Kitchen Remodel Cost USA 2026: Prices by Level, Line and City
By Our research team · Last verified · 14 min read · Methodology
Kitchen remodel costs in the US
What most homeowners pay for kitchen remodel, labor and materials included unless the row says otherwise. Pick your city for local prices.
How we get this data- Typical
- $37,000
- Low end
- $14,500
- High end
- $83,000
A mid-range kitchen remodel in the USA costs $22,000–$60,000 in 2026, and most homeowners pay about $37,000 for a 10×12 kitchen done in the same layout — new cabinets, quartz or granite counters, tile backsplash, mid-priced appliances, new flooring, updated electrical and plumbing, permits and labor. A cosmetic refresh that keeps the cabinets runs $8,000–$25,000; an upscale remodel with a new layout $60,000–$130,000; a luxury kitchen $120,000–$250,000.
$22,000–$60,000 for a mid-range US kitchen remodel — $37,000 typical for a 10×12 kitchen in the same layout. Budget $8,000–$25,000 for a cosmetic refresh, $3,000–$13,000 for semi-custom cabinets and $2,000–$6,000 for 40 sq ft of quartz. Pick your city ↓
- US mid-range kitchen remodel (10×12): $22,000–$60,000, $37,000 typical
- Cosmetic refresh $8,000–$25,000; budget remodel $12,000–$30,000; upscale $60,000–$130,000; luxury $120,000–$250,000
- Cabinets installed: $2,000–$6,000 stock, $3,000–$13,000 semi-custom, $10,000–$24,000 custom
- Quartz counters $50–$150/sq ft; appliance package $3,000–$15,000; permits $500–$2,500
- Pick a city below for local prices across 195 US metros
Prices come from 76 public sources — national cost guides, remodeler and designer price pages, the Cost vs Value and Houzz surveys, retail prices, federal wage data, tariff proclamations and state licensing rules — checked in November 2026 and priced for 195 US metros, 18 of them anchored to dated local price guides. Whole-project rows include demolition, trades, permits and the contractor's fee; appliances are a separate row.
Mid-range kitchen remodels run $22,000–$60,000 across the US, and the median construction supervisor earns $79,920 a year ($38.42/hr) in federal data — labor is 20–35% of the bill, cabinets 25–40%. The highest typical prices on our city pages are in Los Angeles, Seattle, Orange County, Long Beach and San Francisco; the lowest are in McAllen, Little Rock, Brownsville, Montgomery and Killeen. Credible prices for the same mid-range job run from about $14,500 in the cheapest markets to $83,000 for a 200 sq ft gut remodel with an island.
Prices verified November 2026 · Cross-referenced against 76+ American pricing sources · See methodology
Kitchen remodel cost by city
Typical kitchen remodel ranges, re-verified November 2026 across 76+ sources. Largest cities first.
Among the biggest metros, Los Angeles is the priciest at $56,000 and Houston the least at $35,000.
Half of the 195 metros we price sit between $32,100 and $38,000.
| City | Typical range |
|---|---|
| New York, NY | $30,000–$85,000 per project |
| Los Angeles, CA | $36,000–$88,000 per project |
| Chicago, IL | $26,000–$72,000 per project |
| Dallas, TX | $23,000–$62,000 per project |
| Houston, TX | $20,000–$56,000 per project |
| Washington, DC | $24,500–$66,800 per project |
| Atlanta, GA | $23,900–$65,100 per project |
| Philadelphia, PA | $24,000–$64,000 per project |
| Miami, FL | $24,000–$66,000 per project |
| Phoenix, AZ | $25,000–$68,000 per project |
| Boston, MA | $27,800–$75,700 per project |
| San Francisco, CA | $31,700–$86,500 per project |
| Riverside, CA | $21,400–$58,400 per project |
| Detroit, MI | $22,100–$60,400 per project |
| Seattle, WA | $30,000–$90,000 per project |
| Minneapolis, MN | $26,300–$71,800 per project |
| San Diego, CA | $25,000–$68,100 per project |
| Tampa, FL | $21,000–$57,400 per project |
| Orange County, CA | $36,000–$88,000 per project |
| Denver, CO | $22,700–$61,800 per project |
| Oakland, CA | $29,400–$80,100 per project |
| Charlotte, NC | $21,500–$58,600 per project |
| Baltimore, MD | $21,600–$58,800 per project |
| St. Louis, MO | $25,100–$68,500 per project |
| Orlando, FL | $21,200–$57,900 per project |
| Brooklyn, NY | $30,000–$85,000 per project |
| San Antonio, TX | $19,700–$53,800 per project |
| Fort Worth, TX | $23,000–$62,000 per project |
| Austin, TX | $21,600–$58,900 per project |
| Portland, OR | $27,900–$76,200 per project |
| Sacramento, CA | $25,200–$68,600 per project |
| Pittsburgh, PA | $22,600–$61,600 per project |
| Las Vegas, NV | $22,100–$60,400 per project |
| Cincinnati, OH | $22,100–$60,300 per project |
| Kansas City, MO | $22,800–$62,200 per project |
| Columbus, OH | $22,500–$61,300 per project |
| Newark, NJ | $26,500–$72,100 per project |
| Nashville, TN | $23,500–$64,200 per project |
| Indianapolis, IN | $23,000–$62,800 per project |
| Cleveland, OH | $22,100–$60,400 per project |
| San Jose, CA | $30,900–$84,200 per project |
| Fort Lauderdale, FL | $21,500–$58,700 per project |
| Virginia Beach, VA | $21,100–$57,500 per project |
| Jacksonville, FL | $20,500–$55,900 per project |
| Providence, RI | $24,000–$65,500 per project |
| Milwaukee, WI | $24,200–$66,100 per project |
| Raleigh, NC | $21,600–$58,800 per project |
| Oklahoma City, OK | $19,900–$54,400 per project |
| West Palm Beach, FL | $20,500–$55,800 per project |
| New Orleans, LA | $21,600–$58,800 per project |
| Memphis, TN | $21,200–$57,800 per project |
