How much does a bathroom remodel cost in Nashville?
By Our research team · Last verified · Methodology
Most bathroom remodels in Nashville cost $8,600–$24,300 including demolition, tile, fixtures and labor. $14,700 is the usual price; a budget version is $5,550–$12,100 and an upscale one $25,200–$60,500.
How we get this data- Typical
- $14,700
- Low end
- $5,050
- High end
- $40,500
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical Nashville price is $14,700, in line with the US typical of $14,500.
Nashville's price band
Nashville is pricier than 71% of the 195 US metros we price for bathroom remodel work.
Expect $2,500–$12,100 to convert a tub to a walk-in shower in Nashville, $5,550–$16,100 for a custom tiled shower, $805–$4,000 for a new vanity installed and $355–$1,000 for a toilet. A full mid-range remodel of a 5×8 bath is $8,600–$24,300.
HomeGuide's Nashville figure for a bathroom update is $6,600–$21,000. Construction supervisors in metro Nashville earn a median $78,830 (BLS, May 2025), right at the US figure, so prices here track the national table closely.
Prices on this page include demolition, disposal, materials, labor and cleanup unless the row says otherwise. Permits ($150–$1,500) and design fees are usually extra, and a Nashville contractor should list them on the quote.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$8,600–$24,300 for a mid-range remodel of a 5×8 bathroom in Nashville, labor and materials — typically $14,700. A half bath runs $2,550–$12,100, a primary bath $18,200–$50,500, and a tub-to-shower conversion $2,500–$12,100. Verified November 2026. Get free Nashville quotes →
- Mid-range 5×8 full bath remodel: $8,600–$24,300 ($14,700 typical)
- Half bath $2,550–$12,100; primary bath $18,200–$50,500
- Tub-to-shower conversion $2,500–$12,100; tiled walk-in shower $5,550–$16,100
- Vanity installed $805–$4,000; toilet $355–$1,000; permits $150–$1,500
- Priciest area to remodel in: the city center; lowest quotes: Antioch, Madison & the suburbs
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Nashville metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $8,600per project | $14,700 | $24,300 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $5,550per project | $8,600 | $12,100 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $25,200per project | $38,300 | $60,500 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $50,300per project | $80,600 | $120,800 |
| Half bath (powder room) remodelper project | $2,550per project | $6,050 | $12,100 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $6,050per project | $10,100 | $16,200 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $18,200per project | $29,300 | $50,500 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $120per sq ft | $255 | $405 |
| Demolition to studs and debris disposalper project | $705per project | $1,400 | $2,550 |
| Plumbing rough-in or moving one fixtureper fixture | $810per fixture | $2,000 | $5,050 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $505per project | $1,200 | $2,550 |
| Shower waterproofing (membrane or pan liner)per shower | $605per shower | $1,200 | $2,500 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $12per sq ft | $22 | $40 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $805installed | $1,800 | $4,000 |
| Toilet, installed (mid-range two-piece)installed | $355installed | $605 | $1,000 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,500installed | $3,000 | $6,050 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $3,000installed | $6,050 | $10,100 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,500installed | $3,200 | $6,050 |
| Custom tiled walk-in shower, installedinstalled | $5,550installed | $9,600 | $16,100 |
| Tub-to-shower conversionper project | $2,500per project | $5,550 | $12,100 |
| Frameless glass shower door, installedinstalled | $905installed | $1,500 | $2,800 |
| Heated towel rack, hardwired, installedinstalled | $350installed | $705 | $1,200 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $705per project | $1,300 | $2,500 |
| Permits: building, plumbing and electricalper project | $150per project | $505 | $1,500 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in Nashville
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices cover the Nashville metro. Outlying towns can run 5–10% lower; condos and older homes in the city center sit at the top of each range.
Bathroom remodel prices across Nashville
Same tile, four price bands. Parking, building rules and old plumbing push the city center to the top; Antioch, Madison & the suburbs sits at or below the city typical.
