How much does a general contractor cost in Madison?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched11 min read
General contractor cost

General contractor costs in Madison

Madison, WIChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Madison, WI
$5,050–$10,050per $50k project

Most general contractors in Madison charge $5,050–$10,050 to run a $50,000 remodel that is a fee of about 10.1% to 20.1% on top of labor and materials, with $7,550 (15.1%) the typical bill. A 400 sq ft addition runs $50,500–$100,500 all in; a mid-range kitchen $25,500–$65,500.

How we get this data
Typical
$7,550
Low end
$4,050
High end
$12,600
Fee on a $50,000 remodel
$5,050–$10,050
Room addition, 400 sq ft
$50,500–$100,500
Kitchen remodel, mid-range
$25,500–$65,500
New build, per sq ft
$130–$250

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.

Get my fair quote →
Typical general contractor price: Madison vs nearby citiesTypical price, per $50k project. The line marks the US typical.
Chicago, IL $8,400
Rockford, IL $7,750
Milwaukee, WI $7,750
Appleton, WI $7,650
Madison, WIThis guide $7,550
Davenport, IA $7,400
Green Bay, WI $7,300

The typical Madison price is $7,550, in line with the US typical of $7,500.

Where Madison sits among 195 US metrosNumber of metros at each typical general contractor price, per $50k project.

Madison's price band

Madison is pricier than 73% of the 195 US metros we price for general contractor work.

Hiring a general contractor in Madison costs $5,050–$10,050 on a $50,000 project, with most homeowners paying about $7,550, or 15.1% of the job. GCs here bill $50–$150 an hour for small jobs and consulting, a basement finish runs $22,500–$50,500, and a full second story $121,500–$302,000.

Madison is a smaller market. Construction supervisors in the Madison metro earn a median $93,290 a year in federal wage data, about 17% above the US median of $79,920. That pay gap sets the GC's overhead and the subs' bids, which is why a project here prices in line with the national typical.

Wisconsin licenses general contractors at the state level without a trade exam, so ask for the license number and proof of liability and workers' comp insurance. This is general information, not legal advice.

Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.

Quick answer

$5,050–$10,050 — typically $7,550 — is what a general contractor charges to run a $50,000 remodel in Madison, a 10.1–20.1% fee on top of labor and materials. A 400 sq ft addition runs $50,500–$100,500 all in, a mid-range kitchen $25,500–$65,500, and new construction $130–$250 a square foot. Verified November 2026. Get free Madison quotes →

  • GC fee on a $50,000 remodel: $5,050–$10,050 ($7,550 typical, 15.1%)
  • Hourly $50–$150; day rate $305–$505; construction manager $2,500–$7,550
  • Room addition, 400 sq ft: $50,500–$100,500; second story $121,500–$302,000
  • Kitchen $25,500–$65,500; bath $8,600–$24,000; basement finish $22,500–$50,500
  • New construction $130–$250 per sq ft; whole-house renovation $50,500–$201,500

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Detailed pricing — General contractor cost in Madison 2026

Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Madison metro, re-verified November 2026. Permits, engineering and change orders are their own rows.

ServiceLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$5,050per $50k project$7,550$10,050
General contractor fee on a $150,000 addition or major remodelper $150k project$15,150per $150k project$22,500$30,000
General contractor fee to build a $400,000 houseper $400k build$40,500per $400k build$60,500$80,500
General contractor hourly rate (consulting, small jobs)/hr$50/hr$75$150
General contractor day rate (working on your site)per day$305per day$405$505
Project management only (construction manager) on a $50,000 jobper $50k project$2,500per $50k project$5,050$7,550
Change order: a $5,000 mid-project change (markup plus admin fee)per change$5,550per change$6,050$7,050
Building permit and plans for a remodel or additionper project$1,700per project$4,550$9,600
Structural inspection and written reportper job$305per job$555$1,000
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,200per job$2,550$5,050
Remove a load-bearing wall and install a beam (single story)per job$3,050per job$7,100$15,100
Deck build, about 200 sq ft, run by a general contractorper project$4,550per project$8,100$15,100
Covered patio or porch addition, about 200 sq ftper project$8,100per project$16,200$30,000
Detached two-car garage, built from the slab upper project$20,000per project$30,500$50,500
Basement finish, about 1,000 sq ftper project$22,500per project$35,500$50,500
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$8,600per project$14,650$24,000
Kitchen remodel, mid-range, run by a general contractorper project$25,500per project$40,500$65,500
Home addition, building out, per sq ftper sq ft$100per sq ft$175$250
Room addition, 20 × 20 ft (400 sq ft), finishedper project$50,500per project$76,000$100,500
Full second-story additionper project$121,500per project$177,000$302,000
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$121,500per unit$182,000$302,000
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$50,500per project$116,500$201,500
New home construction, per sq ft (standard finish, no land)per sq ft$130per sq ft$165$250
Tear down and rebuild a 2,000 sq ft houseper project$253,000per project$354,000$554,000
Bigger general contractor jobs in Madison: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $354,000$253K–$554K
Full second-story addition $177,000$122K–$302K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $116,500$50.5K–$202K
Room addition, 20 × 20 ft (400 sq ft), finished $76,000$50.5K–$100K
Smaller general contractor jobs and repairs in MadisonPer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $40,500$25.5K–$65.5K
Basement finish, about 1,000 sq ft $35,500$22.5K–$50.5K
Detached two-car garage, built from the slab up $30,500$20K–$50.5K
Covered patio or porch addition, about 200 sq ft $16,200$8,100–$30K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $14,650$8,600–$24K
Deck build, about 200 sq ft, run by a general contractor $8,100$4,550–$15.1K
Building permit and plans for a remodel or addition $4,550$1,700–$9,600
Already got a quote?
Check it against these Madison prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors in Madison