| Richmond, VA | $21,400–$58,300 per project |
| Louisville, KY | $21,900–$59,600 per project |
| Salt Lake City, UT | $21,800–$59,400 per project |
| Hartford, CT | $22,800–$62,200 per project |
| Birmingham, AL | $19,300–$52,600 per project |
| Buffalo, NY | $21,300–$58,100 per project |
| Rochester, NY | $21,200–$57,700 per project |
| Grand Rapids, MI | $20,100–$54,700 per project |
| Tucson, AZ | $19,300–$52,700 per project |
| Honolulu, HI | $26,300–$71,700 per project |
| Tulsa, OK | $20,000–$54,500 per project |
| Fresno, CA | $21,600–$58,900 per project |
| Omaha, NE | $18,000–$50,000 per project |
| St. Petersburg, FL | $20,000–$54,500 per project |
| Worcester, MA | $22,300–$60,800 per project |
| Bridgeport, CT | $23,100–$63,000 per project |
| Greenville, SC | $18,900–$51,600 per project |
| Tacoma, WA | $28,000–$76,300 per project |
| Albuquerque, NM | $20,000–$54,600 per project |
| Bakersfield, CA | $21,900–$59,600 per project |
| Albany, NY | $21,600–$58,900 per project |
| Knoxville, TN | $18,400–$50,300 per project |
| McAllen, TX | $16,500–$45,000 per project |
| Baton Rouge, LA | $20,700–$56,500 per project |
| El Paso, TX | $16,700–$45,700 per project |
| Sarasota, FL | $19,300–$52,700 per project |
| New Haven, CT | $22,300–$60,900 per project |
| Columbia, SC | $19,600–$53,400 per project |
| Oxnard, CA | $21,500–$58,600 per project |
| Charleston, SC | $20,400–$55,800 per project |
| Dayton, OH | $19,900–$54,100 per project |
| Boise, ID | $20,000–$52,000 per project |
| Fort Myers, FL | $19,000–$51,900 per project |
| Stockton, CA | $20,200–$55,200 per project |
| Greensboro, NC | $18,600–$50,700 per project |
| Lakeland, FL | $18,900–$51,400 per project |
| Colorado Springs, CO | $19,400–$52,800 per project |
| Little Rock, AR | $16,500–$45,000 per project |
| Des Moines, IA | $18,000–$50,000 per project |
| Wilmington, DE | $22,500–$61,300 per project |
| Akron, OH | $19,900–$54,300 per project |
| Daytona Beach, FL | $18,700–$51,000 per project |
| Provo, UT | $19,100–$52,200 per project |
| Springfield, MA | $20,400–$55,700 per project |
| Ogden, UT | $19,200–$52,400 per project |
| Winston-Salem, NC | $18,800–$51,300 per project |
| Madison, WI | $22,100–$60,200 per project |
| Syracuse, NY | $20,000–$54,600 per project |
| Durham, NC | $20,100–$54,700 per project |
| Wichita, KS | $19,200–$52,300 per project |
| Toledo, OH | $19,500–$53,300 per project |
| Augusta, GA | $18,800–$51,300 per project |
| Palm Bay, FL | $19,200–$52,300 per project |
| Jackson, MS | $18,400–$50,100 per project |
| Harrisburg, PA | $20,900–$56,900 per project |
| Spokane, WA | $22,000–$59,900 per project |
| Chattanooga, TN | $19,000–$51,700 per project |
| Fayetteville, AR | $16,900–$46,000 per project |
| Scranton, PA | $19,600–$53,400 per project |
| Portland, ME | $19,700–$53,700 per project |
| Modesto, CA | $21,700–$59,200 per project |
| Lansing, MI | $19,500–$53,300 per project |
| Youngstown, OH | $18,800–$51,200 per project |
| Fayetteville, NC | $18,100–$49,300 per project |
| Lexington, KY | $19,200–$52,400 per project |
| Huntsville, AL | $16,700–$45,500 per project |
| Pensacola, FL | $18,100–$49,500 per project |
| Myrtle Beach, SC | $18,100–$49,300 per project |
| Mesa, AZ | $25,000–$68,000 per project |
| Reno, NV | $19,900–$54,300 per project |
| Springfield, MO | $19,700–$53,800 per project |
| Santa Rosa, CA | $23,700–$64,800 per project |
| Asheville, NC | $18,700–$51,000 per project |
| Killeen, TX | $16,600–$45,400 per project |
| Visalia, CA | $19,700–$53,800 per project |
| Lafayette, LA | $18,400–$50,200 per project |
| Long Beach, CA | $36,000–$88,000 per project |
| Santa Barbara, CA | $21,400–$58,300 per project |
| Salinas, CA | $21,700–$59,200 per project |
| Mobile, AL | $17,900–$48,700 per project |
| Corpus Christi, TX | $17,500–$47,600 per project |
| Manchester, NH | $20,500–$55,900 per project |
| Salem, OR | $23,400–$63,800 per project |
| Fort Wayne, IN | $20,100–$54,900 per project |
| Brownsville, TX | $16,500–$45,000 per project |
| Gulfport, MS | $19,100–$52,100 per project |
| Appleton, WI | $23,000–$62,700 per project |
| Savannah, GA | $19,600–$53,400 per project |
| Anchorage, AK | $22,500–$61,400 per project |
| Beaumont, TX | $19,200–$52,300 per project |
| Flint, MI | $19,000–$51,800 per project |
| Peoria, IL | $22,900–$62,600 per project |
| Canton, OH | $20,100–$54,900 per project |
| Arlington, TX | $23,000–$62,000 per project |
| Shreveport, LA | $17,700–$48,400 per project |
| Tallahassee, FL | $18,500–$50,300 per project |
| Montgomery, AL | $16,500–$45,100 per project |
| Trenton, NJ | $23,900–$65,100 per project |
| Eugene, OR | $21,600–$58,800 per project |
| Davenport, IA | $20,900–$56,900 per project |
| Ann Arbor, MI | $20,200–$55,000 per project |
| Fort Collins, CO | $19,600–$53,400 per project |
| Gainesville, FL | $18,800–$51,300 per project |
| Lincoln, NE | $19,300–$52,700 per project |
| Rockford, IL | $23,500–$64,100 per project |
| Lubbock, TX | $16,700–$45,500 per project |
| Columbus, GA | $17,200–$46,800 per project |
| Boulder, CO | $20,200–$55,100 per project |
| Green Bay, WI | $20,100–$54,700 per project |
| Evansville, IN | $19,500–$53,300 per project |
| South Bend, IN | $20,200–$55,200 per project |
| Roanoke, VA | $17,400–$47,600 per project |
| Sioux Falls, SD | $19,600–$53,500 per project |
