How much does a general contractor cost in Fayetteville?
By Our research team · Last verified · Methodology
Most general contractors in Fayetteville charge $4,800–$9,400 to run a $50,000 remodel the fee for finding, scheduling and standing behind every sub on the job. $7,050 is the going rate; a detached two-car garage is $18,950–$45,500 and a new house $125–$230 a square foot.
How we get this data- Typical
- $7,050
- Low end
- $3,750
- High end
- $11,750
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.
Get my fair quote →The typical Fayetteville price is $7,050, 6% below the US typical of $7,500.
Fayetteville's price band
Fayetteville is cheaper than 87% of the 195 US metros we price for general contractor work.
Hiring a general contractor in Fayetteville costs $4,800–$9,400 on a $50,000 project, with most homeowners paying about $7,050, or 14.1% of the job. GCs here bill $45–$130 an hour for small jobs and consulting, a basement finish runs $21,000–$45,500, and a full second story $113,500–$273,000.
As a smaller market, Fayetteville prices a GC's fee about 6% below the US typical of $7,500 on a $50,000 job. Local pay drives it: construction supervisors in the Fayetteville metro earn a median $70,180 a year (about 12% below the US median), and the same wage pressure runs through every sub on the project.
North Carolina licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates. This is general information, not legal advice.
Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.
$4,800–$9,400 — typically $7,050 — is what a general contractor charges to run a $50,000 remodel in Fayetteville, a 9.6–18.8% fee on top of labor and materials. A 400 sq ft addition runs $47,500–$91,000 all in, a mid-range kitchen $23,500–$59,500, and new construction $125–$230 a square foot. Verified November 2026. Get free Fayetteville quotes →
- GC fee on a $50,000 remodel: $4,800–$9,400 ($7,050 typical, 14.1%)
- Hourly $45–$130; day rate $280–$440; construction manager $2,400–$7,050
- Room addition, 400 sq ft: $47,500–$91,000; second story $113,500–$273,000
- Kitchen $23,500–$59,500; bath $8,050–$22,000; basement finish $21,000–$45,500
- New construction $125–$230 per sq ft; whole-house renovation $47,500–$182,000
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Fayetteville metro, re-verified November 2026. Permits, engineering and change orders are their own rows.
| Service | Low | Typical | High |
|---|---|---|---|
| General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project | $4,800per $50k project | $7,050 | $9,400 |
| General contractor fee on a $150,000 addition or major remodelper $150k project | $14,400per $150k project | $21,000 | $28,000 |
| General contractor fee to build a $400,000 houseper $400k build | $38,500per $400k build | $56,500 | $75,000 |
| General contractor hourly rate (consulting, small jobs)/hr | $45/hr | $65 | $130 |
| General contractor day rate (working on your site)per day | $280per day | $350 | $440 |
| Project management only (construction manager) on a $50,000 jobper $50k project | $2,400per $50k project | $4,700 | $7,050 |
| Change order: a $5,000 mid-project change (markup plus admin fee)per change | $5,300per change | $5,650 | $6,600 |
| Building permit and plans for a remodel or additionper project | $1,600per project | $4,000 | $8,500 |
| Structural inspection and written reportper job | $285per job | $500 | $905 |
| Minor structural repair (header or lintel, crack stitching, wall ties)per job | $1,150per job | $2,250 | $4,500 |
| Remove a load-bearing wall and install a beam (single story)per job | $2,850per job | $6,350 | $13,550 |
| Deck build, about 200 sq ft, run by a general contractorper project | $4,250per project | $7,300 | $13,650 |
| Covered patio or porch addition, about 200 sq ftper project | $7,550per project | $14,550 | $27,500 |
| Detached two-car garage, built from the slab upper project | $18,950per project | $27,500 | $45,500 |
| Basement finish, about 1,000 sq ftper project | $21,000per project | $32,000 | $45,500 |
| Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project | $8,050per project | $13,200 | $22,000 |
| Kitchen remodel, mid-range, run by a general contractorper project | $23,500per project | $36,500 | $59,500 |
| Home addition, building out, per sq ftper sq ft | $95per sq ft | $160 | $230 |
| Room addition, 20 × 20 ft (400 sq ft), finishedper project | $47,500per project | $68,500 | $91,000 |
| Full second-story additionper project | $113,500per project | $159,500 | $273,000 |
| Detached ADU, 600 sq ft one-bedroom, turnkeyper unit | $113,500per unit | $164,000 | $273,000 |
| Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project | $47,500per project | $104,500 | $182,000 |
| New home construction, per sq ft (standard finish, no land)per sq ft | $125per sq ft | $150 | $230 |
| Tear down and rebuild a 2,000 sq ft houseper project | $236,500per project | $318,500 | $501,000 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local general contractors in Fayetteville
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning to build or remodel?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the general contractors who reply.
