How much does a bathroom remodel cost in New Orleans?
By Our research team · Last verified · Methodology
Most bathroom remodels in New Orleans cost $8,350–$23,600 including demolition, tile, fixtures and labor. $14,300 is the usual price; a budget version is $5,400–$11,800 and an upscale one $24,700–$59,300.
How we get this data- Typical
- $14,300
- Low end
- $4,900
- High end
- $39,300
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical New Orleans price is $14,300, in line with the US typical of $14,500.
New Orleans's price band
New Orleans is pricier than 60% of the 195 US metros we price for bathroom remodel work.
A mid-range remodel of a 5×8 bathroom costs $8,350–$23,600 in New Orleans, and $14,300 is what most homeowners pay. A half bath runs $2,450–$11,800, a primary bath $17,800–$49,300, and a tub-to-shower conversion $2,450–$11,800.
As a large metro with mid-range remodeling prices, New Orleans prices a 5×8 remodel in line with the US typical. Same-layout jobs in Metairie & the West Bank are the simplest; older homes in CBD, Marigny & Bywater take longer once the walls are open.
Project prices include materials and labor. Fixtures, tile and the vanity are the lines you control; demolition, waterproofing and plumbing are where New Orleans remodelers earn their fee.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$8,350–$23,600 for a mid-range remodel of a 5×8 bathroom in New Orleans, labor and materials — typically $14,300. A half bath runs $2,450–$11,800, a primary bath $17,800–$49,300, and a tub-to-shower conversion $2,450–$11,800. Verified November 2026. Get free New Orleans quotes →
- Mid-range 5×8 full bath remodel: $8,350–$23,600 ($14,300 typical)
- Half bath $2,450–$11,800; primary bath $17,800–$49,300
- Tub-to-shower conversion $2,450–$11,800; tiled walk-in shower $5,450–$15,800
- Vanity installed $795–$3,950; toilet $345–$990; permits $150–$1,500
- Priciest area to remodel in: CBD, Marigny & Bywater; lowest quotes: Metairie & the West Bank
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. New Orleans metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $8,350per project | $14,300 | $23,600 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $5,400per project | $8,350 | $11,800 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $24,700per project | $37,600 | $59,300 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $49,500per project | $79,200 | $118,800 |
| Half bath (powder room) remodelper project | $2,450per project | $5,900 | $11,800 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $5,900per project | $9,850 | $15,800 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $17,800per project | $28,600 | $49,300 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $120per sq ft | $245 | $395 |
| Demolition to studs and debris disposalper project | $690per project | $1,400 | $2,450 |
| Plumbing rough-in or moving one fixtureper fixture | $790per fixture | $1,950 | $4,900 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $490per project | $1,200 | $2,450 |
| Shower waterproofing (membrane or pan liner)per shower | $590per shower | $1,200 | $2,450 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $12per sq ft | $22 | $39 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $795installed | $1,800 | $3,950 |
| Toilet, installed (mid-range two-piece)installed | $345installed | $595 | $990 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,500installed | $2,950 | $5,950 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $2,950installed | $5,950 | $9,900 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,500installed | $3,150 | $5,950 |
| Custom tiled walk-in shower, installedinstalled | $5,450installed | $9,350 | $15,800 |
| Tub-to-shower conversionper project | $2,450per project | $5,450 | $11,800 |
| Frameless glass shower door, installedinstalled | $890installed | $1,500 | $2,800 |
| Heated towel rack, hardwired, installedinstalled | $345installed | $695 | $1,200 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $695per project | $1,300 | $2,450 |
| Permits: building, plumbing and electricalper project | $150per project | $495 | $1,500 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in New Orleans
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Figures are for the New Orleans metro area. Travel charges can apply on the far edges; older plumbing in CBD, Marigny & Bywater adds the most surprises.
Bathroom remodel prices across New Orleans
Same tile, four price bands. Parking, building rules and old plumbing push CBD, Marigny & Bywater to the top; Metairie & the West Bank sits at or below the city typical.
CBD, Marigny & Bywater
- Full remodel (5×8)
- $9,000–$27,100 per project
- Tub-to-shower
- $2,650–$13,600 / tub-to-shower conversion
Pre-war and mid-century buildings with cast-iron drains and plaster walls. Expect a bigger contingency and a longer schedule than in a newer house.
Mid-City & Gentilly
- Full remodel (5×8)
- $8,350–$23,600 per project
- Tub-to-shower
- $2,450–$11,800 / tub-to-shower conversion
Mostly post-war houses with one or two full baths. Quotes cluster around the city typical.
New Orleans East & the 9th Ward
- Full remodel (5×8)
- $8,500–$25,000 per project
- Tub-to-shower
- $2,500–$12,500 / tub-to-shower conversion
Older housing stock with character. Keeping the layout and reusing the drain locations keeps a remodel here at the standard rate.
Metairie & the West Bank
- Full remodel (5×8)
- $8,350–$24,800 per project
- Tub-to-shower
- $2,450–$12,400 / tub-to-shower conversion
Newer homes with easy access. Standard baths price at the city rate; primary suites with a separate tub and shower cost two to three times as much.
Real-World Bathroom Remodel Costs in New Orleans
Here's what common bathroom remodel jobs cost in New Orleans in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most New Orleans jobs land here; stone tile or a layout change pushes it toward $23,600.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,450–$11,800) and add a frameless glass door ($890–$2,800). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($5,450–$15,800) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,500–$5,950), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in New Orleans?
