How much does a general contractor cost in New York?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched13 min read
General contractor cost

General contractor costs in New York

New York, NYChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for New York, NY
$5,650–$10,750per $50k project

Most general contractors in New York charge $5,650–$10,750 to run a $50,000 remodel a 11.3–21.5% fee on the project, and $8,450 is what most homeowners here pay. Hourly, GCs bill $65–$175; a whole-house renovation of 2,000 sq ft is $59,500–$223,000.

How we get this data
Typical
$8,450
Low end
$4,500
High end
$14,100
Fee on a $50,000 remodel
$5,650–$10,750
Room addition, 400 sq ft
$59,500–$111,500
Kitchen remodel, mid-range
$29,500–$72,000
New build, per sq ft
$155–$280

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.

Get my fair quote →
Typical general contractor price: New York vs nearby citiesTypical price, per $50k project. The line marks the US typical.
New York, NYThis guide $8,450
Brooklyn, NY $8,250
Newark, NJ $8,050
Trenton, NJ $7,800
Stamford, CT $7,650

The typical New York price is $8,450, 13% above the US typical of $7,500.

Where New York sits among 195 US metrosNumber of metros at each typical general contractor price, per $50k project.

New York's price band

New York is pricier than 98% of the 195 US metros we price for general contractor work.

Expect a general contractor's fee of $5,650–$10,750 on a $50,000 remodel in New York, 11.3% to 21.5% of the project, with $8,450 the going rate. The fee scales with the job: $16,950–$32,500 on a $150,000 addition and $45,000–$86,000 to build a $400,000 house. New construction here runs about $155–$280 a square foot before land.

New York is one of the most expensive places in the country to build or remodel. A GC's fee on a $50,000 remodel here is about 13% above the US typical of $7,500, and the whole project moves with it: the subs' wages, the permit fees and the cost of getting materials to the site all run about 13% above the national figure.

New York has no statewide general contractor license, but New York City and several suburban counties license home improvement contractors, so ask for the city or county license number and proof of insurance. This is general information, not legal advice.

Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.

Quick answer

$5,650–$10,750 — typically $8,450 — is what a general contractor charges to run a $50,000 remodel in New York, a 11.3–21.5% fee on top of labor and materials. A 400 sq ft addition runs $59,500–$111,500 all in, a mid-range kitchen $29,500–$72,000, and new construction $155–$280 a square foot. Verified November 2026. Get free New York quotes →

  • GC fee on a $50,000 remodel: $5,650–$10,750 ($8,450 typical, 16.9%)
  • Hourly $65–$175; day rate $375–$575; construction manager $2,800–$8,050
  • Room addition, 400 sq ft: $59,500–$111,500; second story $143,000–$334,500
  • Kitchen $29,500–$72,000; bath $10,100–$27,000; basement finish $26,000–$55,500
  • New construction $155–$280 per sq ft; whole-house renovation $59,500–$223,000

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Detailed pricing — General contractor cost in New York 2026

Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. New York metro, re-verified November 2026. Permits, engineering and change orders are their own rows.

ServiceLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$5,650per $50k project$8,450$10,750
General contractor fee on a $150,000 addition or major remodelper $150k project$16,950per $150k project$25,500$32,500
General contractor fee to build a $400,000 houseper $400k build$45,000per $400k build$67,500$86,000
General contractor hourly rate (consulting, small jobs)/hr$65/hr$95$175
General contractor day rate (working on your site)per day$375per day$500$575
Project management only (construction manager) on a $50,000 jobper $50k project$2,800per $50k project$5,650$8,050
Change order: a $5,000 mid-project change (markup plus admin fee)per change$6,200per change$6,750$7,550
Building permit and plans for a remodel or additionper project$2,100per project$5,550$10,800
Structural inspection and written reportper job$360per job$660$1,100
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,450per job$3,000$5,600
Remove a load-bearing wall and install a beam (single story)per job$3,600per job$8,450$16,850
Deck build, about 200 sq ft, run by a general contractorper project$5,350per project$9,550$16,700
Covered patio or porch addition, about 200 sq ftper project$9,550per project$19,050$33,500
Detached two-car garage, built from the slab upper project$24,000per project$35,500$55,500
Basement finish, about 1,000 sq ftper project$26,000per project$41,500$55,500
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$10,100per project$17,250$27,000
Kitchen remodel, mid-range, run by a general contractorper project$29,500per project$47,000$72,000
Home addition, building out, per sq ftper sq ft$120per sq ft$210$280
Room addition, 20 × 20 ft (400 sq ft), finishedper project$59,500per project$89,500$111,500
Full second-story additionper project$143,000per project$208,500$334,500
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$143,000per unit$214,500$334,500
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$59,500per project$137,000$223,000
New home construction, per sq ft (standard finish, no land)per sq ft$155per sq ft$195$280
Tear down and rebuild a 2,000 sq ft houseper project$298,000per project$417,000$613,000
Bigger general contractor jobs in New York: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $417,000$298K–$613K
Full second-story addition $208,500$143K–$334K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $137,000$59.5K–$223K
Room addition, 20 × 20 ft (400 sq ft), finished $89,500$59.5K–$112K
Smaller general contractor jobs and repairs in New YorkPer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $47,000$29.5K–$72K
Basement finish, about 1,000 sq ft $41,500$26K–$55.5K
Detached two-car garage, built from the slab up $35,500$24K–$55.5K
Covered patio or porch addition, about 200 sq ft $19,050$9,550–$33.5K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $17,250$10.1K–$27K
Deck build, about 200 sq ft, run by a general contractor $9,550$5,350–$16.7K
Building permit and plans for a remodel or addition $5,550$2,100–$10.8K
Already got a quote?
Check it against these New York prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors in New York

