How much does a general contractor cost in Lincoln?
By Our research team · Last verified · Methodology
Most general contractors in Lincoln charge $4,900–$9,600 to run a $50,000 remodel the fee for finding, scheduling and standing behind every sub on the job. $7,200 is the going rate; a detached two-car garage is $19,300–$47,000 and a new house $125–$235 a square foot.
How we get this data- Typical
- $7,200
- Low end
- $3,850
- High end
- $12,050
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.
Get my fair quote →The typical Lincoln price is $7,200, 4% below the US typical of $7,500.
Lincoln's price band
Lincoln is cheaper than 68% of the 195 US metros we price for general contractor work.
Hiring a general contractor in Lincoln costs $4,900–$9,600 on a $50,000 project, with most homeowners paying about $7,200, or 14.4% of the job. GCs here bill $50–$140 an hour for small jobs and consulting, a basement finish runs $21,500–$47,000, and a full second story $116,000–$283,000.
Lincoln is a smaller market. A GC's fee on a $50,000 remodel here is about 4% below the US typical of $7,500, and the whole project moves with it: the subs' wages, the permit fees and the cost of getting materials to the site all run about 4% below the national figure.
Nebraska registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance. This is general information, not legal advice.
Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.
$4,900–$9,600 — typically $7,200 — is what a general contractor charges to run a $50,000 remodel in Lincoln, a 9.8–19.2% fee on top of labor and materials. A 400 sq ft addition runs $48,500–$94,500 all in, a mid-range kitchen $24,000–$61,500, and new construction $125–$235 a square foot. Verified November 2026. Get free Lincoln quotes →
- GC fee on a $50,000 remodel: $4,900–$9,600 ($7,200 typical, 14.4%)
- Hourly $50–$140; day rate $285–$460; construction manager $2,450–$7,200
- Room addition, 400 sq ft: $48,500–$94,500; second story $116,000–$283,000
- Kitchen $24,000–$61,500; bath $8,200–$22,500; basement finish $21,500–$47,000
- New construction $125–$235 per sq ft; whole-house renovation $48,500–$188,500
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Lincoln metro, re-verified November 2026. Permits, engineering and change orders are their own rows.
| Service | Low | Typical | High |
|---|---|---|---|
| General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project | $4,900per $50k project | $7,200 | $9,600 |
| General contractor fee on a $150,000 addition or major remodelper $150k project | $14,700per $150k project | $21,500 | $29,000 |
| General contractor fee to build a $400,000 houseper $400k build | $39,000per $400k build | $57,500 | $77,000 |
| General contractor hourly rate (consulting, small jobs)/hr | $50/hr | $70 | $140 |
| General contractor day rate (working on your site)per day | $285per day | $370 | $460 |
| Project management only (construction manager) on a $50,000 jobper $50k project | $2,450per $50k project | $4,800 | $7,200 |
| Change order: a $5,000 mid-project change (markup plus admin fee)per change | $5,400per change | $5,750 | $6,750 |
| Building permit and plans for a remodel or additionper project | $1,650per project | $4,200 | $8,850 |
| Structural inspection and written reportper job | $290per job | $515 | $940 |
| Minor structural repair (header or lintel, crack stitching, wall ties)per job | $1,150per job | $2,350 | $4,700 |
| Remove a load-bearing wall and install a beam (single story)per job | $2,900per job | $6,600 | $14,100 |
| Deck build, about 200 sq ft, run by a general contractorper project | $4,350per project | $7,550 | $14,150 |
| Covered patio or porch addition, about 200 sq ftper project | $7,750per project | $15,100 | $28,500 |
| Detached two-car garage, built from the slab upper project | $19,300per project | $28,500 | $47,000 |
| Basement finish, about 1,000 sq ftper project | $21,500per project | $33,000 | $47,000 |
| Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project | $8,200per project | $13,700 | $22,500 |
| Kitchen remodel, mid-range, run by a general contractorper project | $24,000per project | $38,000 | $61,500 |
| Home addition, building out, per sq ftper sq ft | $95per sq ft | $165 | $235 |
| Room addition, 20 × 20 ft (400 sq ft), finishedper project | $48,500per project | $70,500 | $94,500 |
| Full second-story additionper project | $116,000per project | $165,000 | $283,000 |
| Detached ADU, 600 sq ft one-bedroom, turnkeyper unit | $116,000per unit | $170,000 | $283,000 |
| Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project | $48,500per project | $108,500 | $188,500 |
| New home construction, per sq ft (standard finish, no land)per sq ft | $125per sq ft | $155 | $235 |
| Tear down and rebuild a 2,000 sq ft houseper project | $241,500per project | $330,000 | $519,000 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local general contractors in Lincoln
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning to build or remodel?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the general contractors who reply.
