How much does a general contractor cost in Hattiesburg?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched11 min read
General contractor cost

General contractor costs in Hattiesburg

Hattiesburg, MSChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Hattiesburg, MS
$4,800–$9,250per $50k project

Most general contractors in Hattiesburg charge $4,800–$9,250 to run a $50,000 remodel the fee for finding, scheduling and standing behind every sub on the job. $6,950 is the going rate; a detached two-car garage is $18,650–$44,500 and a new house $120–$220 a square foot.

How we get this data
Typical
$6,950
Low end
$3,700
High end
$11,600
Fee on a $50,000 remodel
$4,800–$9,250
Room addition, 400 sq ft
$46,500–$89,000
Kitchen remodel, mid-range
$23,500–$58,500
New build, per sq ft
$120–$220

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.

Get my fair quote →
Typical general contractor price: Hattiesburg vs nearby citiesTypical price, per $50k project. The line marks the US typical.
Gulfport, MS $7,200
Jackson, MS $7,100
Mobile, AL $7,050
Pensacola, FL $7,050
Hattiesburg, MSThis guide $6,950

The typical Hattiesburg price is $6,950, 7% below the US typical of $7,500.

Where Hattiesburg sits among 195 US metrosNumber of metros at each typical general contractor price, per $50k project.

Hattiesburg's price band

Hattiesburg is cheaper than 92% of the 195 US metros we price for general contractor work.

Hiring a general contractor in Hattiesburg costs $4,800–$9,250 on a $50,000 project, with most homeowners paying about $6,950, or 13.9% of the job. GCs here bill $45–$130 an hour for small jobs and consulting, a basement finish runs $20,500–$44,500, and a full second story $112,000–$267,000.

Hattiesburg is a smaller market. Construction supervisors in the Hattiesburg metro earn a median $65,740 a year in federal wage data, about 18% below the US median of $79,920. That pay gap sets the GC's overhead and the subs' bids, which is why a project here prices about 7% below the national typical.

Mississippi licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates. This is general information, not legal advice.

Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.

Quick answer

$4,800–$9,250 — typically $6,950 — is what a general contractor charges to run a $50,000 remodel in Hattiesburg, a 9.6–18.5% fee on top of labor and materials. A 400 sq ft addition runs $46,500–$89,000 all in, a mid-range kitchen $23,500–$58,500, and new construction $120–$220 a square foot. Verified November 2026. Get free Hattiesburg quotes →

  • GC fee on a $50,000 remodel: $4,800–$9,250 ($6,950 typical, 13.9%)
  • Hourly $45–$130; day rate $275–$425; construction manager $2,400–$6,950
  • Room addition, 400 sq ft: $46,500–$89,000; second story $112,000–$267,000
  • Kitchen $23,500–$58,500; bath $7,950–$21,500; basement finish $20,500–$44,500
  • New construction $120–$220 per sq ft; whole-house renovation $46,500–$178,000

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Detailed pricing — General contractor cost in Hattiesburg 2026

Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Hattiesburg metro, re-verified November 2026. Permits, engineering and change orders are their own rows.

ServiceLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$4,800per $50k project$6,950$9,250
General contractor fee on a $150,000 addition or major remodelper $150k project$14,400per $150k project$21,000$28,000
General contractor fee to build a $400,000 houseper $400k build$38,500per $400k build$55,500$74,000
General contractor hourly rate (consulting, small jobs)/hr$45/hr$65$130
General contractor day rate (working on your site)per day$275per day$340$425
Project management only (construction manager) on a $50,000 jobper $50k project$2,400per $50k project$4,650$6,950
Change order: a $5,000 mid-project change (markup plus admin fee)per change$5,250per change$5,550$6,500
Building permit and plans for a remodel or additionper project$1,550per project$3,900$8,250
Structural inspection and written reportper job$280per job$485$880
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,100per job$2,200$4,400
Remove a load-bearing wall and install a beam (single story)per job$2,800per job$6,150$13,250
Deck build, about 200 sq ft, run by a general contractorper project$4,200per project$7,100$13,350
Covered patio or porch addition, about 200 sq ftper project$7,450per project$14,250$26,500
Detached two-car garage, built from the slab upper project$18,650per project$26,500$44,500
Basement finish, about 1,000 sq ftper project$20,500per project$31,000$44,500
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$7,950per project$12,900$21,500
Kitchen remodel, mid-range, run by a general contractorper project$23,500per project$36,000$58,500
Home addition, building out, per sq ftper sq ft$95per sq ft$155$220
Room addition, 20 × 20 ft (400 sq ft), finishedper project$46,500per project$66,500$89,000
Full second-story additionper project$112,000per project$155,500$267,000
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$112,000per unit$160,000$267,000
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$46,500per project$102,500$178,000
New home construction, per sq ft (standard finish, no land)per sq ft$120per sq ft$145$220
Tear down and rebuild a 2,000 sq ft houseper project$233,500per project$311,500$489,000
Bigger general contractor jobs in Hattiesburg: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $311,500$234K–$489K
Full second-story addition $155,500$112K–$267K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $102,500$46.5K–$178K
Room addition, 20 × 20 ft (400 sq ft), finished $66,500$46.5K–$89K
Smaller general contractor jobs and repairs in HattiesburgPer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $36,000$23.5K–$58.5K
Basement finish, about 1,000 sq ft $31,000$20.5K–$44.5K
Detached two-car garage, built from the slab up $26,500$18.6K–$44.5K
Covered patio or porch addition, about 200 sq ft $14,250$7,450–$26.5K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $12,900$7,950–$21.5K
Deck build, about 200 sq ft, run by a general contractor $7,100$4,200–$13.3K
Building permit and plans for a remodel or addition $3,900$1,550–$8,250
Already got a quote?
Check it against these Hattiesburg prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors in Hattiesburg

