How much does a general contractor cost in Spokane?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched11 min read
General contractor cost

General contractor costs in Spokane

Spokane, WAChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Spokane, WA
$5,050–$10,050per $50k project

Most general contractors in Spokane charge $5,050–$10,050 to run a $50,000 remodel that is a fee of about 10.1% to 20.1% on top of labor and materials, with $7,550 (15.1%) the typical bill. A 400 sq ft addition runs $50,500–$100,500 all in; a mid-range kitchen $25,000–$65,500.

How we get this data
Typical
$7,550
Low end
$4,050
High end
$12,600
Fee on a $50,000 remodel
$5,050–$10,050
Room addition, 400 sq ft
$50,500–$100,500
Kitchen remodel, mid-range
$25,000–$65,500
New build, per sq ft
$130–$250

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local general contractors send you a real quote. Free, no obligation.

Get my fair quote →
Typical general contractor price: Spokane vs nearby citiesTypical price, per $50k project. The line marks the US typical.
Seattle, WA $8,600
Tacoma, WA $8,250
Portland, OR $8,200
Salem, OR $7,700
Spokane, WAThis guide $7,550
Boise, ID $7,200
Missoula, MT $7,150

The typical Spokane price is $7,550, in line with the US typical of $7,500.

Where Spokane sits among 195 US metrosNumber of metros at each typical general contractor price, per $50k project.

Spokane's price band

Spokane is pricier than 73% of the 195 US metros we price for general contractor work.

A general contractor in Spokane charges $5,050–$10,050 to run a $50,000 remodel, which is a fee of 10.1% to 20.1% on top of the labor and materials, and $7,550 (15.1%) is typical. On a $150,000 addition the fee is $15,150–$30,000. A 400 sq ft room addition costs $50,500–$100,500 all in, and a mid-range kitchen $25,000–$65,500.

As a smaller market, Spokane prices a GC's fee in line with the US typical of $7,500 on a $50,000 job. Local pay drives it: construction supervisors in the Spokane-Spokane Valley metro earn a median $92,780 a year (about 16% above the US median), and the same wage pressure runs through every sub on the project.

Washington registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance. This is general information, not legal advice.

Comparing cities, or after the US-wide picture? See the national guide: General contractor cost in the USA.

Quick answer

$5,050–$10,050 — typically $7,550 — is what a general contractor charges to run a $50,000 remodel in Spokane, a 10.1–20.1% fee on top of labor and materials. A 400 sq ft addition runs $50,500–$100,500 all in, a mid-range kitchen $25,000–$65,500, and new construction $130–$250 a square foot. Verified November 2026. Get free Spokane quotes →

  • GC fee on a $50,000 remodel: $5,050–$10,050 ($7,550 typical, 15.1%)
  • Hourly $50–$150; day rate $305–$505; construction manager $2,500–$7,550
  • Room addition, 400 sq ft: $50,500–$100,500; second story $121,000–$301,500
  • Kitchen $25,000–$65,500; bath $8,600–$24,000; basement finish $22,000–$50,500
  • New construction $130–$250 per sq ft; whole-house renovation $50,500–$201,000

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Detailed pricing — General contractor cost in Spokane 2026

Fee rows are the GC's charge on a project of that size; project rows are the whole job with the GC's fee included. Spokane metro, re-verified November 2026. Permits, engineering and change orders are their own rows.