Where should they text you?
- Max 2 general contractors. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched general contractors see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 general contractors about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Prices cover the Lincoln metro. Outlying towns can run a little lower; tight lots and older houses in Downtown & the Haymarket and North Lincoln & University Place sit at the top of each range.
General contractor prices across Lincoln
Same job, four price bands. Parking, permits and old buildings push Downtown & the Haymarket to the top; fees in UNL & the Railyard tend to come in at or under the city typical, and South Lincoln & Waverly has the bigger additions and garages.
Downtown & the Haymarket
- Fee on a $50k job
- $5,300–$11,050 per $50k project
- 400 sq ft addition
- $52,500–$108,500 / 400 sq ft addition
Older buildings, tight lots and paid parking. Permits take longer, dumpsters need street permits, and condo or co-op boards add insurance and work-hour rules, so GC fees here run at the top of the city range.
North Lincoln & University Place
- Fee on a $50k job
- $5,050–$10,350 per $50k project
- 400 sq ft addition
- $50,000–$102,000 / 400 sq ft addition
A remodel-heavy area of older houses being opened up. Load-bearing wall removals, kitchen expansions and second stories are common, so GCs here price for the unknowns behind old walls.
UNL & the Railyard
- Fee on a $50k job
- $4,650–$9,400 per $50k project
- 400 sq ft addition
- $46,000–$92,500 / 400 sq ft addition
Older housing near campus, much of it rented. Many GCs here quote flat prices for standard unit refreshes, which keeps fees down.
South Lincoln & Waverly
- Fee on a $50k job
- $4,900–$10,000 per $50k project
- 400 sq ft addition
- $48,500–$98,500 / 400 sq ft addition
Newer subdivisions with HOA design review on top of the city permit. Fees are average; the HOA approval adds weeks, not dollars, unless the design has to change.
Real-World General Contractor Costs in Lincoln
Here's what common general contractor jobs cost in Lincoln in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.
GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks
The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Lincoln homeowners pay about $7,200 (14.4%) for that; a structural change or a co-op board pushes the fee toward $9,600.
Remove a load-bearing wall for an open kitchen — 3 to 5 days
A structural engineer sizes the beam ($290–$940 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $2,900–$14,100 in Lincoln for a single-story wall; a two-story wall or a hidden flush beam costs more.
400 sq ft room addition, finished — 3 to 5 months
Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $48,500–$94,500 all in, of which the GC's fee is about $10,600 at 14.4%. Permits and drawings ($1,650–$8,850) come first and take 4 to 12 weeks in most cities.
Detached two-car garage from the slab up — 4 to 8 weeks
Slab, framing, roof, siding, one overhead door and a basic electrical panel. $19,300–$47,000 in Lincoln; finishing the inside, a second story or an ADU conversion is a different project.
Whole-house renovation of a 2,000 sq ft home — 4 to 8 months
Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $48,500–$188,500 in Lincoln, GC fee included; a full gut to the studs runs $113,000–$283,000.
How much does a general contractor cost in Lincoln?
Between $4,900 and $9,600 on a $50,000 remodel, and $7,200 is the fee most Lincoln homeowners pay. The fee is 9.8% to 19.2% of the project and it buys the GC's time: bidding, hiring and scheduling the subs, pulling permits, meeting inspectors and carrying the insurance and the warranty.
The fee scales with the job: $14,700–$29,000 on a $150,000 addition and $39,000–$77,000 to build a $400,000 house. Whole projects, GC included, run $48,500–$94,500 for a 400 sq ft addition and $48,500–$188,500 for a 2,000 sq ft whole-house renovation. Prices re-checked against 23 sources in November 2026.
