How much does a general contractor cost in Miami?
By Our research team · Last verified · Methodology
Most general contractors in Miami charge $5,100–$10,100 to run a $50,000 remodel that is a fee of about 10.2% to 20.2% on top of labor and materials, with $7,650 (15.3%) the typical bill. A 400 sq ft addition runs $51,500–$101,500 all in; a mid-range kitchen $25,500–$66,000.
How we get this data- Typical
- $7,650
- Low end
- $4,050
- High end
- $12,700
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.
Get my fair quote →The typical Miami price is $7,650, in line with the US typical of $7,500.
Miami's price band
Miami is pricier than 79% of the 195 US metros we price for general contractor work.
A general contractor in Miami charges $5,100–$10,100 to run a $50,000 remodel, which is a fee of 10.2% to 20.2% on top of the labor and materials, and $7,650 (15.3%) is typical. On a $150,000 addition the fee is $15,300–$30,500. A 400 sq ft room addition costs $51,500–$101,500 all in, and a mid-range kitchen $25,500–$66,000.
As a big, high-cost metro for construction labor, Miami prices a GC's fee in line with the US typical of $7,500 on a $50,000 job. Local pay drives it: construction supervisors in the Miami-Fort Lauderdale-West Palm Beach metro earn a median $77,530 a year (about 3% below the US median), and the same wage pressure runs through every sub on the project.
Florida licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates. This is general information, not legal advice.
Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.
$5,100–$10,100 — typically $7,650 — is what a general contractor charges to run a $50,000 remodel in Miami, a 10.2–20.2% fee on top of labor and materials. A 400 sq ft addition runs $51,500–$101,500 all in, a mid-range kitchen $25,500–$66,000, and new construction $135–$255 a square foot. Verified November 2026. Get free Miami quotes →
- GC fee on a $50,000 remodel: $5,100–$10,100 ($7,650 typical, 15.3%)
- Hourly $50–$155; day rate $310–$510; construction manager $2,550–$7,600
- Room addition, 400 sq ft: $51,500–$101,500; second story $123,000–$304,500
- Kitchen $25,500–$66,000; bath $8,700–$24,500; basement finish $22,500–$51,000
- New construction $135–$255 per sq ft; whole-house renovation $51,500–$203,000
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Miami metro, re-verified November 2026. Permits, engineering and change orders are their own rows.
| Service | Low | Typical | High |
|---|---|---|---|
| General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project | $5,100per $50k project | $7,650 | $10,100 |
| General contractor fee on a $150,000 addition or major remodelper $150k project | $15,300per $150k project | $23,000 | $30,500 |
| General contractor fee to build a $400,000 houseper $400k build | $41,000per $400k build | $61,000 | $81,000 |
| General contractor hourly rate (consulting, small jobs)/hr | $50/hr | $80 | $155 |
| General contractor day rate (working on your site)per day | $310per day | $415 | $510 |
| Project management only (construction manager) on a $50,000 jobper $50k project | $2,550per $50k project | $5,100 | $7,600 |
| Change order: a $5,000 mid-project change (markup plus admin fee)per change | $5,600per change | $6,100 | $7,050 |
| Building permit and plans for a remodel or additionper project | $1,750per project | $4,650 | $9,700 |
| Structural inspection and written reportper job | $310per job | $565 | $1,000 |
| Minor structural repair (header or lintel, crack stitching, wall ties)per job | $1,250per job | $2,550 | $5,100 |
| Remove a load-bearing wall and install a beam (single story)per job | $3,100per job | $7,200 | $15,250 |
| Deck build, about 200 sq ft, run by a general contractorper project | $4,600per project | $8,200 | $15,250 |
| Covered patio or porch addition, about 200 sq ftper project | $8,200per project | $16,400 | $30,500 |
| Detached two-car garage, built from the slab upper project | $20,500per project | $31,000 | $51,000 |
| Basement finish, about 1,000 sq ftper project | $22,500per project | $36,000 | $51,000 |
| Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project | $8,700per project | $14,850 | $24,500 |
| Kitchen remodel, mid-range, run by a general contractorper project | $25,500per project | $41,000 | $66,000 |
| Home addition, building out, per sq ftper sq ft | $105per sq ft | $180 | $255 |
| Room addition, 20 × 20 ft (400 sq ft), finishedper project | $51,500per project | $77,000 | $101,500 |
| Full second-story additionper project | $123,000per project | $179,500 | $304,500 |
| Detached ADU, 600 sq ft one-bedroom, turnkeyper unit | $123,000per unit | $184,500 | $304,500 |
| Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project | $51,500per project | $118,000 | $203,000 |
| New home construction, per sq ft (standard finish, no land)per sq ft | $135per sq ft | $170 | $255 |
| Tear down and rebuild a 2,000 sq ft houseper project | $256,500per project | $359,000 | $558,500 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local general contractors in Miami
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning to build or remodel?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the general contractors who reply.
