Cost guide / General contractor / USAVerified November 2026

General Contractor Cost USA 2026

By Our research team · Last verified · 13 min read · Methodology

General contractor cost

General contractor costs in the US

United States
Get free quotesFree · no obligation · max 2 pros
Normal range across the US
$5,000–$10,000per $50k project

What most homeowners pay for project, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so. Pick your city for local prices.

How we get this data
Typical
$7,500
Low end
$4,000
High end
$12,500
Cities priced
195
Sources
23+
Trades priced
39
Verified
November 2026

A general contractor charges $5,000–$10,000 to run a $50,000 remodel in the US in 2026, a fee of 10% to 20% on top of labor and materials, and most homeowners pay about $7,500 (15%). The fee scales with the job: $15,000–$30,000 on a $150,000 addition and $40,000–$80,000 to build a $400,000 house. Whole projects with the GC included run $50,000–$100,000 for a 400 sq ft room addition, $50,000–$200,000 for a 2,000 sq ft whole-house renovation and $130–$250 a square foot for new construction.

01 / The short answerUSA
Quick answer

$5,000–$10,000 for a general contractor to run a $50,000 remodel in the US — a 10–20% fee on top of labor and materials — $7,500 typical. A 400 sq ft addition runs $50,000–$100,000 all in, a whole-house renovation $50,000–$200,000, and new construction $130–$250 a square foot. Pick your city ↓

  • GC fee: 10–20% of the project; $5,000–$10,000 on a $50,000 remodel ($7,500 typical)
  • Hourly $50–$150; day rate $300–$500; construction manager $2,500–$7,500 on $50,000
  • Room addition $50,000–$100,000 for 400 sq ft; second story $120,000–$300,000
  • Whole-house renovation $50,000–$200,000; new construction $130–$250 per sq ft
  • Pick a city below for local prices across 195 US metros

Prices below come from national cost guides, builder-platform data, the National Association of Home Builders' construction cost survey, dated city price pages, state licensing boards and federal wage data for construction supervisors, applied across 195 US metros and re-checked in November 2026. Fee rows are the GC's charge; project rows are the whole job with the fee inside. Pick your city for local pricing.

A simple same-layout remodel run by a small GC in a cheap market can carry a fee near $4,000 (8%) on $50,000; a structural job on a tight city lot with many subs can reach $12,500 (25%). The fee is the small part of any bill: on a $75,000 addition the GC keeps about $11,250 and the rest goes to subs, materials and permits. The highest typical fee on our city pages is San Francisco ($8,600); the lowest is Brownsville ($6,750).

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

02 / Prices by city195 metros

General contractor cost by city

Typical general contractor ranges, re-verified November 2026 across 23+ sources. Largest cities first.

Typical general contractor price in the 20 largest US metrosTypical price, per $50k project. The line marks the US typical.
Seattle, WA $8,600
New York, NY $8,450
Chicago, IL $8,400
Boston, MA $8,150
San Diego, CA $7,850
Atlanta, GA $7,700
Miami, FL $7,650
Denver, CO $7,600
Phoenix, AZ $7,500
Detroit, MI $7,500
Riverside, CA $7,450
Dallas, TX $7,400
Houston, TX $7,400
Tampa, FL $7,400

Among the biggest metros, San Francisco is the priciest at $8,600 and Tampa the least at $7,400.

How general contractor prices vary across 195 US metrosNumber of metros at each typical price, per $50k project.

Half of the 195 metros we price sit between $7,200 and $7,550.