ServiceLowTypicalHigh
General contractor fee on a $50,000 remodel (10–20% of the project)per $50k project$5,050per $50k project$7,550$10,050
General contractor fee on a $150,000 addition or major remodelper $150k project$15,150per $150k project$22,500$30,000
General contractor fee to build a $400,000 houseper $400k build$40,500per $400k build$60,500$80,500
General contractor hourly rate (consulting, small jobs)/hr$50/hr$75$150
General contractor day rate (working on your site)per day$305per day$405$505
Project management only (construction manager) on a $50,000 jobper $50k project$2,500per $50k project$5,050$7,550
Change order: a $5,000 mid-project change (markup plus admin fee)per change$5,550per change$6,050$7,050
Building permit and plans for a remodel or additionper project$1,700per project$4,550$9,550
Structural inspection and written reportper job$305per job$555$1,000
Minor structural repair (header or lintel, crack stitching, wall ties)per job$1,200per job$2,550$5,050
Remove a load-bearing wall and install a beam (single story)per job$3,050per job$7,050$15,100
Deck build, about 200 sq ft, run by a general contractorper project$4,550per project$8,100$15,100
Covered patio or porch addition, about 200 sq ftper project$8,100per project$16,150$30,000
Detached two-car garage, built from the slab upper project$20,000per project$30,500$50,500
Basement finish, about 1,000 sq ftper project$22,000per project$35,500$50,500
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractorper project$8,600per project$14,650$24,000
Kitchen remodel, mid-range, run by a general contractorper project$25,000per project$40,500$65,500
Home addition, building out, per sq ftper sq ft$100per sq ft$175$250
Room addition, 20 × 20 ft (400 sq ft), finishedper project$50,500per project$75,500$100,500
Full second-story additionper project$121,000per project$176,500$301,500
Detached ADU, 600 sq ft one-bedroom, turnkeyper unit$121,000per unit$181,500$301,500
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems)per project$50,500per project$116,000$201,000
New home construction, per sq ft (standard finish, no land)per sq ft$130per sq ft$165$250
Tear down and rebuild a 2,000 sq ft houseper project$252,500per project$353,500$553,000
Bigger general contractor jobs in Spokane: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Tear down and rebuild a 2,000 sq ft house $353,500$252K–$553K
Full second-story addition $176,500$121K–$302K
Whole-house renovation, 2,000 sq ft (kitchen, baths, floors, paint, systems) $116,000$50.5K–$201K
Room addition, 20 × 20 ft (400 sq ft), finished $75,500$50.5K–$100K
Smaller general contractor jobs and repairs in SpokanePer project, low to high with the typical price marked. Every line is in the table above.
Kitchen remodel, mid-range, run by a general contractor $40,500$25K–$65.5K
Basement finish, about 1,000 sq ft $35,500$22K–$50.5K
Detached two-car garage, built from the slab up $30,500$20K–$50.5K
Covered patio or porch addition, about 200 sq ft $16,150$8,100–$30K
Bathroom remodel, mid-range 5 × 8 ft, run by a general contractor $14,650$8,600–$24K
Deck build, about 200 sq ft, run by a general contractor $8,100$4,550–$15.1K
Building permit and plans for a remodel or addition $4,550$1,700–$9,550
Already got a quote?
Check it against these Spokane prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local general contractors in Spokane

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning to build or remodel?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices cover the Spokane metro. Outlying towns can run a little lower; tight lots and older houses in Downtown, Browne's Addition & Garland and East Central & Hillyard sit at the top of each range.

How general contractor costs vary across Spokane

General contractor prices across Spokane

Where you live changes the GC's overhead, not the price of lumber. Tight lots and older houses in Downtown, Browne's Addition & Garland take the longest; fees in South Hill & Gonzaga tend to come in at or under the city typical.

General contractor prices across SpokaneTypical range by part of the metro, per $50k project. The line marks the Spokane typical.
Downtown, Browne's Addition & Garland8–15% above the city average $5,450–$11.6Kper $50k project
East Central & HillyardStandard to 8% above $5,200–$10.8Kper $50k project
South Hill & Gonzaga2–5% below $4,800–$9,850per $50k project
Spokane Valley & Coeur d'Alene IDStandard; bigger additions and new builds $5,050–$10.4Kper $50k project

Downtown, Browne's Addition & Garland

8–15% above the city average
Downtown, Browne's Addition, Garland District
Fee on a $50k job
$5,450–$11,550 per $50k project
400 sq ft addition
$54,500–$115,500 / 400 sq ft addition

Dense blocks with a lot of older housing, so structural surprises (undersized framing, old wiring, plaster) are common. Carry a bigger contingency and expect fees near the top of the range.

East Central & Hillyard

Standard to 8% above
East Central, Hillyard, Logan
Fee on a $50k job
$5,200–$10,850 per $50k project
400 sq ft addition
$52,000–$108,500 / 400 sq ft addition

Lots of fix-and-flip and whole-house renovations. Bids vary widely; get three, and compare the allowances and exclusions line by line, not the bottom line.