Music Row & Midtown
- Full remodel (5×8)
- $9,300–$27,900 per project
- Tub-to-shower
- $2,700–$13,900 / tub-to-shower conversion
Condos, apartments and older buildings: elevator bookings, building rules, parking and tight stairwells all add crew time. Older plumbing stacks here often need work once the walls are open.
East Nashville
- Full remodel (5×8)
- $8,750–$25,800 per project
- Tub-to-shower
- $2,550–$12,800 / tub-to-shower conversion
Renovated older homes next to new builds. Pricing sits near the city typical; the extras come from what's behind the old tile.
Berry Hill & Wedgewood-Houston
- Full remodel (5×8)
- $8,600–$24,300 per project
- Tub-to-shower
- $2,500–$12,100 / tub-to-shower conversion
Mostly post-war houses with one or two full baths. Quotes cluster around the city typical.
Antioch, Madison & the suburbs
- Full remodel (5×8)
- $8,600–$25,500 per project
- Tub-to-shower
- $2,500–$12,700 / tub-to-shower conversion
Newer homes with easy access. Standard baths price at the city rate; primary suites with a separate tub and shower cost two to three times as much.
Real-World Bathroom Remodel Costs in Nashville
Here's what common bathroom remodel jobs cost in Nashville in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Nashville jobs land here; stone tile or a layout change pushes it toward $24,300.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,500–$12,100) and add a frameless glass door ($905–$2,800). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($5,550–$16,100) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,500–$6,050), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in Nashville?
Between $8,600 and $24,300 for a mid-range 5×8 full bath, and $14,700 is the price most Nashville homeowners pay. Labor is 40–65% of that: demolition $705–$2,550, plumbing, electrical ($505–$2,550), waterproofing ($605–$2,500) and tile setting. The rest is the vanity, toilet, tub or shower, glass and tile.
Two things to budget beyond the quote: permits at $150–$1,500 and a 10–20% contingency for what's behind the walls, since rotted subfloor ($3.75–$7 per sq ft) and old pipes are common finds. Re-checked against 103 sources in November 2026.
Bathroom remodel prices in Nashville (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $8,600–$24,300, a half bath $2,550–$12,100, a tiled walk-in shower $5,550–$16,100 installed and a vanity $805–$4,000.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $2,550 | $6,050 | $12,100 |
| Small full bath remodel (under 40 sq ft), same layout | $6,050 | $10,100 | $16,200 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $18,200 | $29,300 | $50,500 |
| Tub-to-shower conversion | $2,500 | $5,550 | $12,100 |
| Custom tiled walk-in shower, installed | $5,550 | $9,600 | $16,100 |
| Prefab shower kit, installed | $1,500 | $3,200 | $6,050 |
| Vanity with top, sink and faucet, installed | $805 | $1,800 | $4,000 |
| Toilet, installed | $355 | $605 | $1,000 |
Remodel or refresh in Nashville: a cosmetic refresh (vanity, toilet, fixtures, paint) at $2,000–$8,400 fixes a tired but sound bathroom. A full remodel at $14,700 typical is the answer when the tile, waterproofing or layout has failed.
What moves a bathroom remodel quote in Nashville:
- Room size — a half bath is $2,550–$12,100; a 5×8 full bath $8,600–$24,300; a 100 sq ft primary bath $18,200–$50,500.
- Tub or shower — a prefab kit is $1,500–$6,050; a custom tiled walk-in shower $5,550–$16,100; a tub-to-shower conversion $2,500–$12,100.