CityTypical range
New York, NY$5,650–$10,750 per $50k project
Los Angeles, CA$5,550–$10,650 per $50k project
Chicago, IL$5,600–$10,700 per $50k project
Dallas, TX$4,950–$9,900 per $50k project
Houston, TX$4,950–$9,900 per $50k project
Washington, DC$5,200–$10,200 per $50k project
Atlanta, GA$5,150–$10,150 per $50k project
Philadelphia, PA$5,250–$10,300 per $50k project
Miami, FL$5,100–$10,100 per $50k project
Phoenix, AZ$5,000–$10,000 per $50k project
Boston, MA$5,450–$10,500 per $50k project
San Francisco, CA$5,750–$10,850 per $50k project
Riverside, CA$5,000–$9,950 per $50k project
Detroit, MI$5,000–$10,000 per $50k project
Seattle, WA$5,750–$10,900 per $50k project
Minneapolis, MN$5,350–$10,400 per $50k project
San Diego, CA$5,250–$10,300 per $50k project
Tampa, FL$4,950–$9,850 per $50k project
Orange County, CA$5,250–$10,300 per $50k project
Denver, CO$5,050–$10,050 per $50k project
Oakland, CA$5,550–$10,700 per $50k project
Charlotte, NC$5,000–$9,900 per $50k project
Baltimore, MD$5,000–$9,950 per $50k project
St. Louis, MO$5,250–$10,300 per $50k project
Orlando, FL$4,950–$9,850 per $50k project
Brooklyn, NY$5,500–$10,600 per $50k project
San Antonio, TX$4,900–$9,650 per $50k project
Fort Worth, TX$4,900–$9,750 per $50k project
Austin, TX$5,000–$9,950 per $50k project
Portland, OR$5,450–$10,550 per $50k project
Choose your city51 states

Each city page has local rates by area, real-world general contracting costs and a city-specific FAQ. Prices shown are the low end of the typical range, per $50k project.

Alabama

Alaska

Arizona

Arkansas

California

Colorado

Connecticut

Delaware

District of Columbia

Florida

Georgia

Hawaii

Idaho

Illinois

Indiana

Iowa

Kansas

Kentucky

Louisiana

Maine

Maryland

Massachusetts

Michigan

Minnesota

Mississippi

Missouri

Montana

Nebraska

Nevada

New Hampshire

New Jersey

New Mexico

New York

North Carolina

North Dakota

Ohio

Oklahoma

Oregon

Pennsylvania

Rhode Island

South Carolina

South Dakota

Tennessee

Texas

Utah

Vermont

Virginia

Washington

West Virginia

Wisconsin

Wyoming

03 / National price listGENERAL CONTRACTOR · USA

General contractor prices, 2026

JobLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$5,000$7,500$10,000
General contractor fee on a $150,000 addition or major remodelper $150k project$15,000$22,500$30,000
General contractor fee to build a $400,000 houseper $400k build$40,000$60,000$80,000
General contractor hourly rate (consulting, small jobs)/hr$50$75$150
General contractor day rate (working on your site)per day$300$400$500
Project management only (construction manager) on a $50,000 jobper $50k project$2,500$5,000$7,500
Change order: a $5,000 mid-project change (markup plus admin fee)per change$5,500$6,000$7,000
Building permit and plans for a remodel or additionper project$1,700$4,500$9,500
Structural inspection and written reportper job$300$550$1,000
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,200$2,500$5,000
Remove a load-bearing wall and install a beam (single story)per job$3,000$7,000$15,000
Deck build, about 200 sq ft, run by a general contractorper project$4,500$8,000$15,000
Covered patio or porch addition, about 200 sq ftper project$8,000$16,000$30,000
Detached two-car garage, built from the slab upper project$20,000$30,000$50,000
Basement finish, about 1,000 sq ftper project$22,000$35,000$50,000
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$8,500$14,500$24,000
Kitchen remodel, mid-range, run by a general contractorper project$25,000$40,000$65,000
Home addition, building out, per sq ftper sq ft$100$175$250
Room addition, 20 × 20 ft (400 sq ft), finishedper project$50,000$75,000$100,000
Full second-story additionper project$120,000$175,000$300,000
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$120,000$180,000$300,000
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$50,000$115,000$200,000
New home construction, per sq ft (standard finish, no land)per sq ft$130$165$250
Tear down and rebuild a 2,000 sq ft houseper project$250,000$350,000$550,000
Bigger general contractor jobs: what they cost in the USPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $350,000$250K–$550K
Full second-story addition $175,000$120K–$300K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $115,000$50K–$200K
Room addition, 20 × 20 ft (400 sq ft), finished $75,000$50K–$100K
Smaller general contractor jobs and repairs in the USPer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $40,000$25K–$65K
Basement finish, about 1,000 sq ft $35,000$22K–$50K
Detached two-car garage, built from the slab up $30,000$20K–$50K
Covered patio or porch addition, about 200 sq ft $16,000$8,000–$30K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $14,500$8,500–$24K
Deck build, about 200 sq ft, run by a general contractor $8,000$4,500–$15K
Building permit and plans for a remodel or addition $4,500$1,700–$9,500

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

National average prices. Select a city above for location-specific pricing.

