Skip to content
Independent United States Cost GuidesPrices verified November 2026 · 39 trades · 195 US cities · 221+ sources For pros →
Get a fair quote

Cost guides

Plumbing & water4 trades
Electrical & energy5 trades
Renovation8 trades
Structural7 trades
Outdoor & yard7 trades
Cleaning & maintenance8 trades

More

Get a fair quote
Cost guide

How much does a general contractor cost in Chattanooga?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched12 min read
General contractor cost

General contractor costs in Chattanooga

Chattanooga, TNChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Chattanooga, TN
$4,850–$9,550per $50k project

Most general contractors in Chattanooga charge $4,850–$9,550 to run a $50,000 remodel that is a fee of about 9.7% to 19.1% on top of labor and materials, with $7,150 (14.3%) the typical bill. A 400 sq ft addition runs $48,000–$93,500 all in; a mid-range kitchen $24,000–$61,000.

How we get this data
Typical
$7,150
Low end
$3,800
High end
$11,950
Fee on a $50,000 remodel
$4,850–$9,550
Room addition, 400 sq ft
$48,000–$93,500
Kitchen remodel, mid-range
$24,000–$61,000
New build, per sq ft
$125–$235

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.

Get my fair quote →
Typical general contractor price: Chattanooga vs nearby citiesTypical price, per $50k project. The line marks the US typical.
Atlanta, GA $7,700
Nashville, TN $7,650
Athens, GA $7,200
Chattanooga, TNThis guide $7,150
Knoxville, TN $7,100

The typical Chattanooga price is $7,150, 5% below the US typical of $7,500.

Where Chattanooga sits among 195 US metrosNumber of metros at each typical general contractor price, per $50k project.

Chattanooga's price band

Chattanooga is cheaper than 77% of the 195 US metros we price for general contractor work.

A general contractor in Chattanooga charges $4,850–$9,550 to run a $50,000 remodel, which is a fee of 9.7% to 19.1% on top of the labor and materials, and $7,150 (14.3%) is typical. On a $150,000 addition the fee is $14,550–$28,500. A 400 sq ft room addition costs $48,000–$93,500 all in, and a mid-range kitchen $24,000–$61,000.

As a smaller market, Chattanooga prices a GC's fee about 5% below the US typical of $7,500 on a $50,000 job. Local pay drives it: construction supervisors in the Chattanooga metro earn a median $75,090 a year (about 6% below the US median), and the same wage pressure runs through every sub on the project.

Tennessee licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates. This is general information, not legal advice.

Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.

Quick answer

$4,850–$9,550 — typically $7,150 — is what a general contractor charges to run a $50,000 remodel in Chattanooga, a 9.7–19.1% fee on top of labor and materials. A 400 sq ft addition runs $48,000–$93,500 all in, a mid-range kitchen $24,000–$61,000, and new construction $125–$235 a square foot. Verified November 2026. Get free Chattanooga quotes →

  • GC fee on a $50,000 remodel: $4,850–$9,550 ($7,150 typical, 14.3%)
  • Hourly $45–$135; day rate $285–$455; construction manager $2,450–$7,150
  • Room addition, 400 sq ft: $48,000–$93,500; second story $115,000–$280,000
  • Kitchen $24,000–$61,000; bath $8,150–$22,500; basement finish $21,000–$46,500
  • New construction $125–$235 per sq ft; whole-house renovation $48,000–$186,500

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Detailed pricing — General contractor cost in Chattanooga 2026

Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Chattanooga metro, re-verified November 2026. Permits, engineering and change orders are their own rows.

ServiceLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$4,850per $50k project$7,150$9,550
General contractor fee on a $150,000 addition or major remodelper $150k project$14,550per $150k project$21,500$28,500
General contractor fee to build a $400,000 houseper $400k build$39,000per $400k build$57,000$76,500
General contractor hourly rate (consulting, small jobs)/hr$45/hr$70$135
General contractor day rate (working on your site)per day$285per day$365$455
Project management only (construction manager) on a $50,000 jobper $50k project$2,450per $50k project$4,800$7,150
Change order: a $5,000 mid-project change (markup plus admin fee)per change$5,350per change$5,750$6,700
Building permit and plans for a remodel or additionper project$1,600per project$4,150$8,750
Structural inspection and written reportper job$285per job$510$930
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,150per job$2,300$4,650
Remove a load-bearing wall and install a beam (single story)per job$2,850per job$6,500$13,950
Deck build, about 200 sq ft, run by a general contractorper project$4,300per project$7,450$14,000
Covered patio or porch addition, about 200 sq ftper project$7,700per project$14,950$28,000
Detached two-car garage, built from the slab upper project$19,200per project$28,000$46,500
Basement finish, about 1,000 sq ftper project$21,000per project$32,500$46,500
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$8,150per project$13,550$22,500
Kitchen remodel, mid-range, run by a general contractorper project$24,000per project$37,500$61,000
Home addition, building out, per sq ftper sq ft$95per sq ft$165$235
Room addition, 20 × 20 ft (400 sq ft), finishedper project$48,000per project$70,000$93,500
Full second-story additionper project$115,000per project$163,500$280,000
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$115,000per unit$168,000$280,000
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$48,000per project$107,500$186,500
New home construction, per sq ft (standard finish, no land)per sq ft$125per sq ft$155$235
Tear down and rebuild a 2,000 sq ft houseper project$240,000per project$326,500$513,500
Bigger general contractor jobs in Chattanooga: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $326,500$240K–$514K
Full second-story addition $163,500$115K–$280K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $107,500$48K–$186K
Room addition, 20 × 20 ft (400 sq ft), finished $70,000$48K–$93.5K
Smaller general contractor jobs and repairs in ChattanoogaPer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $37,500$24K–$61K
Basement finish, about 1,000 sq ft $32,500$21K–$46.5K
Detached two-car garage, built from the slab up $28,000$19.2K–$46.5K
Covered patio or porch addition, about 200 sq ft $14,950$7,700–$28K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $13,550$8,150–$22.5K
Deck build, about 200 sq ft, run by a general contractor $7,450$4,300–$14K
Building permit and plans for a remodel or addition $4,150$1,600–$8,750
Already got a quote?
Check it against these Chattanooga prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors in Chattanooga

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Figures are for the Chattanooga metro area. Travel is built into bids on the far edges; permit times and access in Downtown, Southside & North Shore push fees to the top of the range.

How general contractor costs vary across Chattanooga

General contractor prices across Chattanooga

Where you live changes the GC's overhead, not the price of lumber. Tight lots and older houses in Downtown, Southside & North Shore take the longest; fees in Hixson, East Ridge & Cleveland TN price near the city typical, with bigger projects.

General contractor prices across ChattanoogaTypical range by part of the metro, per $50k project. The line marks the Chattanooga typical.
Downtown, Southside & North Shore8–15% above the city average $5,250–$11Kper $50k project
East Chattanooga & Alton ParkStandard to 8% above $5,000–$10.3Kper $50k project
Highland Park & GlenwoodStandard pricing $4,850–$9,550per $50k project
Hixson, East Ridge & Cleveland TNStandard; bigger additions and new builds $4,850–$9,950per $50k project

Downtown, Southside & North Shore

8–15% above the city average
Downtown, Southside, North Shore
Fee on a $50k job
$5,250–$11,000 per $50k project
400 sq ft addition
$52,000–$107,500 / 400 sq ft addition

Older buildings, tight lots and paid parking. Permits take longer, dumpsters need street permits, and condo or co-op boards add insurance and work-hour rules, so GC fees here run at the top of the city range.

East Chattanooga & Alton Park

Standard to 8% above
East Chattanooga, Alton Park, Brainerd
Fee on a $50k job
$5,000–$10,300 per $50k project
400 sq ft addition
$49,500–$101,000 / 400 sq ft addition

Lots of fix-and-flip and whole-house renovations. Bids vary widely; get three, and compare the allowances and exclusions line by line, not the bottom line.

Highland Park & Glenwood

Standard pricing
Highland Park, Glenwood, Ridgedale
Fee on a $50k job
$4,850–$9,550 per $50k project
400 sq ft addition
$48,000–$93,500 / 400 sq ft addition

Residential streets with average pricing. Bundling two projects (a kitchen and a bath, say) under one contract saves a second round of mobilization and fees.

Hixson, East Ridge & Cleveland TN

Standard; bigger additions and new builds
Hixson, East Ridge, Red Bank, Cleveland TN
Fee on a $50k job
$4,850–$9,950 per $50k project
400 sq ft addition
$48,000–$97,000 / 400 sq ft addition

Newer subdivisions with HOA design review on top of the city permit. Fees are average; the HOA approval adds weeks, not dollars, unless the design has to change.

What you'll actually pay — job by job

Real-World General Contractor Costs in Chattanooga

Here's what common general contractor jobs cost in Chattanooga in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.

GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks

$4,850–$7,150

The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Chattanooga homeowners pay about $7,150 (14.3%) for that; a structural change or a co-op board pushes the fee toward $9,550.

Remove a load-bearing wall for an open kitchen — 3 to 5 days

$2,850–$13,950

A structural engineer sizes the beam ($285–$930 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $2,850–$13,950 in Chattanooga for a single-story wall; a two-story wall or a hidden flush beam costs more.