Where should they text you?
- Max 2 general contractors. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched general contractors see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 general contractors about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Figures are for the Fayetteville metro area. Travel is built into bids on the far edges; permit times and access in Downtown & Haymount push fees to the top of the range.
General contractor prices across Fayetteville
Same job, four price bands. Parking, permits and old buildings push Downtown & Haymount to the top; fees in Bonnie Doone & Murchison Road tend to come in at or under the city typical, and Hope Mills & Raeford has the bigger additions and garages.
Downtown & Haymount
- Fee on a $50k job
- $5,200–$10,800 per $50k project
- 400 sq ft addition
- $51,500–$104,500 / 400 sq ft addition
The priciest part of the metro for any build: no room to stage materials, elevators to book, and more inspections. Expect the GC's percentage to sit at the high end and the schedule to run longer.
Bonnie Doone & Murchison Road
- Fee on a $50k job
- $4,550–$9,200 per $50k project
- 400 sq ft addition
- $45,000–$89,000 / 400 sq ft addition
Lots of rentals and houses split into units. Landlord-driven renovations and code-upgrade jobs keep GCs busy, and fees sit a little under the city average.
Fort Liberty & Spring Lake
- Fee on a $50k job
- $4,800–$9,400 per $50k project
- 400 sq ft addition
- $47,500–$91,000 / 400 sq ft addition
Residential streets with average pricing. Bundling two projects (a kitchen and a bath, say) under one contract saves a second round of mobilization and fees.
Hope Mills & Raeford
- Fee on a $50k job
- $4,800–$9,800 per $50k project
- 400 sq ft addition
- $47,500–$94,500 / 400 sq ft addition
Mostly single-family homes on bigger lots, so additions, second stories, garages and basement finishes are the common jobs. Easy access keeps fees near the city average, but the projects themselves are bigger.
Real-World General Contractor Costs in Fayetteville
Here's what common general contractor jobs cost in Fayetteville in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.
GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks
The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Fayetteville homeowners pay about $7,050 (14.1%) for that; a structural change or a co-op board pushes the fee toward $9,400.
Remove a load-bearing wall for an open kitchen — 3 to 5 days
A structural engineer sizes the beam ($285–$905 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $2,850–$13,550 in Fayetteville for a single-story wall; a two-story wall or a hidden flush beam costs more.
400 sq ft room addition, finished — 3 to 5 months
Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $47,500–$91,000 all in, of which the GC's fee is about $10,300 at 14.1%. Permits and drawings ($1,600–$8,500) come first and take 4 to 12 weeks in most cities.
Detached two-car garage from the slab up — 4 to 8 weeks
Slab, framing, roof, siding, one overhead door and a basic electrical panel. $18,950–$45,500 in Fayetteville; finishing the inside, a second story or an ADU conversion is a different project.
Whole-house renovation of a 2,000 sq ft home — 4 to 8 months
Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $47,500–$182,000 in Fayetteville, GC fee included; a full gut to the studs runs $109,500–$273,000.
How much does a general contractor cost in Fayetteville?
$4,800–$9,400, with $7,050 typical. A simple same-layout remodel with a GC who runs a small crew sits at the low end; a project with structural work, a tight site or a lot of subs lands near the top. A fee above $9,400 on a $50,000 job usually means design or permit expediting is folded in.
Change orders are where the fee grows: a $5,000 mid-project change costs $5,300–$6,600 once the GC's markup and admin fee are added. Permits and drawings for an addition run $1,600–$8,500 before anyone picks up a hammer. Figures re-checked against 23 sources in November 2026.