Already got a quote?
See if it's fair against US prices. Free, no sign-up.

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

04 / Who to hireCONTRACT OR JOB TYPE

Cost-Plus, Fixed Price, Hourly: General Contractor Costs by Contract and Job Type

The fee is $5,000–$10,000 on a $50,000 job however it is written. A construction manager is $2,500–$7,500, an hourly GC $50–$150, and the projects themselves run from a $8,500–$24,000 bathroom to a $250,000–$550,000 tear-down rebuild.

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$5,000–$10,000 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 15% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$5,000–$10,000 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,500–$7,500 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$50–$150/hrSmall jobs, repairs and consulting, or $300–$500 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$8,500–$24,000 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$25,000–$65,000 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$22,000–$50,000 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$50,000–$100,000 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $100–$250 a square foot.
Full second-story addition (building up)$120,000–$300,000 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$50,000–$200,000 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$20,000–$50,000 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$120,000–$300,000 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$260,000–$500,000 per projectThe GC is the builder, at $130–$250 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$3,000–$15,000 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job typeTypical range, per project.
Bathroom remodel, mid-range (GC-run) $8,500–$24Kper project
Kitchen remodel, mid-range (GC-run) $25K–$65Kper project
Basement finish, 1,000 sq ft $22K–$50Kper project
Room addition, 400 sq ft (building out) $50K–$100Kper project
Full second-story addition (building up) $120K–$300Kper project
Whole-house renovation, 2,000 sq ft $50K–$200Kper project
Detached two-car garage $20K–$50Kper project
Detached ADU, 600 sq ft turnkey $120K–$300Kper project
New home, 2,000 sq ft (construction only) $260K–$500Kper project
Structural work: remove a bearing wall $3,000–$15Kper project

Cost-plus vs fixed price comes down to who carries the risk: cost-plus shows the fee and floats with the real cost; a fixed bid hides the fee inside one number and adds a cushion. Hourly ($50–$150) suits repairs and consulting. A construction manager ($2,500–$7,500 on $50,000) is the budget option only if you have the time to hire and chase the subs yourself.

05 / Rates & packagesUSA

Common General Contractor Jobs and What They Cost (2026)

The GC's fee on a $50,000 remodel is $5,000–$10,000. Below, whole projects with the fee inside, with the usual time on site in brackets.

Block or rateLowTypicalHigh
GC fee on a $50,000 remodel (6–10 weeks of work)$5,000$7,500$10,000
GC fee on a $150,000 addition (3–5 months)$15,000$22,500$30,000
Project management only, $50,000 job$2,500$5,000$7,500
Remove a load-bearing wall and set a beam (3–5 days)$3,000$7,000$15,000
Minor structural repair (1–3 days)$1,200$2,500$5,000
Structural inspection and report (half a day)$300$550$1,000
Permits and drawings for a remodel or addition (4–12 weeks' wait)$1,700$4,500$9,500
Bathroom remodel, mid-range (2–4 weeks)$8,500$14,500$24,000
Kitchen remodel, mid-range (4–8 weeks)$25,000$40,000$65,000
Basement finish, 1,000 sq ft (4–8 weeks)$22,000$35,000$50,000
Deck build, 200 sq ft (1–2 weeks)$4,500$8,000$15,000
Covered patio or porch, 200 sq ft (2–4 weeks)$8,000$16,000$30,000
Detached two-car garage (4–8 weeks)$20,000$30,000$50,000
Room addition, 400 sq ft (3–5 months)$50,000$75,000$100,000
Full second-story addition (6–12 months)$120,000$175,000$300,000
Whole-house renovation, 2,000 sq ft (4–8 months)$50,000$115,000$200,000

What moves these prices: the size and complexity of the job, whether walls or roofs come off, how many subs are involved, permit and inspection rules in your city, the age of the house, and local labor rates. GCs bill $50–$150 an hour when they work by the hour; everything above is quoted as a project.