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices cover the Madison metro. Outlying towns can run a little lower; tight lots and older houses in Downtown, State Street & the Isthmus and South Madison & Park Street sit at the top of each range.

How general contractor costs vary across Madison

General contractor prices across Madison

Same job, four price bands. Parking, permits and old buildings push Downtown, State Street & the Isthmus to the top; fees in UW campus & the Near West tend to come in at or under the city typical, and Sun Prairie, Middleton & the suburbs has the bigger additions and garages.

General contractor prices across MadisonTypical range by part of the metro, per $50k project. The line marks the Madison typical.
Downtown, State Street & the Isthmus8–15% above the city average $5,450–$11.6Kper $50k project
South Madison & Park StreetStandard to 8% above $5,200–$10.8Kper $50k project
UW campus & the Near West2–5% below $4,800–$9,850per $50k project
Sun Prairie, Middleton & the suburbsStandard; bigger additions and new builds $5,050–$10.4Kper $50k project

Downtown, State Street & the Isthmus

8–15% above the city average
Downtown, State Street, Williamson Street
Fee on a $50k job
$5,450–$11,550 per $50k project
400 sq ft addition
$54,500–$115,500 / 400 sq ft addition

Older buildings, tight lots and paid parking. Permits take longer, dumpsters need street permits, and condo or co-op boards add insurance and work-hour rules, so GC fees here run at the top of the city range.

South Madison & Park Street

Standard to 8% above
South Madison, Park Street, Allied Drive
Fee on a $50k job
$5,200–$10,850 per $50k project
400 sq ft addition
$52,000–$108,500 / 400 sq ft addition

Older homes being updated one project at a time. Expect fees a little above the city average, and ask how the GC handles permits for older wiring and plumbing that inspectors will want brought up to code.

UW campus & the Near West

2–5% below
UW-Madison, Near West, Monroe Street
Fee on a $50k job
$4,800–$9,850 per $50k project
400 sq ft addition
$48,000–$98,500 / 400 sq ft addition

Lots of rentals and houses split into units. Landlord-driven renovations and code-upgrade jobs keep GCs busy, and fees sit a little under the city average.

Sun Prairie, Middleton & the suburbs

Standard; bigger additions and new builds
Sun Prairie, Middleton, Fitchburg, Verona
Fee on a $50k job
$5,050–$10,450 per $50k project
400 sq ft addition
$50,500–$104,500 / 400 sq ft addition

Mostly single-family homes on bigger lots, so additions, second stories, garages and basement finishes are the common jobs. Easy access keeps fees near the city average, but the projects themselves are bigger.

What you'll actually pay — job by job

Real-World General Contractor Costs in Madison

Here's what common general contractor jobs cost in Madison in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.

GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks

$5,050–$7,550

The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Madison homeowners pay about $7,550 (15.1%) for that; a structural change or a co-op board pushes the fee toward $10,050.

Remove a load-bearing wall for an open kitchen — 3 to 5 days

$3,050–$15,100

A structural engineer sizes the beam ($305–$1,000 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $3,050–$15,100 in Madison for a single-story wall; a two-story wall or a hidden flush beam costs more.

400 sq ft room addition, finished — 3 to 5 months

$50,500–$100,500

Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $50,500–$100,500 all in, of which the GC's fee is about $11,400 at 15.1%. Permits and drawings ($1,700–$9,600) come first and take 4 to 12 weeks in most cities.