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices cover the New York metro. Outlying towns can run a little lower; tight lots and older houses in Manhattan — Midtown & Chelsea and Brooklyn — Bushwick & Williamsburg sit at the top of each range.

How general contractor costs vary across New York

General contractor prices across New York

Same job, four price bands. Parking, permits and old buildings push Manhattan — Midtown & Chelsea to the top, and fees in New Jersey side & Long Island price near the city typical, with bigger projects.

General contractor prices across New YorkTypical range by part of the metro, per $50k project. The line marks the New York typical.
Manhattan — Midtown & Chelsea8–15% above the city average $6,100–$12.3Kper $50k project
Brooklyn — Bushwick & WilliamsburgStandard to 8% above $5,800–$11.6Kper $50k project
Queens, Harlem & the BronxStandard pricing $5,650–$10.8Kper $50k project
New Jersey side & Long IslandStandard; bigger additions and new builds $5,650–$11.2Kper $50k project

Manhattan — Midtown & Chelsea

8–15% above the city average
Midtown, Chelsea, Hell's Kitchen, Flatiron
Fee on a $50k job
$6,100–$12,350 per $50k project
400 sq ft addition
$64,500–$128,000 / 400 sq ft addition

The priciest part of the metro for any build: no room to stage materials, elevators to book, and more inspections. Expect the GC's percentage to sit at the high end and the schedule to run longer.

Brooklyn — Bushwick & Williamsburg

Standard to 8% above
Bushwick, Williamsburg, Greenpoint, Bed-Stuy
Fee on a $50k job
$5,800–$11,600 per $50k project
400 sq ft addition
$61,500–$120,500 / 400 sq ft addition

Lots of fix-and-flip and whole-house renovations. Bids vary widely; get three, and compare the allowances and exclusions line by line, not the bottom line.

Queens, Harlem & the Bronx

Standard pricing
Astoria, Long Island City, Harlem, South Bronx
Fee on a $50k job
$5,650–$10,750 per $50k project
400 sq ft addition
$59,500–$111,500 / 400 sq ft addition

Residential streets with average pricing. Bundling two projects (a kitchen and a bath, say) under one contract saves a second round of mobilization and fees.

New Jersey side & Long Island

Standard; bigger additions and new builds
Jersey City, Newark, Hoboken, Nassau County
Fee on a $50k job
$5,650–$11,200 per $50k project
400 sq ft addition
$59,500–$116,000 / 400 sq ft addition

Plenty of 1980s-and-later houses with simple framing, which keeps structural surprises rare. Expect average fees plus more square feet per project.

What you'll actually pay — job by job

Real-World General Contractor Costs in New York

Here's what common general contractor jobs cost in New York in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.

GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks

$5,650–$8,450

The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most New York homeowners pay about $8,450 (16.9%) for that; a structural change or a co-op board pushes the fee toward $10,750.

Remove a load-bearing wall for an open kitchen — 3 to 5 days

$3,600–$16,850

A structural engineer sizes the beam ($360–$1,100 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $3,600–$16,850 in New York for a single-story wall; a two-story wall or a hidden flush beam costs more.

400 sq ft room addition, finished — 3 to 5 months

$59,500–$111,500

Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $59,500–$111,500 all in, of which the GC's fee is about $13,450 at 16.9%. Permits and drawings ($2,100–$10,800) come first and take 4 to 12 weeks in most cities.