South Hill & Gonzaga

2–5% below
South Hill, Gonzaga, Perry District
Fee on a $50k job
$4,800–$9,850 per $50k project
400 sq ft addition
$48,000–$98,500 / 400 sq ft addition

Older housing near campus, much of it rented. Many GCs here quote flat prices for standard unit refreshes, which keeps fees down.

Spokane Valley & Coeur d'Alene ID

Standard; bigger additions and new builds
Spokane Valley, Cheney, Coeur d'Alene ID
Fee on a $50k job
$5,050–$10,450 per $50k project
400 sq ft addition
$50,500–$104,500 / 400 sq ft addition

Mostly single-family homes on bigger lots, so additions, second stories, garages and basement finishes are the common jobs. Easy access keeps fees near the city average, but the projects themselves are bigger.

What you'll actually pay — job by job

Real-World General Contractor Costs in Spokane

Here's what common general contractor jobs cost in Spokane in 2026, the GC's fee on a $50,000 remodel; subs and materials are the other $42,500 or so.

GC fee on a $50,000 kitchen-and-bath remodel — 6 to 10 weeks

$5,050–$7,550

The GC bids the job, lines up the demo crew, plumber, electrician, tile setter and painter, pulls the permit and meets the inspector. Most Spokane homeowners pay about $7,550 (15.1%) for that; a structural change or a co-op board pushes the fee toward $10,050.

Remove a load-bearing wall for an open kitchen — 3 to 5 days

$3,050–$15,100

A structural engineer sizes the beam ($305–$1,000 for the report), the GC shores the ceiling, cuts the wall, sets the beam and patches the floor and ceiling. $3,050–$15,100 in Spokane for a single-story wall; a two-story wall or a hidden flush beam costs more.

400 sq ft room addition, finished — 3 to 5 months

$50,500–$100,500

Foundation, framing, roof tie-in, windows, electrical, HVAC extension, drywall, flooring and paint. $50,500–$100,500 all in, of which the GC's fee is about $11,350 at 15.1%. Permits and drawings ($1,700–$9,550) come first and take 4 to 12 weeks in most cities.

Detached two-car garage from the slab up — 4 to 8 weeks

$20,000–$50,500

Slab, framing, roof, siding, one overhead door and a basic electrical panel. $20,000–$50,500 in Spokane; finishing the inside, a second story or an ADU conversion is a different project.

Whole-house renovation of a 2,000 sq ft home — 4 to 8 months

$50,500–$201,000

Kitchen, two baths, floors, paint, and the electrical and plumbing the inspector insists on once walls are open. $50,500–$201,000 in Spokane, GC fee included; a full gut to the studs runs $121,000–$303,000.

How much does a general contractor cost in Spokane?

A general contractor's fee in Spokane runs $5,050 to $10,050 on a $50,000 project. The middle of the market, about $7,550, covers one point of contact for the whole job, a written schedule, and someone who is on the hook when a sub does not show. Pay it as a percentage (cost-plus) or folded into a fixed bid.

Change orders are where the fee grows: a $5,000 mid-project change costs $5,550–$7,050 once the GC's markup and admin fee are added. Permits and drawings for an addition run $1,700–$9,550 before anyone picks up a hammer. Figures re-checked against 23 sources in November 2026.

General contractor prices in Spokane (2026): fees, remodels, additions and new builds

The GC's fee on a $50,000 remodel is $5,050–$10,050, a 400 sq ft addition $50,500–$100,500, and new construction $130–$250 a square foot.

Line on the quoteLowTypicalHigh
GC fee on a $50,000 remodel$5,050$7,550$10,050
GC fee on a $150,000 addition$15,150$22,500$30,000
GC hourly rate$50$75$150
Kitchen remodel, mid-range$25,000$40,500$65,500
Room addition, 400 sq ft$50,500$75,500$100,500
Full second-story addition$121,000$176,500$301,500
Whole-house renovation, 2,000 sq ft$50,500$116,000$201,000
New home construction, per sq ft$130$165$250

The fee is the small part of the bill. On a $75,500 addition the GC keeps about $11,350; the rest goes to the subs, the lumber yard, the permit office and the dumpster company. Cutting the GC saves the fee and hands you everything else.