| Wilmington, NC | $18,200–$49,600 per project |
| Stamford, CT | $23,100–$63,000 per project |
| Waco, TX | $17,400–$47,400 per project |
| Jersey City, NJ | $26,500–$72,100 per project |
| Duluth, MN | $21,800–$59,400 per project |
| Laredo, TX | $16,800–$45,800 per project |
| Cedar Rapids, IA | $21,000–$57,300 per project |
| Tuscaloosa, AL | $19,000–$51,800 per project |
| Amarillo, TX | $18,100–$49,400 per project |
| Erie, PA | $19,700–$53,700 per project |
| Atlantic City, NJ | $23,200–$63,300 per project |
| Fargo, ND | $19,500–$53,100 per project |
| Charleston, WV | $19,700–$53,800 per project |
| Norfolk, VA | $21,100–$57,500 per project |
| Macon, GA | $17,900–$48,900 per project |
| Champaign, IL | $22,700–$61,800 per project |
| Burlington, VT | $20,600–$56,300 per project |
| Topeka, KS | $19,400–$52,800 per project |
| Rochester, MN | $23,100–$63,000 per project |
| Athens, GA | $19,100–$52,100 per project |
| Las Cruces, NM | $17,800–$48,600 per project |
| Columbia, MO | $19,500–$53,100 per project |
| St. George, UT | $18,800–$51,200 per project |
| Hilo, HI | $23,700–$64,500 per project |
| Billings, MT | $19,200–$52,300 per project |
| Greenville, NC | $18,500–$50,400 per project |
| Hattiesburg, MS | $17,300–$47,100 per project |
| Santa Fe, NM | $17,600–$48,000 per project |
| Missoula, MT | $18,900–$51,500 per project |
| Cheyenne, WY | $19,900–$54,200 per project |
| Fairbanks, AK | $23,700–$64,700 per project |
Each city page has local rates by area, real-world kitchen remodeling costs and a city-specific FAQ. Prices shown are the low end of the typical range, per project.
Alabama
- Birminghamfrom $19,300
- Huntsvillefrom $16,700
- Mobilefrom $17,900
- Montgomeryfrom $16,500
- Tuscaloosafrom $19,000
Arkansas
- Little Rockfrom $16,500
- Fayettevillefrom $16,900
California
- Los Angelesfrom $36,000
- San Franciscofrom $31,700
- Riversidefrom $21,400
- San Diegofrom $25,000
- Orange Countyfrom $36,000
- Oaklandfrom $29,400
- Sacramentofrom $25,200
- San Josefrom $30,900
- Fresnofrom $21,600
- Bakersfieldfrom $21,900
- Oxnardfrom $21,500
- Stocktonfrom $20,200
- Modestofrom $21,700
- Santa Rosafrom $23,700
- Visaliafrom $19,700
- Long Beachfrom $36,000
- Santa Barbarafrom $21,400
- Salinasfrom $21,700
Colorado
- Denverfrom $22,700
- Colorado Springsfrom $19,400
- Fort Collinsfrom $19,600
- Boulderfrom $20,200
Connecticut
- Hartfordfrom $22,800
- Bridgeportfrom $23,100
- New Havenfrom $22,300
- Stamfordfrom $23,100
Delaware
- Wilmingtonfrom $22,500
District of Columbia
- Washingtonfrom $24,500
Florida
- Miamifrom $24,000
- Tampafrom $21,000
- Orlandofrom $21,200
- Fort Lauderdalefrom $21,500
- Jacksonvillefrom $20,500
- West Palm Beachfrom $20,500
- St. Petersburgfrom $20,000
- Sarasotafrom $19,300
- Fort Myersfrom $19,000
- Lakelandfrom $18,900
- Daytona Beachfrom $18,700
- Palm Bayfrom $19,200
- Pensacolafrom $18,100
- Tallahasseefrom $18,500
- Gainesvillefrom $18,800
Georgia
Idaho
- Boisefrom $20,000
Indiana
- Indianapolisfrom $23,000
- Fort Waynefrom $20,100
- Evansvillefrom $19,500
- South Bendfrom $20,200
Iowa
- Des Moinesfrom $18,000
- Davenportfrom $20,900
- Cedar Rapidsfrom $21,000
Kentucky
- Louisvillefrom $21,900
- Lexingtonfrom $19,200
Louisiana
- New Orleansfrom $21,600
- Baton Rougefrom $20,700
- Lafayettefrom $18,400
- Shreveportfrom $17,700
Maine
- Portlandfrom $19,700
Maryland
- Baltimorefrom $21,600
Massachusetts
- Bostonfrom $27,800
- Worcesterfrom $22,300
- Springfieldfrom $20,400
Michigan
- Detroitfrom $22,100
- Grand Rapidsfrom $20,100
- Lansingfrom $19,500
- Flintfrom $19,000
- Ann Arborfrom $20,200
Minnesota
- Minneapolisfrom $26,300
- Duluthfrom $21,800
- Rochesterfrom $23,100
Mississippi
- Jacksonfrom $18,400
- Gulfportfrom $19,100
- Hattiesburgfrom $17,300
Missouri
- St. Louisfrom $25,100
- Kansas Cityfrom $22,800
- Springfieldfrom $19,700
- Columbiafrom $19,500
New Hampshire
- Manchesterfrom $20,500
New Jersey
- Newarkfrom $26,500
- Trentonfrom $23,900
- Jersey Cityfrom $26,500
- Atlantic Cityfrom $23,200
New Mexico
- Albuquerquefrom $20,000
- Las Crucesfrom $17,800
- Santa Fefrom $17,600
New York
North Carolina
- Charlottefrom $21,500
- Raleighfrom $21,600
- Greensborofrom $18,600
- Winston-Salemfrom $18,800
- Durhamfrom $20,100
- Fayettevillefrom $18,100
- Ashevillefrom $18,700
- Wilmingtonfrom $18,200
- Greenvillefrom $18,500
North Dakota
- Fargofrom $19,500
Ohio
- Cincinnatifrom $22,100
- Columbusfrom $22,500
- Clevelandfrom $22,100
- Daytonfrom $19,900
- Akronfrom $19,900
- Toledofrom $19,500
- Youngstownfrom $18,800
- Cantonfrom $20,100
Oklahoma
- Oklahoma Cityfrom $19,900
- Tulsafrom $20,000
Pennsylvania
- Philadelphiafrom $24,000
- Pittsburghfrom $22,600
- Harrisburgfrom $20,900
- Scrantonfrom $19,600
- Eriefrom $19,700
Rhode Island
- Providencefrom $24,000
South Carolina
- Greenvillefrom $18,900
- Columbiafrom $19,600
- Charlestonfrom $20,400
- Myrtle Beachfrom $18,100
South Dakota
- Sioux Fallsfrom $19,600
Tennessee
- Nashvillefrom $23,500
- Memphisfrom $21,200
- Knoxvillefrom $18,400
- Chattanoogafrom $19,000
Texas
- Dallasfrom $23,000
- Houstonfrom $20,000
- San Antoniofrom $19,700
- Fort Worthfrom $23,000
- Austinfrom $21,600
- McAllenfrom $16,500
- El Pasofrom $16,700
- Killeenfrom $16,600
- Corpus Christifrom $17,500
- Brownsvillefrom $16,500
- Beaumontfrom $19,200
- Arlingtonfrom $23,000
- Lubbockfrom $16,700