General contractor prices in Lincoln (2026): fees, remodels, additions and new builds
The GC's fee on a $50,000 remodel is $4,900–$9,600, a 400 sq ft addition $48,500–$94,500, and new construction $125–$235 a square foot.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| GC fee on a $50,000 remodel | $4,900 | $7,200 | $9,600 |
| GC fee on a $150,000 addition | $14,700 | $21,500 | $29,000 |
| GC hourly rate | $50 | $70 | $140 |
| Kitchen remodel, mid-range | $24,000 | $38,000 | $61,500 |
| Room addition, 400 sq ft | $48,500 | $70,500 | $94,500 |
| Full second-story addition | $116,000 | $165,000 | $283,000 |
| Whole-house renovation, 2,000 sq ft | $48,500 | $108,500 | $188,500 |
| New home construction, per sq ft | $125 | $155 | $235 |
Percentage or lump sum, the money is the same in Lincoln: $7,200 on a $50,000 job is a 14.4% fee. Ask for the fee as a number and as a percentage, and ask what it covers; a bid that hides the fee inside the sub prices is harder to compare.
What moves a general contractor's quote in Lincoln:
- Project size and complexity — the fee is 9.8–19.2% of the job, so $4,900–$9,600 on $50,000 and $14,700–$29,000 on $150,000. Structural work, tight sites and many subs push the percentage up.
- Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,200 typical on a $50,000 scope.
- Permits and drawings — $1,650–$8,850 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
- Change orders — a $5,000 mid-project change costs $5,400–$6,750 once markup and an admin fee are added. Lock the design before you sign.
- The age of the house — once walls are open, inspectors in Lincoln can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.
Ask every Lincoln general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →
General Contractor Cost in Lincoln by Project Size
$50,000 remodel: GC fee $4,900–$9,600. $150,000 addition: $14,700–$29,000. $400,000 new house: $39,000–$77,000. The whole project, GC included, runs $48,500–$94,500 for a 400 sq ft addition, $116,000–$283,000 for a full second story and $241,500–$519,000 to tear down and rebuild 2,000 sq ft.
Worked example: a Lincoln 400 sq ft room addition at $70,500 typical. The GC's 14.4% is about $10,600; permits and drawings add $4,200; a structural engineer's report $515. Carry a 10% contingency ($7,050) for what the crew finds under the siding, and the realistic budget is about $82,265.
Going up costs more than going out. A full second story is $165,000 typical against $70,500 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $95–$235 and building up $190–$470.
Lincoln General Contractor Costs by Contract and Job Type
| Contract or job type | Cost | Best for |
|---|---|---|
| Cost-plus GC (fee as a percentage) | $4,900–$9,600 fee on a $50,000 job | You pay the real cost of labor and materials plus the GC's fee, about 14.4% here. Fair when the scope is still moving; set a not-to-exceed cap. |
| Fixed-price (lump sum) GC bid | $4,900–$9,600 fee inside a $50,000 job | One price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans. |
| Construction manager (project management only) | $2,450–$7,200 fee on a $50,000 job | You hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you. |
| Hourly or day rate | $50–$140/hr | Small jobs, repairs and consulting, or $285–$460 a day for a GC working on site. Project work is quoted as a price instead. |
| Bathroom remodel, mid-range (GC-run) | $8,200–$22,500 per project | The most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes. |
| Kitchen remodel, mid-range (GC-run) | $24,000–$61,500 per project | Cabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top. |
| Basement finish, 1,000 sq ft | $21,500–$47,000 per project | The cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it. |
| Room addition, 400 sq ft (building out) | $48,500–$94,500 per project | New footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $95–$235 a square foot. |
| Full second-story addition (building up) | $116,000–$283,000 per project | Roof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months. |
| Whole-house renovation, 2,000 sq ft | $48,500–$188,500 per project | Kitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time. |
| Detached two-car garage | $19,300–$47,000 per project | A shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project. |
| Detached ADU, 600 sq ft turnkey | $116,000–$283,000 per project | A small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows. |
| New home, 2,000 sq ft (construction only) | $250,000–$470,000 per project | The GC is the builder, at $125–$235 a square foot. Land, design, permits and utility hookups sit on top. |
| Structural work: remove a bearing wall | $2,900–$14,100 per project | Jobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector. |
The fee vs. the project — what a Lincoln general contractor bill really covers
On a $50,000 remodel in Lincoln, the general contractor keeps about $7,200 — the 14.4% fee. The other $42,800 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.