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices cover the Hattiesburg metro. Outlying towns can run a little lower; tight lots and older houses in Downtown Hattiesburg and East & North Hattiesburg sit at the top of each range.

How general contractor costs vary across Hattiesburg

General contractor prices across Hattiesburg

Same job, four price bands. Parking, permits and old buildings push Downtown Hattiesburg to the top; fees in Southern Miss & Hardy Street tend to come in at or under the city typical, and Petal, Oak Grove & Laurel has the bigger additions and garages.

General contractor prices across HattiesburgTypical range by part of the metro, per $50k project. The line marks the Hattiesburg typical.
Downtown Hattiesburg8–15% above the city average $5,200–$10.7Kper $50k project
East & North HattiesburgStandard to 8% above $4,950–$10Kper $50k project
Southern Miss & Hardy Street2–5% below $4,550–$9,050per $50k project
Petal, Oak Grove & LaurelStandard; bigger additions and new builds $4,800–$9,600per $50k project

Downtown Hattiesburg

8–15% above the city average
Downtown, Midtown, Oaks District
Fee on a $50k job
$5,200–$10,650 per $50k project
400 sq ft addition
$50,000–$102,500 / 400 sq ft addition

The priciest part of the metro for any build: no room to stage materials, elevators to book, and more inspections. Expect the GC's percentage to sit at the high end and the schedule to run longer.

East & North Hattiesburg

Standard to 8% above
East Hattiesburg, Palmer's Crossing, Mobile Street
Fee on a $50k job
$4,950–$10,000 per $50k project
400 sq ft addition
$48,000–$96,000 / 400 sq ft addition

Older homes being updated one project at a time. Expect fees a little above the city average, and ask how the GC handles permits for older wiring and plumbing that inspectors will want brought up to code.

Southern Miss & Hardy Street

2–5% below
University of Southern Mississippi, Hardy Street
Fee on a $50k job
$4,550–$9,050 per $50k project
400 sq ft addition
$44,000–$87,000 / 400 sq ft addition

Lots of rentals and houses split into units. Landlord-driven renovations and code-upgrade jobs keep GCs busy, and fees sit a little under the city average.

Petal, Oak Grove & Laurel

Standard; bigger additions and new builds
Petal, Oak Grove, Laurel, Purvis
Fee on a $50k job
$4,800–$9,600 per $50k project
400 sq ft addition
$46,500–$92,500 / 400 sq ft addition

Mostly single-family homes on bigger lots, so additions, second stories, garages and basement finishes are the common jobs. Easy access keeps fees near the city average, but the projects themselves are bigger.

What you'll actually pay — job by job

Real-World General Contractor Costs in Hattiesburg

Here's what common general contractor jobs cost in Hattiesburg in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.

GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks

$4,800–$6,950

The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Hattiesburg homeowners pay about $6,950 (13.9%) for that; a structural change or a co-op board pushes the fee toward $9,250.

Remove a load-bearing wall for an open kitchen — 3 to 5 days

$2,800–$13,250

A structural engineer sizes the beam ($280–$880 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $2,800–$13,250 in Hattiesburg for a single-story wall; a two-story wall or a hidden flush beam costs more.

400 sq ft room addition, finished — 3 to 5 months

$46,500–$89,000

Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $46,500–$89,000 all in, of which the GC's fee is about $10,000 at 13.9%. Permits and drawings ($1,550–$8,250) come first and take 4 to 12 weeks in most cities.