- Wacofrom $17,400
- Laredofrom $16,800
- Amarillofrom $18,100
Utah
- Salt Lake Cityfrom $21,800
- Provofrom $19,100
- Ogdenfrom $19,200
- St. Georgefrom $18,800
Vermont
- Burlingtonfrom $20,600
Virginia
- Virginia Beachfrom $21,100
- Richmondfrom $21,400
- Roanokefrom $17,400
- Norfolkfrom $21,100
West Virginia
- Charlestonfrom $19,700
Wyoming
- Cheyennefrom $19,900
Kitchen remodel prices, 2026
| Job | Low | Typical | High |
|---|---|---|---|
| Mid-range full kitchen remodel, 10×12 ft (150–200 sq ft), same layoutper project | $22,000 | $37,000 | $60,000 |
| Cosmetic refresh (paint or reface cabinets, new hardware, faucet, lighting, wall paint)per project | $8,000 | $15,000 | $25,000 |
| Budget remodel (stock or ready-to-assemble cabinets, laminate counters, basic appliances)per project | $12,000 | $20,000 | $30,000 |
| Small kitchen remodel, galley or U-shape under about 100 sq ft, mid-rangeper project | $12,000 | $21,000 | $34,000 |
| Upscale or major remodel (semi-custom to custom cabinets, quartz, new layout, about 200 sq ft)per project | $60,000 | $85,000 | $130,000 |
| Luxury remodel (custom cabinetry, pro-grade appliances, stone slabs, structural changes)per project | $120,000 | $165,000 | $250,000 |
| Cabinets — stock or ready-to-assemble, installed (20 linear ft)per kitchen | $2,000 | $4,000 | $6,000 |
| Cabinets — semi-custom, installed (20 linear ft)per kitchen | $3,000 | $8,000 | $13,000 |
| Cabinets — custom, installed (20 linear ft)per kitchen | $10,000 | $16,000 | $24,000 |
| Cabinet painting or refacing (doors and fronts; boxes stay)per kitchen | $2,000 | $5,500 | $13,000 |
| Countertop — laminate, installedper sq ft | $20 | $35 | $60 |
| Countertop — quartz, installedper sq ft | $50 | $85 | $150 |
| Countertop — granite, installedper sq ft | $45 | $80 | $150 |
| Countertop — marble, installedper sq ft | $50 | $100 | $200 |
| Countertop — porcelain or sintered-stone slab, installedper sq ft | $50 | $80 | $120 |
| Countertop — butcher block (wood), installedper sq ft | $40 | $65 | $110 |
| Countertop — stainless steel, installedper sq ft | $80 | $135 | $200 |
| Backsplash — tile, installed (about 30 sq ft)per kitchen | $500 | $1,100 | $1,700 |
| Backsplash — full-height slab (quartz, stone or glass), installed (about 30 sq ft)per kitchen | $1,200 | $2,500 | $5,000 |
| Appliance package (range, hood, dishwasher, refrigerator, microwave), installedper package | $3,000 | $7,500 | $15,000 |
| Electrical (two 20-amp small-appliance circuits, GFCI outlets, recessed and under-cabinet lights)per kitchen | $1,500 | $3,500 | $7,000 |
| Plumbing (move or add sink, dishwasher and ice-maker lines; new shutoffs and drain)per kitchen | $800 | $2,500 | $6,000 |
| Flooring — luxury vinyl plank or ceramic tile, installedper sq ft | $5 | $9 | $15 |
| Demolition and disposal (cabinets, counters, flooring, dumpster)per kitchen | $500 | $1,500 | $2,500 |
Prices verified November 2026 · Cross-referenced against 76+ American pricing sources · See methodology
National average prices. Select a city above for location-specific pricing.
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local kitchen remodelers
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What kind of kitchen remodel are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the kitchen remodelers who reply.
Where should they text you?
- Max 2 kitchen remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched kitchen remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 kitchen remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Kitchen remodel levels compared: cost and when each fits
A cosmetic refresh is $8,000–$25,000, a mid-range full remodel $22,000–$60,000, an upscale remodel with a new layout $60,000–$130,000 and a luxury kitchen $120,000–$250,000. Refacing the cabinets alone is $5,000–$13,000.
| Remodel level | Cost | Best for |
|---|---|---|
| Cosmetic refresh | $8,000–$25,000 per project | A sound kitchen that looks dated: paint or reface the cabinets, new hardware, faucet, lighting and wall paint — no layout change |
| Budget remodel | $12,000–$30,000 per project | Rentals and starter homes: stock or ready-to-assemble cabinets, laminate counters, basic appliances, vinyl plank floor |
| Small kitchen remodel (under about 100 sq ft) | $12,000–$34,000 per project | Galley and U-shape kitchens in condos and older homes, mid-range finishes, same layout |
| Mid-range full remodel (10×12 ft) | $22,000–$60,000 per project | The typical job: new semi-custom cabinets, quartz or granite, tile backsplash, mid-priced appliances, new floor, updated wiring and plumbing |
| Upscale or major remodel | $60,000–$130,000 per project | New layout, island, custom or semi-custom cabinets, stone slabs and better appliances in a 200 sq ft kitchen |
| Luxury remodel | $120,000–$250,000 per project | Custom cabinetry, pro-grade appliances, slab backsplashes and structural changes; mostly in high-value homes |
| Cabinet refacing only | $5,000–$13,000 per kitchen | Solid boxes, tired doors: new doors, drawer fronts and veneer in 2–4 days |
| Countertops only (quartz, 40 sq ft) | $2,000–$6,000 per kitchen | A one- or two-day update that changes the look most for the money |
Whatever the level, get three line-item bids that name the cabinet line, the counter material and square footage, the appliance models and who pulls the permits.