The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,450–$7,200 and saves about $2,400 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.
What's included in a Lincoln general contractor quote (and what costs extra)
A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:
- Permits and drawings — $1,650–$8,850 for a remodel or addition, often billed as a pass-through
- Engineering — $290–$940 for a structural report on any bearing wall or addition
- Change orders — $5,400–$6,750 on a $5,000 change once markup and admin fees are added
- Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup
Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.
Project size
The fee scales with the job: $4,900–$9,600 on $50,000, $14,700–$29,000 on $150,000, $39,000–$77,000 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.
Contract type
Cost-plus states the fee (9.8–19.2% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $50–$140 an hour plus costs and suits small or open-ended jobs.
Structural work and permits
Anything that needs a structural engineer's report ($290–$940) and a building permit ($1,650–$8,850 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $2,900–$14,100 in Lincoln.
Change orders
A $5,000 change mid-project costs $5,400–$6,750 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.
Local rules and licensing
Nebraska registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance.
Labor rates in Lincoln
Construction supervisors in the Lincoln metro earn a median $77,270 a year in federal wage data, about 3% below the US median. Labor is 40% to 60% of a remodel or addition, so Lincoln projects land about 4% below the US typical.
Season and schedule
Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Lincoln GCs sharpen their fee to keep crews working.
- Lock the design and finishes before you sign.Every change after the contract costs $5,400–$6,750 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
- Get three itemized bids on the same drawings.Two Lincoln bids can differ by $2,300 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
- Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($48,500–$188,500) costs less per room than the rooms done one at a time.
- Keep the footprint and the roofline.Building out costs $95–$235 a square foot; building up costs about twice that ($116,000–$283,000 for a full second story). A bump-out or a basement finish ($21,500–$47,000) is cheaper than either.
- Ask about an off-season start.Interior work in winter is slower for most Lincoln GCs, and a start date in January or February can bring the fee down a point or two.
- Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
Lincoln general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:
- The GC's fee as a percentage and a dollar figure, and what it covers
- Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
- Exclusions: permits, engineering, dumpster, utility connections, landscaping
- How change orders are priced: markup percentage and any admin fee
- Who pulls the permit and who meets the inspector
- A payment schedule tied to milestones, with the deposit capped
- The license or registration number where your state has one, plus liability and workers' comp certificates
- Start and finish dates, the warranty on the work, and lien releases from subs at each payment
How much does a general contractor cost in Lincoln?
$4,900–$9,600 (typically $7,200 here) to run a $50,000 remodel — a fee of 9.8% to 19.2% on top of labor and materials. On a $150,000 addition the fee is $14,700–$29,000.
What percentage do general contractors charge in Lincoln?
About 9.8% to 19.2% of the project cost, 14.4% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.
How much do general contractors charge per hour in Lincoln?
$50–$140 an hour for consulting and small jobs, or $285–$460 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.
How much does a home addition cost in Lincoln?
$48,500–$94,500 for a finished 400 sq ft room addition, about $95–$235 a square foot building out. A full second story runs $116,000–$283,000.
How much does it cost to build a house in Lincoln?
About $125–$235 a square foot for construction at a standard finish, so $250,000–$470,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $241,500–$519,000.
How much does a whole-house renovation cost in Lincoln?
$48,500–$188,500 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.
Do I need a licensed general contractor in Nebraska?
Nebraska registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance.
Is cost-plus or a fixed price better?
Cost-plus shows the fee (9.8–19.2% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,200.
How much should I pay a general contractor up front?
No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.
What's included in a Lincoln general contractor quote?
The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,650–$8,850), engineering ($290–$940), change orders ($5,400–$6,750 on a $5,000 change) and anything above an allowance.
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Prices for the Lincoln metro area, November 2026. Outer suburbs may vary.
Get a fair general contractor quote in Lincoln
Local general contractors · Free quotes · No obligation, no spam.