Detached two-car garage from the slab up — 4 to 8 weeks

$18,650–$44,500

Slab, framing, roof, siding, one overhead door and a basic electrical panel. $18,650–$44,500 in Hattiesburg; finishing the inside, a second story or an ADU conversion is a different project.

Whole-house renovation of a 2,000 sq ft home — 4 to 8 months

$46,500–$178,000

Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $46,500–$178,000 in Hattiesburg, GC fee included; a full gut to the studs runs $106,500–$267,000.

How much does a general contractor cost in Hattiesburg?

Between $4,800 and $9,250 on a $50,000 remodel, and $6,950 is the fee most Hattiesburg homeowners pay. The fee is 9.6% to 18.5% of the project and it buys the GC's time: bidding, hiring and scheduling the subs, pulling permits, meeting inspectors and carrying the insurance and the warranty.

Change orders are where the fee grows: a $5,000 mid-project change costs $5,250–$6,500 once the GC's markup and admin fee are added. Permits and drawings for an addition run $1,550–$8,250 before anyone picks up a hammer. Figures re-checked against 23 sources in November 2026.

General contractor prices in Hattiesburg (2026): fees, remodels, additions and new builds

The GC's fee on a $50,000 remodel is $4,800–$9,250, a 400 sq ft addition $46,500–$89,000, and new construction $120–$220 a square foot.

Line on the quoteLowTypicalHigh
GC fee on a $50,000 remodel$4,800$6,950$9,250
GC fee on a $150,000 addition$14,400$21,000$28,000
GC hourly rate$45$65$130
Kitchen remodel, mid-range$23,500$36,000$58,500
Room addition, 400 sq ft$46,500$66,500$89,000
Full second-story addition$112,000$155,500$267,000
Whole-house renovation, 2,000 sq ft$46,500$102,500$178,000
New home construction, per sq ft$120$145$220

The fee is the small part of the bill. On a $66,500 addition the GC keeps about $10,000; the rest goes to the subs, the lumber yard, the permit office and the dumpster company. Cutting the GC saves the fee and hands you everything else.

What moves a general contractor's quote in Hattiesburg:

  • Project size and complexity — the fee is 9.6–18.5% of the job, so $4,800–$9,250 on $50,000 and $14,400–$28,000 on $150,000. Structural work, tight sites and many subs push the percentage up.
  • Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $6,950 typical on a $50,000 scope.
  • Permits and drawings — $1,550–$8,250 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
  • Change orders — a $5,000 mid-project change costs $5,250–$6,500 once markup and an admin fee are added. Lock the design before you sign.
  • The age of the house — once walls are open, inspectors in Hattiesburg can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.

Ask every Hattiesburg general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →

General Contractor Cost in Hattiesburg by Project Size

Quick answer

$50,000 remodel: GC fee $4,800–$9,250. $150,000 addition: $14,400–$28,000. $400,000 new house: $38,500–$74,000. The whole project, GC included, runs $46,500–$89,000 for a 400 sq ft addition, $112,000–$267,000 for a full second story and $233,500–$489,000 to tear down and rebuild 2,000 sq ft.

Worked example: a Hattiesburg 400 sq ft room addition at $66,500 typical. The GC's 13.9% is about $10,000; permits and drawings add $3,900; a structural engineer's report $485. Carry a 10% contingency ($6,650) for what the crew finds under the siding, and the realistic budget is about $77,535.

Going up costs more than going out. A full second story is $155,500 typical against $66,500 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $95–$220 and building up $180–$445.

Hattiesburg General Contractor Costs by Contract and Job Type

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$4,800–$9,250 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 13.9% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$4,800–$9,250 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,400–$6,950 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$45–$130/hrSmall jobs, repairs and consulting, or $275–$425 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$7,950–$21,500 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$23,500–$58,500 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$20,500–$44,500 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$46,500–$89,000 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $95–$220 a square foot.
Full second-story addition (building up)$112,000–$267,000 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$46,500–$178,000 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$18,650–$44,500 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$112,000–$267,000 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$240,000–$440,000 per projectThe GC is the builder, at $120–$220 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$2,800–$13,250 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job type in HattiesburgTypical range, per project.
Bathroom remodel, mid-range (GC-run) $7,950–$21.5Kper project
Kitchen remodel, mid-range (GC-run) $23.5K–$58.5Kper project
Basement finish, 1,000 sq ft $20.5K–$44.5Kper project
Room addition, 400 sq ft (building out) $46.5K–$89Kper project
Full second-story addition (building up) $112K–$267Kper project
Whole-house renovation, 2,000 sq ft $46.5K–$178Kper project
Detached two-car garage $18.6K–$44.5Kper project
Detached ADU, 600 sq ft turnkey $112K–$267Kper project
New home, 2,000 sq ft (construction only) $240K–$440Kper project
Structural work: remove a bearing wall $2,800–$13.2Kper project
Hattiesburg tip: tie payments to milestones (foundation, framing, rough-in, finish), not to dates, and never pay more than 20% up front.