What moves a general contractor's quote in Spokane:

  • Project size and complexity — the fee is 10.1–20.1% of the job, so $5,050–$10,050 on $50,000 and $15,150–$30,000 on $150,000. Structural work, tight sites and many subs push the percentage up.
  • Contract type — cost-plus shows the fee; a fixed bid buries it and adds a cushion for risk. Either way, expect $7,550 typical on a $50,000 scope.
  • Permits and drawings — $1,700–$9,550 for a remodel or addition before work starts, and 4 to 12 weeks of waiting in most cities.
  • Change orders — a $5,000 mid-project change costs $5,550–$7,050 once markup and an admin fee are added. Lock the design before you sign.
  • The age of the house — once walls are open, inspectors in Spokane can require wiring, plumbing and framing brought up to code. Carry a 10–20% contingency on anything built before 1980.

Ask every Spokane general contractor the same five things: the fee as a percentage and a dollar figure, what allowances are in the bid, who pulls the permit, how change orders are priced, and the payment schedule tied to milestones. Compare those, not the headline price. Get a quote for your project →

General Contractor Cost in Spokane by Project Size

Quick answer

$50,000 remodel: GC fee $5,050–$10,050. $150,000 addition: $15,150–$30,000. $400,000 new house: $40,500–$80,500. The whole project, GC included, runs $50,500–$100,500 for a 400 sq ft addition, $121,000–$301,500 for a full second story and $252,500–$553,000 to tear down and rebuild 2,000 sq ft.

Worked example: a Spokane 400 sq ft room addition at $75,500 typical. The GC's 15.1% is about $11,350; permits and drawings add $4,550; a structural engineer's report $555. Carry a 10% contingency ($7,550) for what the crew finds under the siding, and the realistic budget is about $88,155.

Going up costs more than going out. A full second story is $176,500 typical against $75,500 for a 400 sq ft addition on the ground, because the roof comes off, the first floor is shored and you live elsewhere for months. Per square foot, building out is $100–$250 and building up $200–$505.

Spokane General Contractor Costs by Contract and Job Type

Contract or job typeCostBest for
Cost-plus GC (fee as a percentage)$5,050–$10,050 fee on a $50,000 jobYou pay the real cost of labor and materials plus the GC's fee, about 15.1% here. Fair when the scope is still moving; set a not-to-exceed cap.
Fixed-price (lump sum) GC bid$5,050–$10,050 fee inside a $50,000 jobOne price for the whole job with the fee and a risk cushion folded in. Best when drawings and finishes are locked and three GCs bid the same plans.
Construction manager (project management only)$2,500–$7,550 fee on a $50,000 jobYou hire the subs; the manager schedules and inspects. About half a GC's fee, but the contracts and the risk stay with you.
Hourly or day rate$50–$150/hrSmall jobs, repairs and consulting, or $305–$505 a day for a GC working on site. Project work is quoted as a price instead.
Bathroom remodel, mid-range (GC-run)$8,600–$24,000 per projectThe most common GC job. The GC's share is the same 10–20%; the rest is the plumber, tile setter, fixtures and finishes.
Kitchen remodel, mid-range (GC-run)$25,000–$65,500 per projectCabinets, counters, floors, lighting and the trades to fit them. Layout changes and moved plumbing push it to the top.
Basement finish, 1,000 sq ft$22,000–$50,500 per projectThe cheapest way to add living space: the shell exists. A bathroom, egress window or wet bar adds to it.
Room addition, 400 sq ft (building out)$50,500–$100,500 per projectNew footprint on the lot: foundation, framing, roof tie-in, systems and finishes at $100–$250 a square foot.
Full second-story addition (building up)$121,000–$301,500 per projectRoof off, new floor on. About twice the cost per square foot of building out, and you usually move out for months.
Whole-house renovation, 2,000 sq ft$50,500–$201,000 per projectKitchen, baths, floors, paint and systems in one contract. Cheaper per room than doing them one at a time.
Detached two-car garage$20,000–$50,500 per projectA shell on a slab with a door and basic power. Finishing the inside or adding a room above is a different project.
Detached ADU, 600 sq ft turnkey$121,000–$301,500 per projectA small house with a kitchen and bath, plus its own utility connections and permits. Rentable where zoning allows.
New home, 2,000 sq ft (construction only)$260,000–$500,000 per projectThe GC is the builder, at $130–$250 a square foot. Land, design, permits and utility hookups sit on top.
Structural work: remove a bearing wall$3,050–$15,100 per projectJobs that need a structural engineer's report and a permit. The GC coordinates the engineering, the framer and the inspector.
Cost by contract or job type in SpokaneTypical range, per project.
Bathroom remodel, mid-range (GC-run) $8,600–$24Kper project
Kitchen remodel, mid-range (GC-run) $25K–$65.5Kper project
Basement finish, 1,000 sq ft $22K–$50.5Kper project
Room addition, 400 sq ft (building out) $50.5K–$100Kper project
Full second-story addition (building up) $121K–$302Kper project
Whole-house renovation, 2,000 sq ft $50.5K–$201Kper project
Detached two-car garage $20K–$50.5Kper project
Detached ADU, 600 sq ft turnkey $121K–$302Kper project
New home, 2,000 sq ft (construction only) $260K–$500Kper project
Structural work: remove a bearing wall $3,050–$15.1Kper project
Spokane tip: ask for the fee as a dollar figure and a percentage. $7,550 on a $50,000 job is 15.1%; a bid that will not show the fee is a bid you cannot compare.

