,050). The most popular single upgrade in older homes.

Half bath (powder room) refresh — 3–7 days

$2,850–$13,800

New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.

Primary bath, mid-range, about 100 sq ft — 4–6 weeks

$20,400–$56,600

Double vanity, separate tiled shower ($6,250–$18,100) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.

Budget rental or resale remodel — 1–2 weeks

$6,300–$13,800

Prefab shower or tub surround ($1,650–$6,600), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.

How much does a bathroom remodel cost in Boston?

$9,900–$28,000, with $16,900 typical. A budget job with a prefab shower and stock vanity is $6,300–$13,800; a mid-range job with porcelain tile and a semi-custom vanity lands near $16,900; stone tile, frameless glass and a custom vanity push it to $27,900–$67,000. Quotes above $28,000 usually mean a layout change or a primary-size room.

If the layout stays put you save $3,000–$8,000 against moving the toilet or shower. If the tub never gets used, a tub-to-shower conversion at $2,850–$13,600 is the cheapest big upgrade. Figures re-checked against 103 sources in November 2026.

Bathroom remodel prices in Boston (2026): by room, tub, shower and vanity

A mid-range 5×8 remodel costs $9,900–$28,000, a half bath $2,850–$13,800, a tiled walk-in shower $6,250–$18,100 installed and a vanity $865–$4,350.

Line on the quoteLowTypicalHigh
Half bath (powder room) remodel$2,850$6,900$13,800
Small full bath remodel (under 40 sq ft), same layout$6,900$11,500$18,400
Primary bathroom remodel, mid-range, about 100 sq ft$20,400$32,900$56,600
Tub-to-shower conversion$2,850$6,250$13,600
Custom tiled walk-in shower, installed$6,250$10,800$18,100
Prefab shower kit, installed$1,650$3,500$6,600
Vanity with top, sink and faucet, installed$865$1,950$4,350
Toilet, installed$390$670$1,100

Remodel or refresh in Boston: a cosmetic refresh (vanity, toilet, fixtures, paint) at $2,200–$9,250 fixes a tired but sound bathroom. A full remodel at $16,900 typical is the answer when the tile, waterproofing or layout has failed.

What moves a bathroom remodel quote in Boston:

  • Room size — a half bath is $2,850–$13,800; a 5×8 full bath $9,900–$28,000; a 100 sq ft primary bath $20,400–$56,600.
  • Tub or shower — a prefab kit is $1,650–$6,600; a custom tiled walk-in shower $6,250–$18,100; a tub-to-shower conversion $2,850–$13,600.
  • Layout — moving the toilet, sink or shower adds $920–$5,750 per fixture; keeping the layout saves $3,000–$8,000.
  • Tile and finishes — tile runs $14–$45 per sq ft installed, about $1,700–$5,400 for a 5×8 bath; a vanity $865–$4,350; frameless glass $975–$3,050.
  • What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.

Ask every Boston remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →

Bathroom Remodel Cost in Boston by Bathroom Size

Quick answer

Half bath (20–30 sq ft): $2,850–$13,800. Small full bath under 40 sq ft: $6,900–$18,400. Standard 5×8 full bath: $9,900–$28,000. Primary bath, about 100 sq ft: $20,400–$56,600; luxury primary $55,000–$132,000.

Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,600, electrical with GFCI outlets, lights and fan $1,400, shower waterproofing $1,350, tile (about 120 sq ft at $25 per sq ft) $3,000, alcove tub $3,300, vanity with top and faucet $1,950, toilet $670, shower trim and fixtures $1,450, frameless glass $1,600, paint $515. Those pieces come to about $16,800 in Boston; add rough plumbing on the existing lines, drywall, trim and the contractor's margin and the whole room lands near the $16,900 typical. Permits at $540 and any moved fixture are on top.

Per square foot, bathrooms run $140–$460 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $32,900 typical is about double a 5×8 bath, not two and a half times.

Boston Bathroom Remodel Costs by Type and Level

Remodel typeCostBest for
Cosmetic refresh (vanity, toilet, fixtures, paint)$2,200–$9,250 per projectA tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work.
Budget full remodel, 5×8$6,300–$13,800 per projectRentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout.
Mid-range full remodel, 5×8$9,900–$28,000 per projectMost family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout.
Upscale remodel$27,900–$67,000 per projectLarge-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change.
Luxury primary bath, 100+ sq ft$55,000–$132,000 per projectFreestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule.
Half bath (powder room)$2,850–$13,800 per projectToilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo.
Small full bath under 40 sq ft$6,900–$18,400 per projectHall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same.
Primary bath, mid-range, ~100 sq ft$20,400–$56,600 per projectDouble vanity, separate tub and shower, more tile. Roughly double a 5×8 bath.
Tub-to-shower conversion$2,850–$13,600 per projectReplacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location.
Custom tiled walk-in shower$6,250–$18,100 installedAny size or shape, bench and niche, curbless entry possible. Needs proper waterproofing.
Prefab shower kit$1,650–$6,600 installedAcrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain.
Accessible / aging-in-place remodel$2,850–$32,900 per projectCurbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves.
Cost by remodel type in BostonTypical range, per project.
Cosmetic refresh (vanity, toilet, fixtures, paint) $2,200–$9,250per project
Budget full remodel, 5×8 $6,300–$13.8Kper project
Mid-range full remodel, 5×8 $9,900–$28Kper project
Upscale remodel $27.9K–$67Kper project
Luxury primary bath, 100+ sq ft $55K–$132Kper project
Half bath (powder room) $2,850–$13.8Kper project
Small full bath under 40 sq ft $6,900–$18.4Kper project
Primary bath, mid-range, ~100 sq ft $20.4K–$56.6Kper project
Tub-to-shower conversion $2,850–$13.6Kper project
Accessible / aging-in-place remodel $2,850–$32.9Kper project
Boston tip: decide on waterproofing before tile. A proper membrane or pan ($680–$2,850) is the one line never to cut; it's what fails first in a cheap remodel.