General contractor prices in Fayetteville (2026): fees, remodels, additions and new builds
The GC's fee on a $50,000 remodel is $4,800–$9,400, a 400 sq ft addition $47,500–$91,000, and new construction $125–$230 a square foot.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| GC fee on a $50,000 remodel | $4,800 | $7,050 | $9,400 |
| GC fee on a $150,000 addition | $14,400 | $21,000 | $28,000 |
| GC hourly rate | $45 | $65 | $130 |
| Kitchen remodel, mid-range | $23,500 | $36,500 | $59,500 |
| Room addition, 400 sq ft | $47,500 | $68,500 | $91,000 |
| Full second-story addition | $113,500 | $159,500 | $273,000 |
| Whole-house renovation, 2,000 sq ft | $47,500 | $104,500 | $182,000 |
| New home construction, per sq ft | $125 | $150 | $230 |
Percentage or lump sum, the money is the same in Fayetteville: $7,050 on a $50,000 job is a 14.1% fee. Ask for the fee as a number and as a percentage, and ask what it covers; a bid that hides the fee inside the sub prices is harder to compare.
What moves a general contractor's quote in Fayetteville:
- Project size and complexity — the fee is 9.6–18.8% of the job, so $4,800–$9,400 on $50,000 and $14,400–$28,000 on $150,000. Structural work, tight sites and many subs push the percentage up.
- Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,050 typical on a $50,000 scope.
- Permits and drawings — $1,600–$8,500 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
- Change orders — a $5,000 mid-project change costs $5,300–$6,600 once markup and an admin fee are added. Lock the design before you sign.
- The age of the house — once walls are open, inspectors in Fayetteville can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.
Ask every Fayetteville general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →
General Contractor Cost in Fayetteville by Project Size
$50,000 remodel: GC fee $4,800–$9,400. $150,000 addition: $14,400–$28,000. $400,000 new house: $38,500–$75,000. The whole project, GC included, runs $47,500–$91,000 for a 400 sq ft addition, $113,500–$273,000 for a full second story and $236,500–$501,000 to tear down and rebuild 2,000 sq ft.
Worked example: a Fayetteville 400 sq ft room addition at $68,500 typical. The GC's 14.1% is about $10,300; permits and drawings add $4,000; a structural engineer's report $500. Carry a 10% contingency ($6,850) for what the crew finds under the siding, and the realistic budget is about $79,850.
Going up costs more than going out. A full second story is $159,500 typical against $68,500 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $95–$230 and building up $180–$455.
Fayetteville General Contractor Costs by Contract and Job Type
| Contract or job type | Cost | Best for |
|---|---|---|
| Cost-plus GC (fee as a percentage) | $4,800–$9,400 fee on a $50,000 job | You pay the real cost of labor and materials plus the GC's fee, about 14.1% here. Fair when the scope is still moving; set a not-to-exceed cap. |
| Fixed-price (lump sum) GC bid | $4,800–$9,400 fee inside a $50,000 job | One price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans. |
| Construction manager (project management only) | $2,400–$7,050 fee on a $50,000 job | You hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you. |
| Hourly or day rate | $45–$130/hr | Small jobs, repairs and consulting, or $280–$440 a day for a GC working on site. Project work is quoted as a price instead. |
| Bathroom remodel, mid-range (GC-run) | $8,050–$22,000 per project | The most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes. |
| Kitchen remodel, mid-range (GC-run) | $23,500–$59,500 per project | Cabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top. |
| Basement finish, 1,000 sq ft | $21,000–$45,500 per project | The cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it. |
| Room addition, 400 sq ft (building out) | $47,500–$91,000 per project | New footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $95–$230 a square foot. |
| Full second-story addition (building up) | $113,500–$273,000 per project | Roof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months. |
| Whole-house renovation, 2,000 sq ft | $47,500–$182,000 per project | Kitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time. |
| Detached two-car garage | $18,950–$45,500 per project | A shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project. |
| Detached ADU, 600 sq ft turnkey | $113,500–$273,000 per project | A small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows. |
| New home, 2,000 sq ft (construction only) | $250,000–$460,000 per project | The GC is the builder, at $125–$230 a square foot. Land, design, permits and utility hookups sit on top. |
| Structural work: remove a bearing wall | $2,850–$13,550 per project | Jobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector. |
The fee vs. the project — what a Fayetteville general contractor bill really covers
On a $50,000 remodel in Fayetteville, the general contractor keeps about $7,050 — the 14.1% fee. The other $42,950 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.