06 / Your optionscompared

Cost-Plus vs Fixed Price vs Managing It Yourself: What Each Costs and Why

On a $50,000 remodel, a cost-plus GC shows a fee of about $7,500, a fixed-price GC folds the same fee into one number, and a construction manager charges $5,000 to schedule subs you hire yourself.

FactorCost-plus GCFixed-price GCConstruction manager / owner-run
Fee on a $50,000 job$5,000–$10,000 (10–20%), shown on every invoiceAbout the same $5,000–$10,000, inside the lump sum$2,500–$7,500 (5–15%); nothing if you run it yourself
What you seeEvery sub invoice and material receipt plus the feeOne price; the GC's margin and cushion are privateYou see and sign every contract, because they are yours
Who carries cost overrunsYou, unless there is a not-to-exceed capThe GC, within the agreed scope; changes are extraYou
Best whenThe scope is still moving or the house is old and full of surprisesDrawings and finishes are locked and bid by three GCsYou have time, a flexible job and know the trades
Materials markup7.5–20% on top of cost, statedInside the priceNone, but no contractor discount either
Change ordersCost plus the fee percentagePriced one by one: $5,500–$7,000 on a $5,000 changeNegotiated with each sub
Warranty and liabilityThe GC's, with insurance behind itThe GC's, with insurance behind itEach sub for their own work; gaps are yours
Typical saving vs cost-plus—None, but certaintyAbout $2,500 on $50,000 at typical prices, for your time and risk

Whichever contract you pick, the money is the same on a $50,000 job: about $7,500 to the GC and $42,500 to everyone else. The contract type decides who sees the numbers and who pays when something goes wrong.

07 / Beyond the jobextras

Permits, Plans, Fees and Carrying Costs on a GC Project

Beyond the fee, a remodel or addition carries $1,700–$9,500 in permits and drawings, $300–$1,000 for an engineer's report, and change orders at $5,500–$7,000 on a $5,000 change. Budget the contingency too.

ItemLowTypicalHigh
Building permit, remodel or addition$500$1,300$2,500
Plans and drawings (designer or architect), addition$1,200$3,000$5,000
Structural engineer's report$300$600$1,000
Land survey (additions, ADUs, new builds)$400$900$1,800
Change order admin fee (per change)$100$250$500
Change order on a $5,000 change, all in$5,500$6,000$7,000
Contingency on a $50,000 remodel (10–20%)$5,000$7,500$10,000
Pre-construction consultation or detailed estimate (big jobs)$150$500$1,000
Deposit on a $50,000 contract (10–20%)$5,000$7,500$10,000

Permits are usually a pass-through at cost; drawings and engineering are separate contracts or a line in the GC's bid. The contingency is your money, not the GC's: hold it back and spend it only on signed change orders. A deposit of 10–20% is normal, and California caps it at 10% or $1,000, whichever is less.

08 / What moves the priceUSA

What affects general contractor costs

Project size

The fee is a percentage, so it scales: $5,000–$10,000 on $50,000, $15,000–$30,000 on $150,000, $40,000–$80,000 on a $400,000 house. Small jobs carry a higher percentage because the fixed work is the same.

Complexity and structure

Anything with a structural engineer's report ($300–$1,000), a bearing wall ($3,000–$15,000) or a roof coming off pushes the fee toward 20%. A full second story ($120,000–$300,000) costs about twice a ground-floor addition ($50,000–$100,000) for the same space.

Contract type

Cost-plus shows the fee and floats with real costs; fixed price hides it inside one number plus a risk cushion; time-and-materials bills $50–$150 an hour. Materials carry 7.5–20% markup on top.

Permits, inspections and change orders

Permits and drawings run $1,700–$9,500 and 4 to 12 weeks. Each $5,000 change mid-project costs $5,500–$7,000, and additions typically overrun by 5–20%.

Your city

Labor drives the gap between cities. San Francisco ($8,600 typical fee on $50,000) sits at the top and Brownsville ($6,750) at the bottom, against the US typical of $7,500. Construction supervisors' median pay runs from under $60,000 in parts of South Texas to over $120,000 in Seattle and the Bay Area.

The age of the house

Once a permit opens the walls, inspectors can require wiring, plumbing and framing brought to code. On a pre-1980 house, carry a 20% contingency and expect the GC's fee at the high end for the extra coordination.