Detached two-car garage from the slab up — 4 to 8 weeks

$20,000–$50,500

Slab, framing, roof, siding, one overhead door and a basic electrical panel. $20,000–$50,500 in Madison; finishing the inside, a second story or an ADU conversion is a different project.

Whole-house renovation of a 2,000 sq ft home — 4 to 8 months

$50,500–$201,500

Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $50,500–$201,500 in Madison, GC fee included; a full gut to the studs runs $121,500–$303,500.

How much does a general contractor cost in Madison?

Between $5,050 and $10,050 on a $50,000 remodel, and $7,550 is the fee most Madison homeowners pay. The fee is 10.1% to 20.1% of the project and it buys the GC's time: bidding, hiring and scheduling the subs, pulling permits, meeting inspectors and carrying the insurance and the warranty.

The fee scales with the job: $15,150–$30,000 on a $150,000 addition and $40,500–$80,500 to build a $400,000 house. Whole projects, GC included, run $50,500–$100,500 for a 400 sq ft addition and $50,500–$201,500 for a 2,000 sq ft whole-house renovation. Prices re-checked against 23 sources in November 2026.

General contractor prices in Madison (2026): fees, remodels, additions and new builds

The GC's fee on a $50,000 remodel is $5,050–$10,050, a 400 sq ft addition $50,500–$100,500, and new construction $130–$250 a square foot.

Line on the quoteLowTypicalHigh
GC fee on a $50,000 remodel$5,050$7,550$10,050
GC fee on a $150,000 addition$15,150$22,500$30,000
GC hourly rate$50$75$150
Kitchen remodel, mid-range$25,500$40,500$65,500
Room addition, 400 sq ft$50,500$76,000$100,500
Full second-story addition$121,500$177,000$302,000
Whole-house renovation, 2,000 sq ft$50,500$116,500$201,500
New home construction, per sq ft$130$165$250

Percentage or lump sum, the money is the same in Madison: $7,550 on a $50,000 job is a 15.1% fee. Ask for the fee as a number and as a percentage, and ask what it covers; a bid that hides the fee inside the sub prices is harder to compare.

What moves a general contractor's quote in Madison:

  • Project size and complexity — the fee is 10.1–20.1% of the job, so $5,050–$10,050 on $50,000 and $15,150–$30,000 on $150,000. Structural work, tight sites and many subs push the percentage up.
  • Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,550 typical on a $50,000 scope.
  • Permits and drawings — $1,700–$9,600 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
  • Change orders — a $5,000 mid-project change costs $5,550–$7,050 once markup and an admin fee are added. Lock the design before you sign.
  • The age of the house — once walls are open, inspectors in Madison can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.

Ask every Madison general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →

General Contractor Cost in Madison by Project Size

Quick answer

$50,000 remodel: GC fee $5,050–$10,050. $150,000 addition: $15,150–$30,000. $400,000 new house: $40,500–$80,500. The whole project, GC included, runs $50,500–$100,500 for a 400 sq ft addition, $121,500–$302,000 for a full second story and $253,000–$554,000 to tear down and rebuild 2,000 sq ft.

Worked example: a Madison 400 sq ft room addition at $76,000 typical. The GC's 15.1% is about $11,400; permits and drawings add $4,550; a structural engineer's report $555. Carry a 10% contingency ($7,600) for what the crew finds under the siding, and the realistic budget is about $88,705.

Going up costs more than going out. A full second story is $177,000 typical against $76,000 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $100–$250 and building up $200–$505.

Madison General Contractor Costs by Contract and Job Type

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$5,050–$10,050 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 15.1% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$5,050–$10,050 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,500–$7,550 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$50–$150/hrSmall jobs, repairs and consulting, or $305–$505 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$8,600–$24,000 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$25,500–$65,500 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$22,500–$50,500 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$50,500–$100,500 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $100–$250 a square foot.
Full second-story addition (building up)$121,500–$302,000 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$50,500–$201,500 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$20,000–$50,500 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$121,500–$302,000 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$260,000–$500,000 per projectThe GC is the builder, at $130–$250 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$3,050–$15,100 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job type in MadisonTypical range, per project.
Bathroom remodel, mid-range (GC-run) $8,600–$24Kper project
Kitchen remodel, mid-range (GC-run) $25.5K–$65.5Kper project
Basement finish, 1,000 sq ft $22.5K–$50.5Kper project
Room addition, 400 sq ft (building out) $50.5K–$100Kper project
Full second-story addition (building up) $122K–$302Kper project
Whole-house renovation, 2,000 sq ft $50.5K–$202Kper project
Detached two-car garage $20K–$50.5Kper project
Detached ADU, 600 sq ft turnkey $122K–$302Kper project
New home, 2,000 sq ft (construction only) $260K–$500Kper project
Structural work: remove a bearing wall $3,050–$15.1Kper project
Madison tip: tie payments to milestones (foundation, framing, rough-in, finish), not to dates, and never pay more than 20% up front.