Where should they text you?
- Max 2 general contractors. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched general contractors see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 general contractors about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Prices cover the Miami metro. Outlying towns can run a little lower; tight lots and older houses in Wynwood & Downtown and Doral & Hialeah sit at the top of each range.
General contractor prices across Miami
Where you live changes the GC's overhead, not the price of lumber. Tight lots and older houses in Wynwood & Downtown take the longest; fees in Fort Lauderdale & Broward price near the city typical, with bigger projects.
Wynwood & Downtown
- Fee on a $50k job
- $5,500–$11,600 per $50k project
- 400 sq ft addition
- $55,500–$116,500 / 400 sq ft addition
Older buildings, tight lots and paid parking. Permits take longer, dumpsters need street permits, and condo or co-op boards add insurance and work-hour rules, so GC fees here run at the top of the city range.
Doral & Hialeah
- Fee on a $50k job
- $5,250–$10,900 per $50k project
- 400 sq ft addition
- $53,000–$109,500 / 400 sq ft addition
Older homes being updated one project at a time. Expect fees a little above the city average, and ask how the GC handles permits for older wiring and plumbing that inspectors will want brought up to code.
North Miami & Miami Gardens
- Fee on a $50k job
- $5,100–$10,100 per $50k project
- 400 sq ft addition
- $51,500–$101,500 / 400 sq ft addition
Established streets with a mix of house ages. Most projects price at the city average; older homes may need extra structural or electrical work once walls are open.
Fort Lauderdale & Broward
- Fee on a $50k job
- $5,100–$10,500 per $50k project
- 400 sq ft addition
- $51,500–$105,500 / 400 sq ft addition
Plenty of 1980s-and-later houses with simple framing, which keeps structural surprises rare. Expect average fees plus more square feet per project.
Real-World General Contractor Costs in Miami
Here's what common general contractor jobs cost in Miami in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.
GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks
The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Miami homeowners pay about $7,650 (15.3%) for that; a structural change or a co-op board pushes the fee toward $10,100.
Remove a load-bearing wall for an open kitchen — 3 to 5 days
A structural engineer sizes the beam ($310–$1,000 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $3,100–$15,250 in Miami for a single-story wall; a two-story wall or a hidden flush beam costs more.
400 sq ft room addition, finished — 3 to 5 months
Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $51,500–$101,500 all in, of which the GC's fee is about $11,550 at 15.3%. Permits and drawings ($1,750–$9,700) come first and take 4 to 12 weeks in most cities.
Detached two-car garage from the slab up — 4 to 8 weeks
Slab, framing, roof, siding, one overhead door and a basic electrical panel. $20,500–$51,000 in Miami; finishing the inside, a second story or an ADU conversion is a different project.
Whole-house renovation of a 2,000 sq ft home — 4 to 8 months
Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $51,500–$203,000 in Miami, GC fee included; a full gut to the studs runs $123,000–$307,500.
How much does a general contractor cost in Miami?
Between $5,100 and $10,100 on a $50,000 remodel, and $7,650 is the fee most Miami homeowners pay. The fee is 10.2% to 20.2% of the project and it buys the GC's time: bidding, hiring and scheduling the subs, pulling permits, meeting inspectors and carrying the insurance and the warranty.