Detached two-car garage from the slab up — 4 to 8 weeks

$24,000–$55,500

Slab, framing, roof, siding, one overhead door and a basic electrical panel. $24,000–$55,500 in New York; finishing the inside, a second story or an ADU conversion is a different project.

Whole-house renovation of a 2,000 sq ft home — 4 to 8 months

$59,500–$223,000

Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $59,500–$223,000 in New York, GC fee included; a full gut to the studs runs $143,000–$357,500.

How much does a general contractor cost in New York?

$5,650–$10,750, with $8,450 typical. A simple same-layout remodel with a GC who runs a small crew sits at the low end; a project with structural work, a tight site or a lot of subs lands near the top. A fee above $10,750 on a $50,000 job usually means design or permit expediting is folded in.

The fee scales with the job: $16,950–$32,500 on a $150,000 addition and $45,000–$86,000 to build a $400,000 house. Whole projects, GC included, run $59,500–$111,500 for a 400 sq ft addition and $59,500–$223,000 for a 2,000 sq ft whole-house renovation. Prices re-checked against 23 sources in November 2026.

General contractor prices in New York (2026): fees, remodels, additions and new builds

The GC's fee on a $50,000 remodel is $5,650–$10,750, a 400 sq ft addition $59,500–$111,500, and new construction $155–$280 a square foot.

Line on the quoteLowTypicalHigh
GC fee on a $50,000 remodel$5,650$8,450$10,750
GC fee on a $150,000 addition$16,950$25,500$32,500
GC hourly rate$65$95$175
Kitchen remodel, mid-range$29,500$47,000$72,000
Room addition, 400 sq ft$59,500$89,500$111,500
Full second-story addition$143,000$208,500$334,500
Whole-house renovation, 2,000 sq ft$59,500$137,000$223,000
New home construction, per sq ft$155$195$280

Percentage or lump sum, the money is the same in New York: $8,450 on a $50,000 job is a 16.9% fee. Ask for the fee as a number and as a percentage, and ask what it covers; a bid that hides the fee inside the sub prices is harder to compare.

What moves a general contractor's quote in New York:

  • Project size and complexity — the fee is 11.3–21.5% of the job, so $5,650–$10,750 on $50,000 and $16,950–$32,500 on $150,000. Structural work, tight sites and many subs push the percentage up.
  • Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $8,450 typical on a $50,000 scope.
  • Permits and drawings — $2,100–$10,800 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
  • Change orders — a $5,000 mid-project change costs $6,200–$7,550 once markup and an admin fee are added. Lock the design before you sign.
  • The age of the house — once walls are open, inspectors in New York can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.

Ask every New York general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →

General Contractor Cost in New York by Project Size

Quick answer

$50,000 remodel: GC fee $5,650–$10,750. $150,000 addition: $16,950–$32,500. $400,000 new house: $45,000–$86,000. The whole project, GC included, runs $59,500–$111,500 for a 400 sq ft addition, $143,000–$334,500 for a full second story and $298,000–$613,000 to tear down and rebuild 2,000 sq ft.

Worked example: a New York 400 sq ft room addition at $89,500 typical. The GC's 16.9% is about $13,450; permits and drawings add $5,550; a structural engineer's report $660. Carry a 10% contingency ($8,950) for what the crew finds under the siding, and the realistic budget is about $104,660.

Going up costs more than going out. A full second story is $208,500 typical against $89,500 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $120–$280 and building up $240–$595.

New York General Contractor Costs by Contract and Job Type

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$5,650–$10,750 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 16.9% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$5,650–$10,750 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,800–$8,050 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$65–$175/hrSmall jobs, repairs and consulting, or $375–$575 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$10,100–$27,000 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$29,500–$72,000 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$26,000–$55,500 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$59,500–$111,500 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $120–$280 a square foot.
Full second-story addition (building up)$143,000–$334,500 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$59,500–$223,000 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$24,000–$55,500 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$143,000–$334,500 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$310,000–$560,000 per projectThe GC is the builder, at $155–$280 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$3,600–$16,850 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job type in New YorkTypical range, per project.
Bathroom remodel, mid-range (GC-run) $10.1K–$27Kper project
Kitchen remodel, mid-range (GC-run) $29.5K–$72Kper project
Basement finish, 1,000 sq ft $26K–$55.5Kper project
Room addition, 400 sq ft (building out) $59.5K–$112Kper project
Full second-story addition (building up) $143K–$334Kper project
Whole-house renovation, 2,000 sq ft $59.5K–$223Kper project
Detached two-car garage $24K–$55.5Kper project
Detached ADU, 600 sq ft turnkey $143K–$334Kper project
New home, 2,000 sq ft (construction only) $310K–$560Kper project
Structural work: remove a bearing wall $3,600–$16.9Kper project
New York tip: tie payments to milestones (foundation, framing, rough-in, finish), not to dates, and never pay more than 20% up front.