400 sq ft room addition, finished — 3 to 5 months

$48,000–$93,500

Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $48,000–$93,500 all in, of which the GC's fee is about $10,500 at 14.3%. Permits and drawings ($1,600–$8,750) come first and take 4 to 12 weeks in most cities.

Detached two-car garage from the slab up — 4 to 8 weeks

$19,200–$46,500

Slab, framing, roof, siding, one overhead door and a basic electrical panel. $19,200–$46,500 in Chattanooga; finishing the inside, a second story or an ADU conversion is a different project.

Whole-house renovation of a 2,000 sq ft home — 4 to 8 months

$48,000–$186,500

Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $48,000–$186,500 in Chattanooga, GC fee included; a full gut to the studs runs $112,000–$280,000.

How much does a general contractor cost in Chattanooga?

$4,850–$9,550, with $7,150 typical. A simple same-layout remodel with a GC who runs a small crew sits at the low end; a project with structural work, a tight site or a lot of subs lands near the top. A fee above $9,550 on a $50,000 job usually means design or permit expediting is folded in.

If you only want someone to schedule the subs you hire yourself, a construction manager charges $2,450–$7,150 on a $50,000 job, roughly half a GC's fee, but the risk stays with you. GCs here bill $45–$135 an hour for small jobs. Figures re-checked against 23 sources in November 2026.

General contractor prices in Chattanooga (2026): fees, remodels, additions and new builds

The GC's fee on a $50,000 remodel is $4,850–$9,550, a 400 sq ft addition $48,000–$93,500, and new construction $125–$235 a square foot.

Line on the quoteLowTypicalHigh
GC fee on a $50,000 remodel$4,850$7,150$9,550
GC fee on a $150,000 addition$14,550$21,500$28,500
GC hourly rate$45$70$135
Kitchen remodel, mid-range$24,000$37,500$61,000
Room addition, 400 sq ft$48,000$70,000$93,500
Full second-story addition$115,000$163,500$280,000
Whole-house renovation, 2,000 sq ft$48,000$107,500$186,500
New home construction, per sq ft$125$155$235

The fee is the small part of the bill. On a $70,000 addition the GC keeps about $10,500; the rest goes to the subs, the lumber yard, the permit office and the dumpster company. Cutting the GC saves the fee and hands you everything else.

What moves a general contractor's quote in Chattanooga:

  • Project size and complexity — the fee is 9.7–19.1% of the job, so $4,850–$9,550 on $50,000 and $14,550–$28,500 on $150,000. Structural work, tight sites and many subs push the percentage up.
  • Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,150 typical on a $50,000 scope.
  • Permits and drawings — $1,600–$8,750 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
  • Change orders — a $5,000 mid-project change costs $5,350–$6,700 once markup and an admin fee are added. Lock the design before you sign.
  • The age of the house — once walls are open, inspectors in Chattanooga can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.

Ask every Chattanooga general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →

General Contractor Cost in Chattanooga by Project Size

Quick answer

$50,000 remodel: GC fee $4,850–$9,550. $150,000 addition: $14,550–$28,500. $400,000 new house: $39,000–$76,500. The whole project, GC included, runs $48,000–$93,500 for a 400 sq ft addition, $115,000–$280,000 for a full second story and $240,000–$513,500 to tear down and rebuild 2,000 sq ft.

Worked example: a Chattanooga 400 sq ft room addition at $70,000 typical. The GC's 14.3% is about $10,500; permits and drawings add $4,150; a structural engineer's report $510. Carry a 10% contingency ($7,000) for what the crew finds under the siding, and the realistic budget is about $81,660.

Going up costs more than going out. A full second story is $163,500 typical against $70,000 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $95–$235 and building up $185–$465.

Chattanooga General Contractor Costs by Contract and Job Type

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$4,850–$9,550 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 14.3% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$4,850–$9,550 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,450–$7,150 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$45–$135/hrSmall jobs, repairs and consulting, or $285–$455 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$8,150–$22,500 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$24,000–$61,000 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$21,000–$46,500 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$48,000–$93,500 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $95–$235 a square foot.
Full second-story addition (building up)$115,000–$280,000 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$48,000–$186,500 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$19,200–$46,500 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$115,000–$280,000 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$250,000–$470,000 per projectThe GC is the builder, at $125–$235 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$2,850–$13,950 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job type in ChattanoogaTypical range, per project.
Bathroom remodel, mid-range (GC-run) $8,150–$22.5Kper project
Kitchen remodel, mid-range (GC-run) $24K–$61Kper project
Basement finish, 1,000 sq ft $21K–$46.5Kper project
Room addition, 400 sq ft (building out) $48K–$93.5Kper project
Full second-story addition (building up) $115K–$280Kper project
Whole-house renovation, 2,000 sq ft $48K–$186Kper project
Detached two-car garage $19.2K–$46.5Kper project
Detached ADU, 600 sq ft turnkey $115K–$280Kper project
New home, 2,000 sq ft (construction only) $250K–$470Kper project
Structural work: remove a bearing wall $2,850–$13.9Kper project
Chattanooga tip: tie payments to milestones (foundation, framing, rough-in, finish), not to dates, and never pay more than 20% up front.