Common kitchen jobs and what they cost (2026)
Many kitchens are done one job at a time. New quartz counters are $2,000–$6,000, a tile backsplash $500–$1,700, painted cabinets $2,000–$6,500 and a custom island $3,000–$10,000. Time on site is in brackets.
| Block or rate | Low | Typical | High |
|---|---|---|---|
| Swap the sink and faucet (2–4 hrs) | $600 | $1,200 | $2,000 |
| Install a garbage disposal (1–2 hrs) | $185 | $280 | $380 |
| Tile backsplash, about 30 sq ft (1–2 days) | $500 | $1,100 | $1,700 |
| Remove a non-load-bearing wall (1–2 days) | $500 | $1,000 | $2,000 |
| New flooring, 150 sq ft of vinyl plank or tile (1–2 days) | $750 | $1,350 | $2,250 |
| Demolition and disposal of the old kitchen (1–2 days) | $500 | $1,500 | $2,500 |
| Prefab stationary island, set in place (half a day) | $800 | $1,500 | $2,500 |
| Replace the countertops with quartz, 40 sq ft (1–2 days plus templating) | $2,000 | $3,400 | $6,000 |
| Paint the cabinets (3–5 days) | $2,000 | $4,000 | $6,500 |
| Rewire the kitchen to code: circuits, GFCI, lighting (2–4 days) | $1,500 | $3,500 | $7,000 |
| Remove a load-bearing wall and set a beam (3–5 days) | $1,200 | $4,000 | $10,000 |
| Custom island with cabinets and counters (2–4 days) | $3,000 | $4,500 | $10,000 |
| Appliance package, delivered and hooked up (1 day) | $3,000 | $7,500 | $15,000 |
| Reface the cabinets: new doors, fronts, veneer (2–4 days) | $5,000 | $9,000 | $13,000 |
Counters, backsplash and paint can be done in any order; cabinets come before counters, and rough electrical and plumbing before either. Permits are usually needed once wiring, plumbing or walls change.
Quartz vs granite vs butcher block countertops
Quartz runs $50–$150 per sq ft installed, granite $45–$150 and butcher block $40–$110 — $2,000–$6,000, $1,800–$6,000 and $1,600–$4,400 for a 40 sq ft kitchen. Quartz was the pick of 39% of renovating homeowners in 2025, granite 19%, butcher block 9%.
| Factor | Quartz | Granite | Butcher block |
|---|---|---|---|
| Installed cost per sq ft | $50–$150 | $45–$150 | $40–$110 |
| 40 sq ft kitchen, installed | $2,000–$6,000 | $1,800–$6,000 | $1,600–$4,400 |
| Heat and scratches | Scratch-resistant; resin can scorch under a hot pan | Takes heat; very hard to scratch | Burns and scratches; sands out |
| Stains and care | Non-porous, no sealing; wipe clean | Seal every 1–2 years; wipe spills | Oil several times a year; stains near the sink |
| Looks and lifespan | Uniform; decades; fades in direct sun | Every slab unique; 100 years or more | Warm; lasts as long as you maintain it |
| Best for | Busy family kitchens and resale | Heavy cooks who like natural stone | Islands, baking stations and budgets |
Marble ($50–$200/sq ft) and porcelain slab ($50–$120/sq ft) sit alongside these; laminate ($20–$60/sq ft) is the budget pick. See the countertop deep dive for all seven materials.
Fees and soft costs on a kitchen remodel
Beyond cabinets and counters, a kitchen carries $500–$2,500 in permits, a contractor's fee of 10–20% and a 10–20% contingency — on a $37,000 job, about $3,700–$7,400 and $3,700–$7,400.
| Fee or soft cost | Low | Typical | High |
|---|---|---|---|
| Building, electrical and plumbing permits with plan check | $500 | $1,000 | $2,500 |
| Kitchen designer (independent, mid-range project) | $800 | $2,000 | $5,000 |
| General contractor fee (10–20% of a $37,000 job) | $3,700 | $5,550 | $7,400 |
| Contingency for surprises (10–20% of a $37,000 job) | $3,700 | $5,550 | $7,400 |
| Demolition, dumpster and disposal | $500 | $1,500 | $2,500 |
| Structural report for a wall removal | $500 | $950 | $1,400 |
| Asbestos or lead testing and abatement, where found | $1,500 | $2,200 | $3,000 |
| Storage for appliances and furniture, per month | $90 | $180 | $280 |
| Extra food costs while the kitchen is out | $300 | $550 | $800 |
Design-build firms fold the designer and contractor fees into one price; separate bids show them as lines. Either way, ask what the fee covers and how change orders are priced.
What affects kitchen remodel costs
Cabinets
25–40% of the budget: $2,000–$6,000 stock, $3,000–$13,000 semi-custom, $10,000–$24,000 custom for 20 linear feet installed. Imported boxes carry a 25% tariff since October 2025.
Layout
Keeping the sink, range and fridge in place keeps plumbing near $800; moving them costs $800–$6,000, a load-bearing wall $1,200–$10,000 plus a structural report, an island $3,000–$10,000.
Counters, backsplash and floor
Laminate $800–$2,400 to marble $2,000–$8,000 for 40 sq ft; tile backsplash $500–$1,700 or slab $1,200–$5,000; flooring $5–$15 per sq ft.
Appliances
$3,000–$15,000 for a package of range, hood, dishwasher, refrigerator and microwave; pro-grade brands start around $25,000. Steel-based appliances have carried a 50% duty on steel content since June 2025.
Your city
Construction-supervisor pay runs from about 25% below the US median in South Texas to 50–60% above it in Seattle, San Francisco and San Jose. Typical mid-range prices on our city pages run from $27,800 in McAllen to $56,000 in Los Angeles.
The age of the house
Pre-1960 homes bring plaster, old wiring and galvanized or cast-iron pipe; pre-1978 homes need lead-safe work practices. Budget a 10–20% contingency ($3,700–$7,400 on a typical job).
How to save on kitchen remodel
- Keep the layout.Sink, range and fridge in the same places saves $800–$6,000 in plumbing and the floor and wall patching that follows.