The fee vs. the project — what a New York general contractor bill really covers

On a $50,000 remodel in New York, the general contractor keeps about $8,450 — the 16.9% fee. The other $41,550 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.

The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,800–$8,050 and saves about $2,800 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.

What's included in a New York general contractor quote (and what costs extra)

A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:

  • Permits and drawings — $2,100–$10,800 for a remodel or addition, often billed as a pass-through
  • Engineering — $360–$1,100 for a structural report on any bearing wall or addition
  • Change orders — $6,200–$7,550 on a $5,000 change once markup and admin fees are added
  • Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup

Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.

What Affects General Contractor Costs in New York

Project size

The fee scales with the job: $5,650–$10,750 on $50,000, $16,950–$32,500 on $150,000, $45,000–$86,000 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.

Contract type

Cost-plus states the fee (11.3–21.5% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $65–$175 an hour plus costs and suits small or open-ended jobs.

Structural work and permits

Anything that needs a structural engineer's report ($360–$1,100) and a building permit ($2,100–$10,800 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $3,600–$16,850 in New York.

Change orders

A $5,000 change mid-project costs $6,200–$7,550 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.

Local rules and licensing

New York has no statewide general contractor license, but New York City and several suburban counties license home improvement contractors, so ask for the city or county license number and proof of insurance.

Labor rates in New York

Construction supervisors in the New York-Newark-Jersey City metro earn a median $103,990 a year in federal wage data, about 30% above the US median. Labor is 40% to 60% of a remodel or addition, so New York projects land about 13% above the US typical.

Season and schedule

Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some New York GCs sharpen their fee to keep crews working.

How to Save Money on a General Contractor in New York
  1. Lock the design and finishes before you sign.Every change after the contract costs $6,200–$7,550 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
  2. Get three itemized bids on the same drawings.Two New York bids can differ by $2,800 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
  3. Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($59,500–$223,000) costs less per room than the rooms done one at a time.
  4. Keep the footprint and the roofline.Building out costs $120–$280 a square foot; building up costs about twice that ($143,000–$334,500 for a full second story). A bump-out or a basement finish ($26,000–$55,500) is cheaper than either.
  5. Ask about an off-season start.Interior work in winter is slower for most New York GCs, and a start date in January or February can bring the fee down a point or two.
  6. Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
General Contractor Cost in New York: What the Quote Should Include

New York general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit and who meets the inspector
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, the warranty on the work, and lien releases from subs at each payment
Frequently asked questions — General contractor cost in New York
How much does a general contractor cost in New York?

$5,650–$10,750 (typically $8,450 here) to run a $50,000 remodel — a fee of 11.3% to 21.5% on top of labor and materials. On a $150,000 addition the fee is $16,950–$32,500.

What percentage do general contractors charge in New York?

About 11.3% to 21.5% of the project cost, 16.9% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.

How much do general contractors charge per hour in New York?

$65–$175 an hour for consulting and small jobs, or $375–$575 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost in New York?

$59,500–$111,500 for a finished 400 sq ft room addition, about $120–$280 a square foot building out. A full second story runs $143,000–$334,500.

How much does it cost to build a house in New York?

About $155–$280 a square foot for construction at a standard finish, so $310,000–$560,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $298,000–$613,000.

How much does a whole-house renovation cost in New York?

$59,500–$223,000 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.

Do I need a licensed general contractor in New York?

New York has no statewide general contractor license, but New York City and several suburban counties license home improvement contractors, so ask for the city or county license number and proof of insurance.

Is cost-plus or a fixed price better?

Cost-plus shows the fee (11.3–21.5% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $8,450.

How much should I pay a general contractor up front?

No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.

What's included in a New York general contractor quote?

The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($2,100–$10,800), engineering ($360–$1,100), change orders ($6,200–$7,550 on a $5,000 change) and anything above an allowance.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices for the New York metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read our full methodology →

Get a fair general contractor quote in New York

Local general contractors · Free quotes · No obligation, no spam.

Get quotes in New York →Max 2 general contractors will contact you
Get quotes in New YorkMax 2 general contractors · free · no spam→