- Layout — moving the toilet, sink or shower adds $810–$5,050 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $12–$40 per sq ft installed, about $1,450–$4,800 for a 5×8 bath; a vanity $805–$4,000; frameless glass $905–$2,800.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every Nashville remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in Nashville by Bathroom Size
Half bath (20–30 sq ft): $2,550–$12,100. Small full bath under 40 sq ft: $6,050–$16,200. Standard 5×8 full bath: $8,600–$24,300. Primary bath, about 100 sq ft: $18,200–$50,500; luxury primary $50,300–$120,800.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,400, electrical with GFCI outlets, lights and fan $1,200, shower waterproofing $1,200, tile (about 120 sq ft at $22 per sq ft) $2,650, alcove tub $3,000, vanity with top and faucet $1,800, toilet $605, shower trim and fixtures $1,300, frameless glass $1,500, paint $455. Bought one job at a time in Nashville those pieces come to about $15,100. A contractor pricing the whole room on the same layout lands near $14,700, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $505 and any moved fixture are on top.
Per square foot, bathrooms run $120–$405 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $29,300 typical is about double a 5×8 bath, not two and a half times.
Nashville Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $2,000–$8,400 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $5,550–$12,100 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $8,600–$24,300 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $25,200–$60,500 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $50,300–$120,800 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $2,550–$12,100 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $6,050–$16,200 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $18,200–$50,500 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $2,500–$12,100 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $5,550–$16,100 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,500–$6,050 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $2,500–$29,300 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the Nashville bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $14,700 mid-range 5×8 job in Nashville that's roughly $5,900–$9,550 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in Nashville bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in a Nashville bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $150–$1,500 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $810–$5,050 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $905–$2,800, heated floor $600–$2,800, towel warmer $350–$1,200
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $2,550–$12,100 in Nashville, a 5×8 full bath $8,600–$24,300, a 100 sq ft primary bath $18,200–$50,500. Moving a fixture adds $810–$5,050 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,500–$6,050 installed; a custom tiled walk-in shower $5,550–$16,100; an alcove tub $1,500–$6,050; a freestanding soaking tub $3,000–$10,100. Converting a tub to a shower runs $2,500–$12,100.
Tile and finish level
Tile costs $12–$40 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,450–$4,800. Large-format porcelain and stone sit at the top; a vanity runs $805–$4,000 and frameless glass $905–$2,800.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Nashville homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $150–$1,500 for a Nashville remodel and make sure the contractor, not you, pulls it.
Labor rates in Nashville
Labor is 40–65% of the bill. Nashville is a high-cost metro for remodeling labor, so a mid-range 5×8 remodel is in line with the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $350–$1,200, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $810–$5,050.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,500–$12,100 fixes the room's biggest problem for a fraction of a full remodel at $14,700.
- Go prefab where it won't show.A prefab shower kit at $1,500–$6,050 costs less than half a tiled shower at $5,550–$16,100, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $705–$2,500 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $805–$4,000 looks like custom for far less.
- Get three line-item quotes.Each Nashville quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($150–$1,500) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Nashville remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in Nashville?
$8,600–$24,300 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $14,700 is typical. A half bath runs $2,550–$12,100, a primary bath $18,200–$50,500.
How much is a small bathroom remodel in Nashville?
$6,050–$16,200 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $5,550–$12,100; a half bath $2,550–$12,100.
How much does a tub-to-shower conversion cost in Nashville?
$2,500–$12,100, prefab at the low end and custom tile at the top. Add $905–$2,800 for a frameless glass door, so a tiled conversion with glass runs $3,400–$14,900.
How much does a walk-in shower cost in Nashville?
$5,550–$16,100 for a custom tiled walk-in shower installed, or $1,500–$6,050 for a prefab kit. Frameless glass is $905–$2,800 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in Nashville?
$18,200–$50,500 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $50,300–$120,800.
Do I need a permit to remodel a bathroom in Nashville?
Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $150–$1,500 for a Nashville remodel and make sure the contractor, not you, pulls it.
How long does a bathroom remodel take in Nashville?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in Nashville?
Labor is 40–65% of the bill, so about $5,900–$9,550 of a $14,700 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in a Nashville bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($150–$1,500), moving fixtures ($810–$5,050 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the Nashville metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in Nashville
Local bathroom remodelers · Free quotes · No obligation, no spam.