09 / How to pay lessUSA

How to save on general contractor

  1. Lock the design and finishes before you sign.A $5,000 change after signing costs $5,500–$7,000 once markup and admin fees land. Pick cabinets, tile and fixtures first.
  2. Get three itemized bids on the same drawings.Fees on the same $50,000 job can differ by $2,500 between GCs. Make every bid list the fee, the allowances and the exclusions.
  3. Bundle work under one contract.A kitchen and a bath under one GC share one mobilization and one fee negotiation; a whole-house renovation ($50,000–$200,000) is cheaper per room than rooms done one at a time.
  4. Keep the footprint and the roofline.Building out is $100–$250 a square foot; building up $200–$500. A basement finish ($22,000–$50,000) or a bump-out is cheaper than either.
  5. Start in the off-season.Interior remodels in winter keep crews busy when additions and foundations stop. Ask for a January start and a sharper fee.
  6. Check the license and insurance before the deposit.A deposit above 20% and no certificate of insurance are the two warning signs that cost homeowners the most. Both checks are free.

Get two real quotes

Local general contractors · free · max 2 will contact you · no spam.

Get quotes →
10 / By sizescale

General Contractor Cost by Project Size

Quick answer

$50,000 remodel: fee $5,000–$10,000. $150,000 addition: $15,000–$30,000. $400,000 new house: $40,000–$80,000. Whole projects, fee included: $50,000–$100,000 for a 400 sq ft addition, $120,000–$300,000 for a full second story, $50,000–$200,000 for a 2,000 sq ft whole-house renovation and $250,000–$550,000 to tear down and rebuild 2,000 sq ft.

Worked example: a 400 sq ft room addition at $75,000 typical. The GC's 15% is about $11,250; permits and drawings add $4,500; a structural engineer's report $550. Carry a 10% contingency ($7,500) and the realistic budget is about $87,550, which is why two addition quotes can look nothing alike until you line up what each one includes.

Going up costs more than going out. A full second story is $175,000 typical against $75,000 for a 400 sq ft ground-floor addition, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $100–$250 and building up $200–$500.

11 / Before you pay a depositchecklist

What a general contractor quote should include

A real general contractor bid answers all of these. If it answers fewer than six, ask before you pay a deposit.

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring, appliances) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping, temporary housing
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit, who meets the inspector, and who pays for re-inspections
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, with what happens if they slip
  • The warranty on the work, and lien releases from subs and suppliers at each payment
11.1 / Licensing by stateUSA

Does your general contractor need a license? What each state requires

About half the states license general contractors with an exam; a dozen only register them; the rest leave it to cities. Where there is no state license, the checks that matter are the city registration, insurance certificates and references.

RuleStatesWhat to ask for
State license with an examAlabama, Arizona, Arkansas, California, Florida, Georgia, Hawaii, Maryland, Massachusetts, Michigan, Minnesota, Mississippi, Nevada, New Mexico, North Carolina, Oregon, South Carolina, Tennessee, Utah, Virginia, West Virginia (DC, Montana, North Dakota and Wisconsin license without an exam)The license number, checked on the board's website, plus liability and workers' comp certificates
State registration (no trade exam)Alaska, Connecticut, Delaware, Idaho, Iowa, Louisiana, Nebraska, New Jersey, Pennsylvania, Rhode Island, Vermont, WashingtonThe registration number and the bond on file (Washington $30,000, Alaska $25,000)
No state GC licenseColorado, Illinois, Indiana, Kansas, Kentucky, Maine, Missouri, New Hampshire, Ohio, Oklahoma, South Dakota, Texas, WyomingCity or county registration (Dallas, Austin, Houston and San Antonio all register contractors), insurance certificates, references and the permit pulled in the GC's name
Local licensing on topNew York (New York City and several counties license home improvement contractors)The city or county home improvement license number

From a November 2026 state-by-state licensing table and state board pages (sources in our research notes). Thresholds and exemptions change; confirm with your state board before you sign. Not legal advice.

California is the strictest big state: any job of $1,000 or more, labor and materials together, needs a contractor licensed by the CSLB, and the deposit on a home improvement contract is capped at 10% or $1,000, whichever is less. Florida, Nevada, Arizona and Oregon license structural work at any size. Texas has no state general contractor license at all, so a Houston or Dallas GC's credentials are a city registration, insurance and the trade licenses (electrical, plumbing, HVAC) of the subs.