Materials vs. labor — the Boston bathroom remodel bill

Labor is 40–65% of a bathroom remodel. On a $16,900 mid-range 5×8 job in Boston that's roughly $6,750–$11,000 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.

Plumbers in Boston bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.

What's included in a Boston bathroom remodel quote (and what costs extra)

A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:

  • Permits — $160–$1,600 for building, plumbing and electrical, often billed at cost
  • Moving fixtures — $920–$5,750 per toilet, sink or shower relocated
  • Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
  • Upgrades — frameless glass $975–$3,050, heated floor $600–$2,800, towel warmer $385–$1,300

Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.

What Affects Bathroom Remodel Costs in Boston

Room size and layout

A half bath costs $2,850–$13,800 in Boston, a 5×8 full bath $9,900–$28,000, a 100 sq ft primary bath $20,400–$56,600. Moving a fixture adds $920–$5,750 each; keeping the layout saves $3,000–$8,000.

Tub or shower choice

A prefab shower kit is $1,650–$6,600 installed; a custom tiled walk-in shower $6,250–$18,100; an alcove tub $1,650–$6,600; a freestanding soaking tub $3,250–$10,800. Converting a tub to a shower runs $2,850–$13,600.

Tile and finish level

Tile costs $14–$45 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,700–$5,400. Large-format porcelain and stone sit at the top; a vanity runs $865–$4,350 and frameless glass $975–$3,050.

What's behind the walls

Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Boston homes should carry a 10–20% contingency.

Permits and local rules

A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $160–$1,600 for a Boston remodel and make sure the contractor, not you, pulls it.

Labor rates in Boston

Labor is 40–65% of the bill. Boston is a high-cost metro for remodeling labor, so a mid-range 5×8 remodel is about 17% above the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.

Scope creep and extras

Heated floors add $600–$2,800, a heated towel rack $385–$1,300, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.

How to Save Money on a Bathroom Remodel in Boston
  1. Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $920–$5,750.
  2. Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,850–$13,600 fixes the room's biggest problem for a fraction of a full remodel at $16,900.
  3. Go prefab where it won't show.A prefab shower kit at $1,650–$6,600 costs less than half a tiled shower at $6,250–$18,100, and has no grout to maintain.
  4. Buy mid-range fixtures from one collection.A $770–$2,750 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $865–$4,350 looks like custom for far less.
  5. Get three line-item quotes.Each Boston quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($160–$1,600) and labor on separate lines. Compare the lines, not the total.
  6. Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Bathroom Remodel Cost in Boston: What the Quote Should Include

Boston remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:

  • Demolition and disposal, including the dumpster
  • Plumbing and electrical scope, and whether fixtures move
  • Waterproofing method (sheet or liquid membrane, pan) and its warranty
  • Tile type, square footage and labor, with layout and pattern noted
  • Fixture and vanity allowances or fixed prices, by model
  • Permits: who pulls them and what they cost
  • Schedule with start and finish dates and the payment stages
  • Contingency for hidden damage and how change orders are priced
Frequently asked questions — Bathroom remodel cost in Boston
How much does a bathroom remodel cost in Boston?

$9,900–$28,000 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $16,900 is typical. A half bath runs $2,850–$13,800, a primary bath $20,400–$56,600.

How much is a small bathroom remodel in Boston?

$6,900–$18,400 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $6,300–$13,800; a half bath $2,850–$13,800.

How much does a tub-to-shower conversion cost in Boston?

$2,850–$13,600, prefab at the low end and custom tile at the top. Add $975–$3,050 for a frameless glass door, so a tiled conversion with glass runs $3,850–$16,700.

How much does a walk-in shower cost in Boston?

$6,250–$18,100 for a custom tiled walk-in shower installed, or $1,650–$6,600 for a prefab kit. Frameless glass is $975–$3,050 more; a curbless entry adds $1,000–$4,000.

How much is a primary bathroom remodel in Boston?

$20,400–$56,600 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $55,000–$132,000.

Do I need a permit to remodel a bathroom in Boston?

Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $160–$1,600 for a Boston remodel and make sure the contractor, not you, pulls it.

How long does a bathroom remodel take in Boston?

About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.

What does labor cost for a bathroom remodel in Boston?

Labor is 40–65% of the bill, so about $6,750–$11,000 of a $16,900 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.

Does a bathroom remodel add value to my home?

Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.

What's included in a Boston bathroom remodel quote?

Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($160–$1,600), moving fixtures ($920–$5,750 each) and hidden damage.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Prices for the Boston metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, the Cost vs Value and Houzz studies, remodeler price pages, dated city price pages and federal wage data. No remodeling company can pay to change them, so always get two or three quotes. Last reviewed November 2026. Read our full methodology →

Get a fair bathroom remodel quote in Boston

Local bathroom remodelers · Free quotes · No obligation, no spam.

Get quotes in Boston →Max 2 bathroom remodelers will contact you
Get quotes in BostonMax 2 bathroom remodelers · free · no spam→