The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,400–$7,050 and saves about $2,350 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.
What's included in a Fayetteville general contractor quote (and what costs extra)
A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:
- Permits and drawings — $1,600–$8,500 for a remodel or addition, often billed as a pass-through
- Engineering — $285–$905 for a structural report on any bearing wall or addition
- Change orders — $5,300–$6,600 on a $5,000 change once markup and admin fees are added
- Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup
Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.
Project size
The fee scales with the job: $4,800–$9,400 on $50,000, $14,400–$28,000 on $150,000, $38,500–$75,000 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.
Contract type
Cost-plus states the fee (9.6–18.8% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $45–$130 an hour plus costs and suits small or open-ended jobs.
Structural work and permits
Anything that needs a structural engineer's report ($285–$905) and a building permit ($1,600–$8,500 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $2,850–$13,550 in Fayetteville.
Change orders
A $5,000 change mid-project costs $5,300–$6,600 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.
Local rules and licensing
North Carolina licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.
Labor rates in Fayetteville
Construction supervisors in the Fayetteville metro earn a median $70,180 a year in federal wage data, about 12% below the US median. Labor is 40% to 60% of a remodel or addition, so Fayetteville projects land about 6% below the US typical.
Season and schedule
Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Fayetteville GCs sharpen their fee to keep crews working.
- Lock the design and finishes before you sign.Every change after the contract costs $5,300–$6,600 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
- Get three itemized bids on the same drawings.Two Fayetteville bids can differ by $2,250 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
- Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($47,500–$182,000) costs less per room than the rooms done one at a time.
- Keep the footprint and the roofline.Building out costs $95–$230 a square foot; building up costs about twice that ($113,500–$273,000 for a full second story). A bump-out or a basement finish ($21,000–$45,500) is cheaper than either.
- Ask about an off-season start.Interior work in winter is slower for most Fayetteville GCs, and a start date in January or February can bring the fee down a point or two.
- Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
Fayetteville general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:
- The GC's fee as a percentage and a dollar figure, and what it covers
- Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
- Exclusions: permits, engineering, dumpster, utility connections, landscaping
- How change orders are priced: markup percentage and any admin fee
- Who pulls the permit and who meets the inspector
- A payment schedule tied to milestones, with the deposit capped
- The license or registration number where your state has one, plus liability and workers' comp certificates
- Start and finish dates, the warranty on the work, and lien releases from subs at each payment
How much does a general contractor cost in Fayetteville?
$4,800–$9,400 (typically $7,050 here) to run a $50,000 remodel — a fee of 9.6% to 18.8% on top of labor and materials. On a $150,000 addition the fee is $14,400–$28,000.
What percentage do general contractors charge in Fayetteville?
About 9.6% to 18.8% of the project cost, 14.1% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.
How much do general contractors charge per hour in Fayetteville?
$45–$130 an hour for consulting and small jobs, or $280–$440 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.
How much does a home addition cost in Fayetteville?
$47,500–$91,000 for a finished 400 sq ft room addition, about $95–$230 a square foot building out. A full second story runs $113,500–$273,000.
How much does it cost to build a house in Fayetteville?
About $125–$230 a square foot for construction at a standard finish, so $250,000–$460,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $236,500–$501,000.
How much does a whole-house renovation cost in Fayetteville?
$47,500–$182,000 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.
Do I need a licensed general contractor in North Carolina?
North Carolina licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.
Is cost-plus or a fixed price better?
Cost-plus shows the fee (9.6–18.8% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,050.
How much should I pay a general contractor up front?
No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.
What's included in a Fayetteville general contractor quote?
The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,600–$8,500), engineering ($285–$905), change orders ($5,300–$6,600 on a $5,000 change) and anything above an allowance.
Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology
Prices for the Fayetteville metro area, November 2026. Outer suburbs may vary.
Get a fair general contractor quote in Fayetteville
Local general contractors · Free quotes · No obligation, no spam.