The fee vs. the project — what a Hattiesburg general contractor bill really covers

On a $50,000 remodel in Hattiesburg, the general contractor keeps about $6,950 — the 13.9% fee. The other $43,050 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.

The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,400–$6,950 and saves about $2,300 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.

What's included in a Hattiesburg general contractor quote (and what costs extra)

A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:

  • Permits and drawings — $1,550–$8,250 for a remodel or addition, often billed as a pass-through
  • Engineering — $280–$880 for a structural report on any bearing wall or addition
  • Change orders — $5,250–$6,500 on a $5,000 change once markup and admin fees are added
  • Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup

Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.

What Affects General Contractor Costs in Hattiesburg

Project size

The fee scales with the job: $4,800–$9,250 on $50,000, $14,400–$28,000 on $150,000, $38,500–$74,000 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.

Contract type

Cost-plus states the fee (9.6–18.5% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $45–$130 an hour plus costs and suits small or open-ended jobs.

Structural work and permits

Anything that needs a structural engineer's report ($280–$880) and a building permit ($1,550–$8,250 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $2,800–$13,250 in Hattiesburg.

Change orders

A $5,000 change mid-project costs $5,250–$6,500 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.

Local rules and licensing

Mississippi licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.

Labor rates in Hattiesburg

Construction supervisors in the Hattiesburg metro earn a median $65,740 a year in federal wage data, about 18% below the US median. Labor is 40% to 60% of a remodel or addition, so Hattiesburg projects land about 7% below the US typical.

Season and schedule

Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Hattiesburg GCs sharpen their fee to keep crews working.

How to Save Money on a General Contractor in Hattiesburg
  1. Lock the design and finishes before you sign.Every change after the contract costs $5,250–$6,500 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
  2. Get three itemized bids on the same drawings.Two Hattiesburg bids can differ by $2,150 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
  3. Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($46,500–$178,000) costs less per room than the rooms done one at a time.
  4. Keep the footprint and the roofline.Building out costs $95–$220 a square foot; building up costs about twice that ($112,000–$267,000 for a full second story). A bump-out or a basement finish ($20,500–$44,500) is cheaper than either.
  5. Ask about an off-season start.Interior work in winter is slower for most Hattiesburg GCs, and a start date in January or February can bring the fee down a point or two.
  6. Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
General Contractor Cost in Hattiesburg: What the Quote Should Include

Hattiesburg general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit and who meets the inspector
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, the warranty on the work, and lien releases from subs at each payment
Frequently asked questions — General contractor cost in Hattiesburg
How much does a general contractor cost in Hattiesburg?

$4,800–$9,250 (typically $6,950 here) to run a $50,000 remodel — a fee of 9.6% to 18.5% on top of labor and materials. On a $150,000 addition the fee is $14,400–$28,000.

What percentage do general contractors charge in Hattiesburg?

About 9.6% to 18.5% of the project cost, 13.9% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.

How much do general contractors charge per hour in Hattiesburg?

$45–$130 an hour for consulting and small jobs, or $275–$425 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost in Hattiesburg?

$46,500–$89,000 for a finished 400 sq ft room addition, about $95–$220 a square foot building out. A full second story runs $112,000–$267,000.

How much does it cost to build a house in Hattiesburg?

About $120–$220 a square foot for construction at a standard finish, so $240,000–$440,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $233,500–$489,000.

How much does a whole-house renovation cost in Hattiesburg?

$46,500–$178,000 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.

Do I need a licensed general contractor in Mississippi?

Mississippi licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.

Is cost-plus or a fixed price better?

Cost-plus shows the fee (9.6–18.5% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $6,950.

How much should I pay a general contractor up front?

No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.

What's included in a Hattiesburg general contractor quote?

The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,550–$8,250), engineering ($280–$880), change orders ($5,250–$6,500 on a $5,000 change) and anything above an allowance.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices for the Hattiesburg metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read our full methodology →

Get a fair general contractor quote in Hattiesburg

Local general contractors · Free quotes · No obligation, no spam.

Get quotes in Hattiesburg →Max 2 general contractors will contact you
Get quotes in HattiesburgMax 2 general contractors · free · no spam→