If you only want someone to schedule the subs you hire yourself, a construction manager charges $2,550–$7,600 on a $50,000 job, roughly half a GC's fee, but the risk stays with you. GCs here bill $50–$155 an hour for small jobs. Figures re-checked against 23 sources in November 2026.
General contractor prices in Miami (2026): fees, remodels, additions and new builds
The GC's fee on a $50,000 remodel is $5,100–$10,100, a 400 sq ft addition $51,500–$101,500, and new construction $135–$255 a square foot.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| GC fee on a $50,000 remodel | $5,100 | $7,650 | $10,100 |
| GC fee on a $150,000 addition | $15,300 | $23,000 | $30,500 |
| GC hourly rate | $50 | $80 | $155 |
| Kitchen remodel, mid-range | $25,500 | $41,000 | $66,000 |
| Room addition, 400 sq ft | $51,500 | $77,000 | $101,500 |
| Full second-story addition | $123,000 | $179,500 | $304,500 |
| Whole-house renovation, 2,000 sq ft | $51,500 | $118,000 | $203,000 |
| New home construction, per sq ft | $135 | $170 | $255 |
Percentage or lump sum, the money is the same in Miami: $7,650 on a $50,000 job is a 15.3% fee. Ask for the fee as a number and as a percentage, and ask what it covers; a bid that hides the fee inside the sub prices is harder to compare.
What moves a general contractor's quote in Miami:
- Project size and complexity — the fee is 10.2–20.2% of the job, so $5,100–$10,100 on $50,000 and $15,300–$30,500 on $150,000. Structural work, tight sites and many subs push the percentage up.
- Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,650 typical on a $50,000 scope.
- Permits and drawings — $1,750–$9,700 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
- Change orders — a $5,000 mid-project change costs $5,600–$7,050 once markup and an admin fee are added. Lock the design before you sign.
- The age of the house — once walls are open, inspectors in Miami can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.
Ask every Miami general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →
General Contractor Cost in Miami by Project Size
$50,000 remodel: GC fee $5,100–$10,100. $150,000 addition: $15,300–$30,500. $400,000 new house: $41,000–$81,000. The whole project, GC included, runs $51,500–$101,500 for a 400 sq ft addition, $123,000–$304,500 for a full second story and $256,500–$558,500 to tear down and rebuild 2,000 sq ft.
Worked example: a Miami 400 sq ft room addition at $77,000 typical. The GC's 15.3% is about $11,550; permits and drawings add $4,650; a structural engineer's report $565. Carry a 10% contingency ($7,700) for what the crew finds under the siding, and the realistic budget is about $89,915.
Going up costs more than going out. A full second story is $179,500 typical against $77,000 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $105–$255 and building up $205–$515.
Miami General Contractor Costs by Contract and Job Type
| Contract or job type | Cost | Best for |
|---|---|---|
| Cost-plus GC (fee as a percentage) | $5,100–$10,100 fee on a $50,000 job | You pay the real cost of labor and materials plus the GC's fee, about 15.3% here. Fair when the scope is still moving; set a not-to-exceed cap. |
| Fixed-price (lump sum) GC bid | $5,100–$10,100 fee inside a $50,000 job | One price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans. |
| Construction manager (project management only) | $2,550–$7,600 fee on a $50,000 job | You hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you. |
| Hourly or day rate | $50–$155/hr | Small jobs, repairs and consulting, or $310–$510 a day for a GC working on site. Project work is quoted as a price instead. |
| Bathroom remodel, mid-range (GC-run) | $8,700–$24,500 per project | The most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes. |
| Kitchen remodel, mid-range (GC-run) | $25,500–$66,000 per project | Cabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top. |
| Basement finish, 1,000 sq ft | $22,500–$51,000 per project | The cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it. |
| Room addition, 400 sq ft (building out) | $51,500–$101,500 per project | New footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $105–$255 a square foot. |
| Full second-story addition (building up) | $123,000–$304,500 per project | Roof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months. |
| Whole-house renovation, 2,000 sq ft | $51,500–$203,000 per project | Kitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time. |
| Detached two-car garage | $20,500–$51,000 per project | A shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project. |
| Detached ADU, 600 sq ft turnkey | $123,000–$304,500 per project | A small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows. |
| New home, 2,000 sq ft (construction only) | $270,000–$510,000 per project | The GC is the builder, at $135–$255 a square foot. Land, design, permits and utility hookups sit on top. |
| Structural work: remove a bearing wall | $3,100–$15,250 per project | Jobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector. |
The fee vs. the project — what a Miami general contractor bill really covers
On a $50,000 remodel in Miami, the general contractor keeps about $7,650 — the 15.3% fee. The other $42,350 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.