- Paint sound cabinets instead of replacing them.Painting is $2,000–$6,500, against $3,000–$13,000 for new semi-custom boxes. Refacing ($5,000–$13,000) saves little over new stock cabinets; choose it to keep the layout and skip the demolition.
- Go semi-custom, not custom.Semi-custom ($3,000–$13,000) fits most 10×12 kitchens; custom ($10,000–$24,000) pays for odd angles and furniture details.
- Shop stone tiers and remnants.Quartz runs $50–$150 per sq ft installed and a 40 sq ft kitchen often fits a remnant. Keep the eased edge; skip waterfall ends.
- Buy appliances on sale yourself.A $3,000–$15,000 package bought on a holiday weekend and delivered by the retailer skips the markup — confirm the cabinet openings first.
- Get three line-item bids.Same kitchen, quotes $38,000 apart is normal. Compare cabinet line, counter square footage, permits and change-order rules, not the bottom line.
Get two real quotes
Local kitchen remodelers · free · max 2 will contact you · no spam.
Kitchen remodel cost in the USA by size
A small kitchen under about 100 sq ft runs $12,000–$34,000 mid-range, a 10×12 kitchen $22,000–$60,000, and a 200 sq ft kitchen with a new layout $60,000–$130,000. Per square foot, mid-range work is $75–$250.
By the square-foot rule, mid-range work at $75–$250 per sq ft puts 100 sq ft at $7,500–$25,000, 150 sq ft at $11,300–$37,500 and 200 sq ft at $15,000–$50,000. Small kitchens cost more per foot because appliances, plumbing and permits don't shrink with the room. Houzz's 2025 survey put the median major remodel at $35,000 for kitchens under 200 sq ft and $55,000 for larger ones.
Worked example, 10×12 kitchen, same layout: semi-custom cabinets $8,000, quartz counters $3,400, tile backsplash $1,100, appliance package $7,500, flooring $1,350, electrical $3,500, plumbing $2,500, demolition $1,500 and permits $1,000 come to about $29,850 before drywall, paint, installation labor and the contractor's fee — which is how the typical bill reaches $37,000.
What a kitchen remodel quote should include
A real kitchen remodel quote answers all of these. If it answers fewer than seven, ask before you pay a deposit.
- The contractor's licence or registration number, and proof of liability and workers' comp insurance
- Cabinet brand, line, door style, finish and the linear feet or box count
- Counter material, brand and color, square footage, edge profile and cutouts
- Appliance models, who buys them and who hooks them up
- Electrical and plumbing scope — new circuits, outlets, lights, moved lines — and who pulls the permits
- Flooring, backsplash, drywall, paint and trim, each as its own line
- Demolition, dumpster and disposal
- A payment schedule tied to finished stages, with the deposit within your state's limit
- How change orders are priced, the start and finish dates, and the warranty on the work
Permits, codes and contractor licensing: what a kitchen remodel legally needs
Most full kitchen remodels need a building permit plus electrical and plumbing permits — $500–$2,500 in most cities, $3,000–$5,000 in New York City and San Francisco — and in most states the remodeler must hold a contractor licence or registration.
| State | Who may do the work | Deposit and contract rules | Typical permit fees |
|---|---|---|---|
| California | CSLB-licensed contractor for any job of $1,000 or more (labor and materials) | Down payment capped at 10% or $1,000, whichever is less; written contract over $500; 3-day right to cancel | Los Angeles: permit plus plan check (about 90% of the permit fee) ≈ $800–$1,300 on a $30,000 remodel; San Francisco $3,000–$5,000 |
| Texas | No state general contractor licence; electrician, plumber and HVAC tech must hold state licences | No state deposit cap — tie payments to finished stages in the contract | Low: Harris County about $130 for most residential renovations plus about $100 each for plumbing and mechanical permits |
| Florida | State-certified or registered contractor (general, building or residential); licensed electrical and plumbing contractors | No state deposit cap; Florida's lien law notices should be in the contract | $500–$2,500; condo associations add approval paperwork |
| New York | No state licence; NYC requires a DCWP Home Improvement Contractor licence backed by a $20,000 bond or trust fund | NYC consumer agency advises paying no more than 25% up front | NYC: DOB filings by licensed plumber and electrician; permits and filings $3,000–$5,000 |
| Illinois | No state general contractor licence; Chicago licenses general contractors; plumbing is state-licensed | No state deposit cap | Chicago: $1,500–$2,000 minimum for a major kitchen remodel; Easy Permit a few hundred dollars for same-layout jobs |
| Washington / Oregon | Contractor registered with WA Labor & Industries (bond and insurance on file) / Oregon CCB licence | No state deposit cap; check the registration number online | $500–$2,500 |
| Maryland / Massachusetts | MHIC licence / Home Improvement Contractor registration plus Construction Supervisor Licence for permitted work | Deposit capped at one-third of the contract price (MA: except special-order materials) | $500–$2,500 |
| Idaho / Nevada / Arizona | Idaho registration from $2,000; Nevada State Contractors Board licence from $1,000; Arizona ROC licence from $1,000 or any permitted job | No state deposit cap | Boise $400–$1,500; elsewhere $500–$2,500 |
General information, not legal advice. Thresholds change; check the state board and your city building department before you sign.
When a permit is needed. Replacing cabinets, counters, flooring and appliances in the same places usually needs no building permit. New circuits, a moved sink or drain, a new range-hood duct, a removed wall or a changed window does — and the inspector will check the whole kitchen against current code while they're there. Permits and plan check run $500–$2,500 in most cities; in New York City and San Francisco, filings by a licensed plumber and electrician plus the building permit come to $3,000–$5,000.
What today's electrical code expects. The National Electrical Code requires at least two 20-amp small-appliance circuits for the countertop and refrigerator receptacles, a receptacle within 2 ft of any point along the countertop (so outlets every 4 ft or less), GFCI protection on kitchen receptacles, an individual circuit for a hardwired range hood, and either a receptacle or provision for one at an island or peninsula. Bringing a 1970s kitchen up to that is most of the $1,500–$7,000 electrical line.
Older homes. If the house was built before 1978, federal law requires the firm disturbing painted surfaces to be Lead-Safe Certified and to follow lead-safe work practices, which adds setup and cleanup time; testing and abatement of asbestos floor tile or lead paint runs $1,500–$3,000 when it's found. Knob-and-tube wiring and galvanized or cast-iron pipe are the other common surprises — budget a 10–20% contingency.