The fee vs. the project — what a Spokane general contractor bill really covers

On a $50,000 remodel in Spokane, the general contractor keeps about $7,550 — the 15.1% fee. The other $42,450 pays the demo crew, plumber, electrician, framer, drywaller, tile setter and painter, the materials, the dumpster and the permit. A GC who bids the whole job at $50,000 fixed price is carrying that same fee inside the number.

The fee is what you pay for one person to own the schedule, the subs and the problems. Owner-managing the same job with a construction manager costs $2,500–$7,550 and saves about $2,500 at the typical price, but every late sub, failed inspection and material shortage becomes your afternoon off work.

What's included in a Spokane general contractor quote (and what costs extra)

A GC's fee covers bidding and hiring the subs, scheduling, supervision, permit coordination, insurance and the warranty on the work. The headline bid often leaves out:

  • Permits and drawings — $1,700–$9,550 for a remodel or addition, often billed as a pass-through
  • Engineering — $305–$1,000 for a structural report on any bearing wall or addition
  • Change orders — $5,550–$7,050 on a $5,000 change once markup and admin fees are added
  • Allowance overruns — finishes above the allowance in the bid, plus the GC's 7.5–20% materials markup

Ask for the fee, the allowances, the exclusions and the payment schedule in writing, and for proof of liability insurance and workers' comp.

What Affects General Contractor Costs in Spokane

Project size

The fee scales with the job: $5,050–$10,050 on $50,000, $15,150–$30,000 on $150,000, $40,500–$80,500 on a $400,000 house. The percentage is roughly constant, so a bigger project is a bigger fee in dollars.

Contract type

Cost-plus states the fee (10.1–20.1% here). A fixed-price bid folds it in and adds a cushion for things that might go wrong. Time-and-materials bills $50–$150 an hour plus costs and suits small or open-ended jobs.

Structural work and permits

Anything that needs a structural engineer's report ($305–$1,000) and a building permit ($1,700–$9,550 with drawings) adds coordination the GC charges for. Removing a bearing wall runs $3,050–$15,100 in Spokane.

Change orders

A $5,000 change mid-project costs $5,550–$7,050 once the GC's markup and admin fee are added. Finishes chosen after the contract is signed are the most common cause.

Local rules and licensing

Washington registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance.

Labor rates in Spokane

Construction supervisors in the Spokane-Spokane Valley metro earn a median $92,780 a year in federal wage data, about 16% above the US median. Labor is 40% to 60% of a remodel or addition, so Spokane projects land in line with the US typical.

Season and schedule

Spring and summer are the busy months for additions, garages and anything with a foundation, so bids run higher and start dates slip. Interior remodels fill the winter, when some Spokane GCs sharpen their fee to keep crews working.