The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,550–$7,600 and saves about $2,550 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.
What's included in a Miami general contractor quote (and what costs extra)
A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:
- Permits and drawings — $1,750–$9,700 for a remodel or addition, often billed as a pass-through
- Engineering — $310–$1,000 for a structural report on any bearing wall or addition
- Change orders — $5,600–$7,050 on a $5,000 change once markup and admin fees are added
- Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup
Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.
Project size
The fee scales with the job: $5,100–$10,100 on $50,000, $15,300–$30,500 on $150,000, $41,000–$81,000 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.
Contract type
Cost-plus states the fee (10.2–20.2% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $50–$155 an hour plus costs and suits small or open-ended jobs.
Structural work and permits
Anything that needs a structural engineer's report ($310–$1,000) and a building permit ($1,750–$9,700 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $3,100–$15,250 in Miami.
Change orders
A $5,000 change mid-project costs $5,600–$7,050 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.
Local rules and licensing
Florida licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.
Labor rates in Miami
Construction supervisors in the Miami-Fort Lauderdale-West Palm Beach metro earn a median $77,530 a year in federal wage data, about 3% below the US median. Labor is 40% to 60% of a remodel or addition, so Miami projects land in line with the US typical.
Season and schedule
Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Miami GCs sharpen their fee to keep crews working.
- Lock the design and finishes before you sign.Every change after the contract costs $5,600–$7,050 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
- Get three itemized bids on the same drawings.Two Miami bids can differ by $2,550 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
- Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($51,500–$203,000) costs less per room than the rooms done one at a time.
- Keep the footprint and the roofline.Building out costs $105–$255 a square foot; building up costs about twice that ($123,000–$304,500 for a full second story). A bump-out or a basement finish ($22,500–$51,000) is cheaper than either.
- Ask about an off-season start.Interior work in winter is slower for most Miami GCs, and a start date in January or February can bring the fee down a point or two.
- Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
Miami general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:
- The GC's fee as a percentage and a dollar figure, and what it covers
- Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
- Exclusions: permits, engineering, dumpster, utility connections, landscaping
- How change orders are priced: markup percentage and any admin fee
- Who pulls the permit and who meets the inspector
- A payment schedule tied to milestones, with the deposit capped
- The license or registration number where your state has one, plus liability and workers' comp certificates
- Start and finish dates, the warranty on the work, and lien releases from subs at each payment
How much does a general contractor cost in Miami?
$5,100–$10,100 (typically $7,650 here) to run a $50,000 remodel — a fee of 10.2% to 20.2% on top of labor and materials. On a $150,000 addition the fee is $15,300–$30,500.
What percentage do general contractors charge in Miami?
About 10.2% to 20.2% of the project cost, 15.3% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.
How much do general contractors charge per hour in Miami?
$50–$155 an hour for consulting and small jobs, or $310–$510 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.
How much does a home addition cost in Miami?
$51,500–$101,500 for a finished 400 sq ft room addition, about $105–$255 a square foot building out. A full second story runs $123,000–$304,500.
How much does it cost to build a house in Miami?
About $135–$255 a square foot for construction at a standard finish, so $270,000–$510,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $256,500–$558,500.
How much does a whole-house renovation cost in Miami?
$51,500–$203,000 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.
Do I need a licensed general contractor in Florida?
Florida licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.
Is cost-plus or a fixed price better?
Cost-plus shows the fee (10.2–20.2% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,650.
How much should I pay a general contractor up front?
No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.
What's included in a Miami general contractor quote?
The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,750–$9,700), engineering ($310–$1,000), change orders ($5,600–$7,050 on a $5,000 change) and anything above an allowance.
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Prices for the Miami metro area, November 2026. Outer suburbs may vary.