- Building permit: needed once wiring, plumbing, ducts, walls or windows change; not for cabinets, counters and appliances replaced in place
- Electrical and plumbing permits: pulled by the licensed trade doing the work, in their name
- Licence or registration number on the contract, checked on the state board's website the same day
- Insurance certificates (liability and workers' comp) sent to you directly by the insurer
- Deposit within your state's cap — California 10% or $1,000, Maryland and Massachusetts one-third — and payments tied to finished stages
- Pre-1978 house: a Lead-Safe Certified firm and lead-safe work practices for any paint disturbed
Ask who pulls each permit, and get the permit numbers before the first check clears. A contractor who suggests skipping the permit is shifting the risk to you: unpermitted electrical and plumbing can void insurance claims and stall a home sale.
Tariffs and 2025–2026 price moves: cabinets, appliances, stone and lumber
Imported kitchen cabinets and vanities have carried a 25% tariff since October 14, 2025, steel-based appliances a 50% duty on their steel content since June 23, 2025, and softwood lumber 10% — the main reason kitchen and bath remodel spending is running about 3.5% higher in 2026 on price alone.
| Material | What changed | Effect on a mid-range kitchen | What to do |
|---|---|---|---|
| Kitchen cabinets and vanities | 25% Section 232 tariff on imports since Oct 14, 2025; the step to 50% (set for Jan 1, 2026) was delayed on Dec 31, 2025 to Jan 1, 2027 | Cabinets are 25–40% of the budget; imported stock and RTA lines are most exposed, US-made semi-custom and custom least | Ask where the boxes are made; get quotes good for 30 days; order before any further step-up |
| Appliances | 50% duty on the steel content of imported refrigerators, dishwashers, ranges, ovens, disposals and dryers since Jun 23, 2025 | Packages still run $3,000–$15,000, but entry-level imported models moved most | Buy on holiday sale weekends; consider US-assembled lines; price the package yourself |
| Softwood lumber | 10% Section 232 duty since Oct 14, 2025 (on top of existing Canadian duties) | Small for a same-layout kitchen; matters for wall removals, new headers and subfloor repairs | Ask for the framing line separately on layout changes |
| Quartz and stone | Quartz prices steady at $50–$150 per sq ft installed; imports have carried anti-dumping duties for years, so no new 2025 shock | $2,000–$6,000 for 40 sq ft of quartz, $1,800–$6,000 granite | Shop brand tiers and remnants; keep the eased edge |
| Labor | Construction supervisor pay up 1.6% in a year (BLS, May 2025); remodeler backlogs eased in 2026 | Labor is 20–35% of the bill; a $37,000 job carries roughly $7,400–$13,000 of it | Book for late fall or winter, when crews are less booked and some remodelers discount |
Tariff rates as published in the September 29 and December 31, 2025 proclamations and the June 2025 Commerce notice; they can change again.
How much tariffs move the whole bill. Less than the headline rates suggest. Cabinets are a quarter to a third of a kitchen and perhaps half of them are imported, so a 25% duty on the import price adds a few percent to the project, not 25%. The appliance duty applies to the steel content, not the sticker. The National Kitchen & Bath Association's mid-2026 outlook expects repair-and-remodel kitchen and bath spending to rise about 3.5% in 2026, mostly from higher prices, while Harvard's remodeling index sees homeowner improvement spending growth easing from 2.9% to about 1.6% by the end of 2026.
What this means for a quote. A 2024 quote is stale. Ask for material prices to be locked when you sign or when the cabinets are ordered, and for any tariff pass-through to be itemized rather than hidden in a lump sum. If the step-up to 50% on cabinets goes ahead on January 1, 2027, orders placed in late 2026 are the ones to protect.
- Cabinets: 25% on imports since Oct 14, 2025; 50% step delayed to Jan 1, 2027
- Appliances: 50% on the steel content of imported refrigerators, dishwashers, ranges and disposals since Jun 23, 2025
- Lumber: 10% on softwood timber and lumber since Oct 14, 2025
- Kitchen and bath remodel spending: about +3.5% in 2026, mostly price (NKBA mid-year outlook)
What the cheap kitchen quote leaves out
The gap between a $22,000 quote and a $37,000 one is usually not the cabinets — it's what's missing: permits ($500–$2,500), demolition and disposal ($500–$2,500), electrical to code ($1,500–$7,000), plumbing ($800–$6,000) and the appliances ($3,000–$15,000) — about $6,300–$33,000 together.
| Often missing | Typical cost | How to spot it | Ask for |
|---|---|---|---|
| Permits, plan check and inspections | $500–$2,500 | "Owner to obtain permits" or no permit line at all | The permit line and who pulls each trade permit |
| Demolition, dumpster and disposal | $500–$2,500 | "Demo by owner" or no dumpster line | Demolition and haul-away as one line, with the dumpster |
| Electrical to current code | $1,500–$7,000 | "Reconnect existing" with no new circuits or GFCI | Two 20-amp circuits, GFCI outlets, lighting and hood circuit itemized |
| Plumbing beyond reconnecting | $800–$6,000 | No shutoffs, drain or dishwasher line mentioned | New shutoffs, supply lines and drain work spelled out |
| Appliances and hookup | $3,000–$15,000 | "Appliances by owner" with no install line | Models named, who buys them, who installs and vents the hood |
| Drywall, paint and trim after demo | $500–$2,500 | No patching or paint line | Drywall repair, primer and two coats, baseboard and casing |
| Counter cutouts, edges and templating | $100–$500 per cutout; $10–$40 per linear ft of edge | A per-square-foot stone price with nothing else | Sink and cooktop cutouts, faucet holes, edge profile, removal of the old top |
| Cabinet hardware, fillers, crown and toe kicks | $200–$1,500 | Cabinet line with no hardware or trim | Pulls, fillers, panels, crown molding and toe kicks listed |
| Contingency and change-order rules | 10–20% ($3,700–$7,400) | No allowance for what's behind the walls | A written change-order rate and a contingency you hold, not the contractor |
| Living without a kitchen | Storage $90–$280/month; extra food $300–$800 | Not in any quote | A realistic schedule: 6–12 weeks of construction |
Allowances are the other trick. A quote can carry a cabinet allowance that only covers stock boxes or a tile allowance of a few dollars a foot, so the real selection becomes a change order. Ask for the brand, line and model behind every allowance, and compare the allowance to the installed ranges on this page — semi-custom cabinets $3,000–$13,000, quartz $2,000–$6,000, a tile backsplash $500–$1,700.