The fee vs. the project — what a Madison general contractor bill really covers

On a $50,000 remodel in Madison, the general contractor keeps about $7,550 — the 15.1% fee. The other $42,450 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.

The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,500–$7,550 and saves about $2,500 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.

What's included in a Madison general contractor quote (and what costs extra)

A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:

  • Permits and drawings — $1,700–$9,600 for a remodel or addition, often billed as a pass-through
  • Engineering — $305–$1,000 for a structural report on any bearing wall or addition
  • Change orders — $5,550–$7,050 on a $5,000 change once markup and admin fees are added
  • Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup

Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.

What Affects General Contractor Costs in Madison

Project size

The fee scales with the job: $5,050–$10,050 on $50,000, $15,150–$30,000 on $150,000, $40,500–$80,500 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.

Contract type

Cost-plus states the fee (10.1–20.1% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $50–$150 an hour plus costs and suits small or open-ended jobs.

Structural work and permits

Anything that needs a structural engineer's report ($305–$1,000) and a building permit ($1,700–$9,600 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $3,050–$15,100 in Madison.

Change orders

A $5,000 change mid-project costs $5,550–$7,050 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.

Local rules and licensing

Wisconsin licenses general contractors at the state level without a trade exam, so ask for the license number and proof of liability and workers' comp insurance.

Labor rates in Madison

Construction supervisors in the Madison metro earn a median $93,290 a year in federal wage data, about 17% above the US median. Labor is 40% to 60% of a remodel or addition, so Madison projects land in line with the US typical.

Season and schedule

Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Madison GCs sharpen their fee to keep crews working.

How to Save Money on a General Contractor in Madison
  1. Lock the design and finishes before you sign.Every change after the contract costs $5,550–$7,050 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
  2. Get three itemized bids on the same drawings.Two Madison bids can differ by $2,500 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
  3. Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($50,500–$201,500) costs less per room than the rooms done one at a time.
  4. Keep the footprint and the roofline.Building out costs $100–$250 a square foot; building up costs about twice that ($121,500–$302,000 for a full second story). A bump-out or a basement finish ($22,500–$50,500) is cheaper than either.
  5. Ask about an off-season start.Interior work in winter is slower for most Madison GCs, and a start date in January or February can bring the fee down a point or two.
  6. Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
General Contractor Cost in Madison: What the Quote Should Include

Madison general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit and who meets the inspector
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, the warranty on the work, and lien releases from subs at each payment
Frequently asked questions — General contractor cost in Madison
How much does a general contractor cost in Madison?

$5,050–$10,050 (typically $7,550 here) to run a $50,000 remodel — a fee of 10.1% to 20.1% on top of labor and materials. On a $150,000 addition the fee is $15,150–$30,000.

What percentage do general contractors charge in Madison?

About 10.1% to 20.1% of the project cost, 15.1% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.

How much do general contractors charge per hour in Madison?

$50–$150 an hour for consulting and small jobs, or $305–$505 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost in Madison?

$50,500–$100,500 for a finished 400 sq ft room addition, about $100–$250 a square foot building out. A full second story runs $121,500–$302,000.

How much does it cost to build a house in Madison?

About $130–$250 a square foot for construction at a standard finish, so $260,000–$500,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $253,000–$554,000.

How much does a whole-house renovation cost in Madison?

$50,500–$201,500 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.

Do I need a licensed general contractor in Wisconsin?

Wisconsin licenses general contractors at the state level without a trade exam, so ask for the license number and proof of liability and workers' comp insurance.

Is cost-plus or a fixed price better?

Cost-plus shows the fee (10.1–20.1% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,550.

How much should I pay a general contractor up front?

No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.

What's included in a Madison general contractor quote?

The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,700–$9,600), engineering ($305–$1,000), change orders ($5,550–$7,050 on a $5,000 change) and anything above an allowance.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices for the Madison metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read our full methodology →

Get a fair general contractor quote in Madison

Local general contractors · Free quotes · No obligation, no spam.

Get quotes in Madison →Max 2 general contractors will contact you
Get quotes in MadisonMax 2 general contractors · free · no spam→