General contractors charge 10% to 20% of the project cost as their fee in 2026, so $5,000–$10,000 on a $50,000 remodel with $7,500 (15%) typical, $15,000–$30,000 on a $150,000 addition and $40,000–$80,000 to build a $400,000 house. Materials carry a further 7.5–20% markup, and hourly work bills $50–$150.
Fee: 10–20% of the project; $5,000–$10,000 on $50,000, $7,500 typical
Materials markup 7.5–20%; hourly $50–$150; day rate $300–$500
Construction manager instead of a GC: 5–15% ($2,500–$7,500 on $50,000)
Change order on a $5,000 item: $5,500–$7,000 with markup and admin fee
Deposit: 10–20%; California caps it at 10% or $1,000
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
01 / PricesUSA · November 2026
General contractor fees by project size (2026)
The fee is a percentage, so it grows with the job. $5,000–$10,000 on a $50,000 remodel is the benchmark.
Job
Low
Typical
High
GC fee on a $20,000 bathroom remodelper $20k project
$2,000
$3,000
$4,000
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project
$5,000
$7,500
$10,000
General contractor fee on a $150,000 addition or major remodelper $150k project
$15,000
$22,500
$30,000
General contractor fee to build a $400,000 houseper $400k build
$40,000
$60,000
$80,000
Project management only (construction manager) on a $50,000 jobper $50k project
$2,500
$5,000
$7,500
General contractor hourly rate (consulting, small jobs)/hr
$50
$75
$150
General contractor day rate (working on your site)per day
$300
$400
$500
Change order: a $5,000 mid-project change (markup plus admin fee)per change
$5,500
$6,000
$7,000
Pre-construction consultation or detailed estimate (big jobs)per project
$150
$500
$1,000
Building permit and plans for a remodel or additionper project
$1,700
$4,500
$9,500
US prices, November 2026. Low is a simple job in a low-cost area; high is a bigger job or a high-cost city.
02 / By city195 cities priced
Does gc fees and markup change by city?
Yes. The same job costs more where labor and rent cost more. Here's how general contractor prices in the biggest US metros compare with the US typical of $7500.
General contractor prices in the 12 biggest US metrosEach city's typical general contractor price against the US typical of $7,500.
The 10–20% covers the GC's overhead and profit: bidding the job, hiring and scheduling the subs, buying materials, pulling permits, meeting inspectors, carrying liability and workers' comp insurance, and standing behind the work. On a $50,000 remodel that is $5,000–$10,000; the other $42,500 or so pays the subs, the lumber yard and the permit office. The National Association of Home Builders' 2024 survey put builder profit at 11% of a new home's sales price, which is the same number from the other side of the table.
Small jobs carry a higher percentage because the fixed work (a site visit, a permit, a schedule) is the same whether the job is $20,000 or $200,000. Several national guides put large or complex projects near 25%, and the builder-platform figures run from 10% to 30%.
02
Compare
Cost-plus vs fixed price
Cost-plus: you pay the actual cost of labor and materials plus the fee, stated as a percentage or a fixed dollar amount. You see every invoice. The risk is that the total floats, so insist on a not-to-exceed cap and a line for the fee itself. Fixed price (lump sum): one number for the whole scope. The fee is inside it along with a cushion for risk, which is why a fixed bid on the same drawings usually comes in above a cost-plus estimate. It only works when the drawings and finishes are locked; otherwise change orders eat the certainty you paid for.
Time and materials bills $50–$150 an hour plus costs and suits repairs and small jobs. Fixed price with escalation lets the price rise if material costs move during the contract, a clause more GCs added after the 2025 tariffs on lumber, steel, aluminum and copper.
03
Markup on materials and subs
On top of the fee, most GCs mark up materials 7.5% to 10%, some up to 20%, and many mark up sub invoices too. That is how a cost-plus job with a 10% fee can land where a 15% fee would. Ask whether the fee percentage applies to the marked-up cost or the raw cost, and whether sub invoices are passed through at cost.
04
Change orders
A change order is a signed addition to the contract for work outside the original scope. The cost is the new work plus the GC's markup (10–30%) and often an admin fee of $100–$500, so a $5,000 change lands at $5,500–$7,000. Additions typically overrun their quote by 5% to 20%, almost all of it change orders for finishes chosen late or conditions found behind walls. Carry a 10–20% contingency and get the change-order pricing rule into the contract before you sign.
05
Compare
Construction manager or owner-builder instead of a GC
A construction manager schedules and inspects subs you hire yourself for 5–15% of the project, $2,500–$7,500 on a $50,000 job, about half a GC's fee. You save roughly $2,500 at typical prices and take on the contracts, the liens, the no-shows and the warranty. Acting as your own GC saves the whole fee and is legal for your own home in most states, but lenders often will not finance an owner-built project and permits in some cities require a licensed contractor of record.
06
Deposits and payment schedules
A deposit of 10–20% is normal; 50% is a warning sign. California caps the deposit on a home improvement contract at 10% of the price or $1,000, whichever is less, and several other states and cities set limits. After the deposit, tie payments to milestones (demo, rough-in, drywall, finish), hold 10% until the final inspection passes, and collect lien releases from subs at each payment.
04 / Check a quoteFree · no sign-up
Got a price? See if it's fair
General contractor fee on a $50,000 remodel (10–20% of the project)
Type the price you were quoted. We compare it with the US range of $5,000–$10,000 per $50k project.
Get free quotes from up to 2 local general contractors
Free · No obligation · About a minute
1The job
2Budget
3Your details
C
Casey · LocalGoingRate
What are you planning to build or remodel?
Tap one to start.
C
Casey · LocalGoingRate
What's your rough budget?
A ballpark is fine. It helps the general contractors who reply.
C
Casey · LocalGoingRate
Where should they text you?
Max 2 general contractors. No call floods.
100% free. No obligation.
🔒 Only your matched general contractors see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 general contractors about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
C
Casey · LocalGoingRate
Check your phone
05 / Questions5 answers
GC fees and markup: FAQ
What percentage do general contractors charge?
10% to 20% of the project cost, 15% typical, so $5,000–$10,000 on a $50,000 remodel. Large or complex jobs run toward 25%; the builder-platform range is 10–30%.
Is a 20% contractor fee too high?
Not on a small or complex job: 20% is the top of the normal range and small remodels often land there. On a $150,000 addition, 20% ($30,000) is the high end and 15% ($22,500) is typical.
What is the difference between a GC fee and markup?
The fee is the GC's overhead and profit on the whole job (10–20%). Markup is added to individual costs, usually 7.5–10% on materials and sometimes on sub invoices. A bid can carry both, so ask how each is applied.
How much do general contractors charge per hour?
$50–$150 an hour for consulting and small jobs, or $300–$500 a day for a GC working on site. Project work is quoted as a percentage or a fixed price instead.
How much should a contractor deposit be?
10–20% of the contract, then milestone payments. California limits it to 10% or $1,000, whichever is less. Never pay half up front.
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read the full methodology →