A license does not set the fee. The 10–20% range holds in licensed and unlicensed states alike; what the license buys you is a board that can discipline the GC, a bond or recovery fund in some states, and a permit pulled in the contractor's name rather than yours. An unlicensed GC on a job that needs a permit usually means the homeowner pulls the permit as an owner-builder and carries the liability.

  • Check the license or registration number on the state board's site, not on the GC's card
  • Ask for certificates of general liability and workers' comp naming the GC's business, dated this year
  • Make sure the permit is pulled in the GC's name; an owner-builder permit shifts the liability to you
  • In a no-license state, ask which city registration the GC holds and call two references from the past year

The license check is free and takes five minutes. A GC who cannot produce a number in a licensing state is the one case where the cheapest bid should be thrown out unread.

11.2 / Material prices and tariffs2025–2026

Why bids rose in 2025–2026: tariffs on lumber, steel, aluminum and cabinets

The National Association of Home Builders' April 2025 survey put the tariff cost at about $10,900 per new home, and more than 60% of builders reported higher material costs. Building materials are up about 40% since December 2020. A GC's fee is a percentage, so every one of those increases flows into the fee as well as the bill.

Material2025–2026 tariff or dutyWhere it shows upWhat to do
Canadian softwood lumberAnti-dumping and countervailing duties raised from 14.5% to 35% in 2025, plus a 10% Section 232 tariff on timber and lumber; Canadian lumber prices up about 45%Framing for additions, second stories, garages, decks and new homesPrice the framing package early; ask for an escalation clause instead of a padded bid
Steel and aluminum50% Section 232 tariff, still in effect in 2026Beams for wall removals, rebar, fasteners, railings, windows and doorsSpecify LVL or engineered wood beams where the structural engineer allows
Kitchen cabinets and vanities (imported)25% tariff, due to expire January 1, 2027Kitchen and bath remodels, ADUsGet the cabinet allowance in writing and order before the contract is signed
CopperCited by builders among the sharpest 2025 increasesWiring, plumbing, HVAC line setsHave the electrician and plumber bid from drawings, not allowances
Most other importsAfter the Supreme Court's February 20, 2026 ruling struck the IEEPA tariffs, a 10% global Section 122 tariff (capped at 15%, 150 days unless Congress extends it)Tile, fixtures, appliances, lightingBuy long-lead finishes early; keep receipts for cost-plus contracts

Tariff rates and dates from the National Association of Home Builders' trade-policy page (2026). Rates change quickly; the bid you sign should say who carries a material price move.

Materials are roughly half of a remodel or addition (labor is 40–60%), so a 10% move in materials is about 5% on the project — and 5% on the GC's fee with it. Only about 7% of the goods in a new home are imported ($14 billion of $194 billion in 2025), but lumber, steel, aluminum and cabinets are exactly the parts a GC buys most of, which is why fixed-price bids now carry escalation clauses and why cost-plus contracts pass the increase straight through.

Our year-on-year figure of 2% weights supervisors' pay (+1.6% in federal data, May 2024 to May 2025) against a materials leg of about 2.5%. The fee itself did not change its percentage; the project it is charged on got dearer.

  • On a $75,000 addition, a 10% material move is roughly $3,750 on the bill
  • Ask whether the bid is fixed, fixed with an escalation clause, or cost-plus — each puts the tariff risk on a different person
  • Order cabinets, windows, doors and appliances as soon as the contract is signed; they carry the biggest tariffs and the longest lead times

If a bid jumps between the estimate and the contract, ask for the material invoices that moved. Tariffs are real, but they are also the easiest excuse for a quiet fee increase.

11.3 / What the cheap bid leaves outUSA

What the cheap bid leaves out, and how change orders turn it into the expensive one

Two bids for the same $50,000 remodel can differ by $2,500 in fee alone and far more in scope. Additions typically run 5% to 20% over the quote, almost all of it change orders. Here is what to look for before you sign.

The honest way to compare bids is to make them identical in scope first: same drawings, same allowances, same exclusions, same permit responsibility. Then the fee (10–20%) and the sub pricing are the only differences left. On a $50,000 remodel that usually leaves bids within $2,500 of each other; a bid far below that is missing something you will pay for later.