The fee vs. the project — what a Chattanooga general contractor bill really covers

On a $50,000 remodel in Chattanooga, the general contractor keeps about $7,150 — the 14.3% fee. The other $42,850 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.

The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,450–$7,150 and saves about $2,350 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.

What's included in a Chattanooga general contractor quote (and what costs extra)

A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:

  • Permits and drawings — $1,600–$8,750 for a remodel or addition, often billed as a pass-through
  • Engineering — $285–$930 for a structural report on any bearing wall or addition
  • Change orders — $5,350–$6,700 on a $5,000 change once markup and admin fees are added
  • Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup

Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.

What Affects General Contractor Costs in Chattanooga

Project size

The fee scales with the job: $4,850–$9,550 on $50,000, $14,550–$28,500 on $150,000, $39,000–$76,500 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.

Contract type

Cost-plus states the fee (9.7–19.1% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $45–$135 an hour plus costs and suits small or open-ended jobs.

Structural work and permits

Anything that needs a structural engineer's report ($285–$930) and a building permit ($1,600–$8,750 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $2,850–$13,950 in Chattanooga.

Change orders

A $5,000 change mid-project costs $5,350–$6,700 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.

Local rules and licensing

Tennessee licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.

Labor rates in Chattanooga

Construction supervisors in the Chattanooga metro earn a median $75,090 a year in federal wage data, about 6% below the US median. Labor is 40% to 60% of a remodel or addition, so Chattanooga projects land about 5% below the US typical.

Season and schedule

Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Chattanooga GCs sharpen their fee to keep crews working.

How to Save Money on a General Contractor in Chattanooga
  1. Lock the design and finishes before you sign.Every change after the contract costs $5,350–$6,700 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
  2. Get three itemized bids on the same drawings.Two Chattanooga bids can differ by $2,300 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
  3. Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($48,000–$186,500) costs less per room than the rooms done one at a time.
  4. Keep the footprint and the roofline.Building out costs $95–$235 a square foot; building up costs about twice that ($115,000–$280,000 for a full second story). A bump-out or a basement finish ($21,000–$46,500) is cheaper than either.
  5. Ask about an off-season start.Interior work in winter is slower for most Chattanooga GCs, and a start date in January or February can bring the fee down a point or two.
  6. Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
General Contractor Cost in Chattanooga: What the Quote Should Include

Chattanooga general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit and who meets the inspector
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, the warranty on the work, and lien releases from subs at each payment
Frequently asked questions — General contractor cost in Chattanooga
How much does a general contractor cost in Chattanooga?

$4,850–$9,550 (typically $7,150 here) to run a $50,000 remodel — a fee of 9.7% to 19.1% on top of labor and materials. On a $150,000 addition the fee is $14,550–$28,500.

What percentage do general contractors charge in Chattanooga?

About 9.7% to 19.1% of the project cost, 14.3% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.

How much do general contractors charge per hour in Chattanooga?

$45–$135 an hour for consulting and small jobs, or $285–$455 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost in Chattanooga?

$48,000–$93,500 for a finished 400 sq ft room addition, about $95–$235 a square foot building out. A full second story runs $115,000–$280,000.

How much does it cost to build a house in Chattanooga?

About $125–$235 a square foot for construction at a standard finish, so $250,000–$470,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $240,000–$513,500.

How much does a whole-house renovation cost in Chattanooga?

$48,000–$186,500 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.

Do I need a licensed general contractor in Tennessee?

Tennessee licenses general contractors at the state level, with an exam, so ask for the license number and check it on the state board's website along with liability and workers' comp certificates.

Is cost-plus or a fixed price better?

Cost-plus shows the fee (9.7–19.1% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,150.

How much should I pay a general contractor up front?

No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.

What's included in a Chattanooga general contractor quote?

The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,600–$8,750), engineering ($285–$930), change orders ($5,350–$6,700 on a $5,000 change) and anything above an allowance.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices for the Chattanooga metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read our full methodology →

Get a fair general contractor quote in Chattanooga

Local general contractors · Free quotes · No obligation, no spam.

Get quotes in Chattanooga →Max 2 general contractors will contact you
Get quotes in ChattanoogaMax 2 general contractors · free · no spam→