How to Save Money on a General Contractor in Spokane
  1. Lock the design and finishes before you sign.Every change after the contract costs $5,550–$7,050 on a $5,000 item once the markup and admin fee land. Pick the tile, the fixtures and the cabinets first.
  2. Get three itemized bids on the same drawings.Two Spokane bids can differ by $2,500 in fee alone on a $50,000 job. Make all three price the same plans, with allowances and exclusions listed.
  3. Bundle projects into one contract.A kitchen and a bath under one GC share one mobilization, one permit visit and one fee negotiation. A 2,000 sq ft whole-house renovation ($50,500–$201,000) costs less per room than the rooms done one at a time.
  4. Keep the footprint and the roofline.Building out costs $100–$250 a square foot; building up costs about twice that ($121,000–$301,500 for a full second story). A bump-out or a basement finish ($22,000–$50,500) is cheaper than either.
  5. Ask about an off-season start.Interior work in winter is slower for most Spokane GCs, and a start date in January or February can bring the fee down a point or two.
  6. Check the license, insurance and references before the deposit.A deposit above 20% is a warning sign, and an uninsured GC is a risk you carry. The checks are free; a bad GC costs the whole budget.
General Contractor Cost in Spokane: What the Quote Should Include

Spokane general contractors quote cost-plus, fixed-price or time-and-materials. Before you pay a deposit, get these in writing:

  • The GC's fee as a percentage and a dollar figure, and what it covers
  • Every allowance (cabinets, tile, fixtures, flooring) with its dollar amount
  • Exclusions: permits, engineering, dumpster, utility connections, landscaping
  • How change orders are priced: markup percentage and any admin fee
  • Who pulls the permit and who meets the inspector
  • A payment schedule tied to milestones, with the deposit capped
  • The license or registration number where your state has one, plus liability and workers' comp certificates
  • Start and finish dates, the warranty on the work, and lien releases from subs at each payment
Frequently asked questions — General contractor cost in Spokane
How much does a general contractor cost in Spokane?

$5,050–$10,050 (typically $7,550 here) to run a $50,000 remodel — a fee of 10.1% to 20.1% on top of labor and materials. On a $150,000 addition the fee is $15,150–$30,000.

What percentage do general contractors charge in Spokane?

About 10.1% to 20.1% of the project cost, 15.1% typical, whether it is shown as a cost-plus fee or folded into a fixed bid. Small or complex jobs run toward the top; large simple ones toward the bottom.

How much do general contractors charge per hour in Spokane?

$50–$150 an hour for consulting and small jobs, or $305–$505 a day for a GC working on your site. Remodels, additions and new builds are quoted as a project price instead.

How much does a home addition cost in Spokane?

$50,500–$100,500 for a finished 400 sq ft room addition, about $100–$250 a square foot building out. A full second story runs $121,000–$301,500.

How much does it cost to build a house in Spokane?

About $130–$250 a square foot for construction at a standard finish, so $260,000–$500,000 for a 2,000 sq ft house before land, design and utility connections. Tearing down an old house and rebuilding 2,000 sq ft is $252,500–$553,000.

How much does a whole-house renovation cost in Spokane?

$50,500–$201,000 for a 2,000 sq ft home: kitchen, baths, floors, paint and the systems work the inspector requires, GC fee included. A full gut to the studs costs more.

Do I need a licensed general contractor in Washington?

Washington registers contractors rather than testing them, so ask for the registration number, the bond on file and proof of liability and workers' comp insurance.

Is cost-plus or a fixed price better?

Cost-plus shows the fee (10.1–20.1% here) and suits a scope that is still moving; cap it with a not-to-exceed figure. A fixed price suits locked drawings and finishes; the GC carries the risk and prices a cushion for it. Either way the fee on a $50,000 job is about $7,550.

How much should I pay a general contractor up front?

No more than 10–20% as a deposit, then payments tied to milestones. Some states cap it: California limits the deposit to 10% or $1,000, whichever is less. A GC asking for half up front is a warning sign.

What's included in a Spokane general contractor quote?

The fee, the subs' labor, the materials in the allowances and the dumpster. Often extra: permits and drawings ($1,700–$9,550), engineering ($305–$1,000), change orders ($5,550–$7,050 on a $5,000 change) and anything above an allowance.

Prices verified November 2026 · Cross-referenced against 23+ American pricing sources · See methodology

Prices for the Spokane metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, builder-platform data, the NAHB construction cost survey, dated city price pages, licensing boards and federal wage data. No contractor can pay to change them, so always get three bids. Last reviewed November 2026. Read our full methodology →

Get a fair general contractor quote in Spokane