Timing helps too. Interior remodels in winter keep crews busy when additions and foundations stop, and a January start can bring the fee down a point or two. A GC's hourly rate ($50–$150) is the right tool for a half-day consult before you commit, and a pre-construction estimate on a big job ($150–$1,000) is often credited back if you sign.

  1. Low allowances.A bid with $3,000 for cabinets and $1,500 for tile looks cheap until you pick real products. Ask for the allowance for every finish and compare it to the price of what you actually want.
  2. Permits and drawings left out.Permits and plans for a remodel or addition run $1,700–$9,500 and are often listed as 'by owner' in a low bid. Make every bid price them the same way.
  3. No contingency and no change-order rule.A $5,000 change mid-project costs $5,500–$7,000 once the GC adds 10–30% markup and a $100–$500 admin fee. Get the rule in writing and carry a 10–20% contingency of your own.
  4. Engineering, dumpster, utility connections, landscaping.The structural engineer's report ($300–$1,000), the dumpster, the utility hookups on an ADU and the lawn after an addition are the usual exclusions. Ask for the exclusions list.
  5. No insurance, no license, cash price.The cheapest bid is often cheapest because it skips liability and workers' comp insurance and the state or city license. A fall on your property is then your problem.
  6. Half up front.A deposit above 20% is a warning sign, and in California anything above 10% or $1,000 is illegal on a home improvement contract. Tie payments to milestones and hold 10% until final inspection.

Managing it yourself saves the fee ($7,500 typical on $50,000) and costs you the GC's schedule, discounts, warranty and liability. For a bathroom it can work; for a second story or a new house, the fee is cheap.

12 / QuestionsUSA

General contractor cost: FAQ

How much does a general contractor cost?

$5,000–$10,000 to run a $50,000 remodel in 2026, a fee of 10% to 20% on top of labor and materials, with $7,500 typical. On a $150,000 addition the fee is $15,000–$30,000; to build a $400,000 house, $40,000–$80,000.

What percentage do general contractors charge?

10% to 20% of the project cost, 15% typical. Large or complex jobs run toward 25%, and the builder-platform range is 10–30%. Materials often carry a further 7.5–20% markup.

How much do general contractors charge per hour?

$50–$150 an hour for consulting and small jobs, or $300–$500 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost?

$50,000–$100,000 for a finished 400 sq ft room, or $100–$250 a square foot building out. A full second story is $120,000–$300,000 and a detached 600 sq ft ADU $120,000–$300,000.

How much does it cost to build a house per square foot?

$130–$250 a square foot for construction at a standard finish, so $260,000–$500,000 for 2,000 sq ft before land. The NAHB's 2024 survey put the average construction cost at $428,215.

How much does a whole-house renovation cost?

$50,000–$200,000 for a 2,000 sq ft home, $115,000 typical, for kitchen, baths, floors, paint and systems. A full gut to the studs is $60–$150 a square foot; tearing down and rebuilding is $250,000–$550,000.

Does a general contractor need a license?

In most states, yes, above a dollar threshold: California from $1,000 (CSLB), Florida and Nevada for structural work at any size, Washington and Oregon for all paid construction, North Carolina from $40,000, Louisiana from $7,500 (registration) and $75,000 (license). Texas, Colorado, Illinois, Ohio, Missouri and a handful of others have no state GC license and leave it to cities. Everywhere, ask for proof of insurance. Not legal advice.

Cost-plus or fixed price: which is cheaper?

Neither, usually: the fee is about $7,500 on a $50,000 job either way. Cost-plus shows it and floats with real costs; fixed price hides it and adds a cushion for risk. Cost-plus suits a moving scope; fixed price suits locked drawings bid by three GCs.

How much should I pay a contractor up front?

10–20% as a deposit, then milestone payments, holding 10% until final inspection. California caps the deposit at 10% or $1,000, whichever is less. Half up front is a warning sign.

Are general contractor prices going up in 2026?

Slowly: about 2% over the past year in our model. Construction supervisors' median pay rose 1.6% in federal data (May 2024 to May 2025), and materials rose faster after the 2025 tariffs on lumber, steel, aluminum, copper and imported cabinets, but the GC's fee is a percentage, so it moves with the whole project rather than ahead of it.