Insurance and payment. Ask for the contractor's liability and workers' comp certificates sent directly from the insurer, and tell your own insurer about the project — some policies exclude damage during renovation or need a rider for materials on site. Pay by stage, never ahead of the work: California caps the deposit at 10% or $1,000, Maryland and Massachusetts at one-third, and New York City's consumer agency advises no more than 25% up front.
- Permits, demolition, electrical, plumbing and appliances together: $6,300–$33,000 — the usual gap between a bare quote and a complete one
- Every allowance named by brand, line and model, and compared to the installed ranges above
- A written change-order rate and a contingency you hold
- Payment by finished stage, within your state's deposit cap
How long it takes, when the bills come, and how people pay
A mid-range kitchen remodel takes about 6–12 weeks of construction after 4–8 weeks of design, ordering and permits, and most homeowners pay from savings — 84% in Houzz's 2025 survey, with 29% putting some of it on credit cards and 12% using a home-equity loan or line.
| Stage | Typical time | What happens | What you pay |
|---|---|---|---|
| Design, selections and bids | 2–4 weeks | Measure, layout, pick cabinets and counters, get three line-item bids; a designer runs $800–$5,000 | Design fee, if any |
| Ordering and permits | 8–16 weeks | Cabinets ordered (the long lead), appliances chosen, permits filed | Deposit within your state's cap; cabinet order often paid in full |
| Demolition and rough-in | 1–2 weeks | Tear-out and dumpster ($500–$2,500), new wiring ($1,500–$7,000) and plumbing ($800–$6,000), inspections | Stage payment after rough inspection |
| Cabinets, counters, floor | 2–4 weeks | Drywall and paint, cabinets set, counters templated then installed about 1–2 weeks later, flooring | Stage payment after cabinets; another after counters |
| Finish and final inspection | 1–2 weeks | Backsplash, appliances hooked up, hardware, trim, punch list, final inspection | Final payment only after the punch list and final inspection |
| Cosmetic refresh (whole job) | 2–4 weeks | Paint or reface ($2,000–$13,000), counters, faucet, lighting | Two or three payments |
| Gut remodel with layout changes (whole job) | 14–20 weeks | Walls, beams, moved plumbing, full rewire, then everything above | Four to six stage payments |
Timelines from design-build and cost-guide data for 2026; cabinet lead times are the usual bottleneck.
Financing. Bankrate's national average HELOC rate was 7.49% on November 4, 2026. On a $37,000 remodel, a home-equity line at that rate costs roughly $2,750 a year in interest if you carry the full balance; a cosmetic refresh at $8,000–$25,000 is small enough that many homeowners use savings or a 0% appliance promotion for the package. There is no federal tax credit for a kitchen remodel; the 25C energy-efficiency credit that covered some heat pumps and panels ended for property placed in service after December 31, 2025.
Living through it. Budget $90–$280 a month if you store appliances or furniture, $300–$800 in extra food over the job, and set up a temporary kitchen with the old fridge, a microwave and a utility sink. Winter and late fall are the easiest times to book: crews are less booked, cabinet lead times are shorter, and some remodelers discount to fill the calendar.
- Design, ordering and permits: 4–8 weeks; construction 6–12 weeks
- Cabinets are the long lead: 8–16 weeks — order before demolition
- Average HELOC rate 7.49% (Bankrate, Nov 4, 2026); 84% of renovators pay from savings, 12% with a home-equity loan or line
- Living without a kitchen: storage $90–$280 a month, extra food $300–$800 over the job
Kitchen remodel cost: FAQ
How much does a kitchen remodel cost?
$22,000–$60,000 for a mid-range remodel of a 10×12 kitchen in 2026, with $37,000 typical. A cosmetic refresh is $8,000–$25,000, a budget remodel $12,000–$30,000, an upscale remodel $60,000–$130,000 and a luxury kitchen $120,000–$250,000.
What is the most expensive part of a kitchen remodel?
Cabinets, at 25–40% of the budget: $2,000–$6,000 stock, $3,000–$13,000 semi-custom, $10,000–$24,000 custom for 20 linear feet installed. Labor is the next 20–35%.
How much does a kitchen remodel cost per square foot?
About $75–$250 per sq ft for mid-range work, $250–$600 for high-end. Use it as a sanity check — cabinets, counters and appliances set the price, not floor area.
How much is a small kitchen remodel?
$12,000–$34,000 for a galley or U-shape kitchen under about 100 sq ft with mid-range finishes. Small kitchens cost more per square foot because appliances and plumbing cost the same.
How much do quartz countertops cost?
$50–$150 per sq ft installed, or $2,000–$6,000 for a 40 sq ft kitchen. Granite is $45–$150, laminate $20–$60, butcher block $40–$110.
Do I need a permit to remodel a kitchen?
Usually, once wiring, plumbing or walls change; swapping cabinets, counters and appliances in place often needs none. Permits and plan check run $500–$2,500 in most cities and $3,000–$5,000 in New York City and San Francisco.
Does a kitchen remodel add value?
The 2025 Cost vs Value report found a minor kitchen remodel ($28,458) returned 113% at resale, a major mid-range remodel ($82,793) 51% and an upscale one ($164,104) 36%.
How long does a kitchen remodel take?
About 6–12 weeks of construction after 4–8 weeks of design, ordering and permits; cabinets alone take 8–16 weeks to arrive. A cosmetic refresh is 2–4 weeks, a gut remodel 14–20.
How much should I pay a contractor up front?
As little as your state allows and never ahead of the work. California caps the deposit at 10% or $1,000, whichever is less; Maryland and Massachusetts at one-third; New York City's consumer agency advises no more than 25%. Elsewhere, 10–20% at signing with stage payments is normal.
Are kitchen remodel prices going up in 2026?
Yes, by about 3.5%. The National Kitchen & Bath Association's mid-2026 outlook expects repair-and-remodel kitchen and bath spending up 3.5% this year, mostly on price; construction-supervisor pay rose 1.6% in a year, imported cabinets carry a 25% tariff since October 2025, and steel-based appliances a 50% duty on steel content since June 2025.
Done your research?
Pick your city for local prices, or get two real kitchen remodel quotes now. Free, no spam.