A mid-range 5×8 remodel in New Orleans costs $8,350 to $23,600. The middle of the market, about $14,300, buys a gut to the studs, new waterproofing and tile, a new tub or shower, vanity, toilet and fixtures, on the same layout. Moving a fixture adds $790–$4,900 each.
If the layout stays put you save $3,000–$8,000 against moving the toilet or shower. If the tub never gets used, a tub-to-shower conversion at $2,450–$11,800 is the cheapest big upgrade. Figures re-checked against 103 sources in November 2026.
Bathroom remodel prices in New Orleans (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $8,350–$23,600, a half bath $2,450–$11,800, a tiled walk-in shower $5,450–$15,800 installed and a vanity $795–$3,950.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $2,450 | $5,900 | $11,800 |
| Small full bath remodel (under 40 sq ft), same layout | $5,900 | $9,850 | $15,800 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $17,800 | $28,600 | $49,300 |
| Tub-to-shower conversion | $2,450 | $5,450 | $11,800 |
| Custom tiled walk-in shower, installed | $5,450 | $9,350 | $15,800 |
| Prefab shower kit, installed | $1,500 | $3,150 | $5,950 |
| Vanity with top, sink and faucet, installed | $795 | $1,800 | $3,950 |
| Toilet, installed | $345 | $595 | $990 |
Remodel or refresh in New Orleans: a cosmetic refresh (vanity, toilet, fixtures, paint) at $2,000–$8,300 fixes a tired but sound bathroom. A full remodel at $14,300 typical is the answer when the tile, waterproofing or layout has failed.
What moves a bathroom remodel quote in New Orleans:
- Room size — a half bath is $2,450–$11,800; a 5×8 full bath $8,350–$23,600; a 100 sq ft primary bath $17,800–$49,300.
- Tub or shower — a prefab kit is $1,500–$5,950; a custom tiled walk-in shower $5,450–$15,800; a tub-to-shower conversion $2,450–$11,800.
- Layout — moving the toilet, sink or shower adds $790–$4,900 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $12–$39 per sq ft installed, about $1,450–$4,700 for a 5×8 bath; a vanity $795–$3,950; frameless glass $890–$2,800.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every New Orleans remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in New Orleans by Bathroom Size
Half bath (20–30 sq ft): $2,450–$11,800. Small full bath under 40 sq ft: $5,900–$15,800. Standard 5×8 full bath: $8,350–$23,600. Primary bath, about 100 sq ft: $17,800–$49,300; luxury primary $49,500–$118,800.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,400, electrical with GFCI outlets, lights and fan $1,200, shower waterproofing $1,200, tile (about 120 sq ft at $22 per sq ft) $2,650, alcove tub $2,950, vanity with top and faucet $1,800, toilet $595, shower trim and fixtures $1,300, frameless glass $1,500, paint $445. Bought one job at a time in New Orleans those pieces come to about $15,000. A contractor pricing the whole room on the same layout lands near $14,300, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $495 and any moved fixture are on top.
Per square foot, bathrooms run $120–$395 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $28,600 typical is about double a 5×8 bath, not two and a half times.
New Orleans Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $2,000–$8,300 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $5,400–$11,800 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $8,350–$23,600 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $24,700–$59,300 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $49,500–$118,800 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $2,450–$11,800 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $5,900–$15,800 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $17,800–$49,300 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $2,450–$11,800 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $5,450–$15,800 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,500–$5,950 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $2,450–$28,600 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the New Orleans bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $14,300 mid-range 5×8 job in New Orleans that's roughly $5,700–$9,300 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in New Orleans bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in a New Orleans bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $150–$1,500 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $790–$4,900 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $890–$2,800, heated floor $600–$2,800, towel warmer $345–$1,200
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $2,450–$11,800 in New Orleans, a 5×8 full bath $8,350–$23,600, a 100 sq ft primary bath $17,800–$49,300. Moving a fixture adds $790–$4,900 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,500–$5,950 installed; a custom tiled walk-in shower $5,450–$15,800; an alcove tub $1,500–$5,950; a freestanding soaking tub $2,950–$9,900. Converting a tub to a shower runs $2,450–$11,800.
Tile and finish level
Tile costs $12–$39 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,450–$4,700. Large-format porcelain and stone sit at the top; a vanity runs $795–$3,950 and frameless glass $890–$2,800.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older New Orleans homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $150–$1,500 for a New Orleans remodel and make sure the contractor, not you, pulls it.
Labor rates in New Orleans
Labor is 40–65% of the bill. New Orleans is a large metro with mid-range remodeling prices, so a mid-range 5×8 remodel is in line with the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $345–$1,200, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $790–$4,900.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,450–$11,800 fixes the room's biggest problem for a fraction of a full remodel at $14,300.
- Go prefab where it won't show.A prefab shower kit at $1,500–$5,950 costs less than half a tiled shower at $5,450–$15,800, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $695–$2,450 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $795–$3,950 looks like custom for far less.
- Get three line-item quotes.Each New Orleans quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($150–$1,500) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
New Orleans remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in New Orleans?
$8,350–$23,600 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $14,300 is typical. A half bath runs $2,450–$11,800, a primary bath $17,800–$49,300.
How much is a small bathroom remodel in New Orleans?
$5,900–$15,800 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $5,400–$11,800; a half bath $2,450–$11,800.
How much does a tub-to-shower conversion cost in New Orleans?
$2,450–$11,800, prefab at the low end and custom tile at the top. Add $890–$2,800 for a frameless glass door, so a tiled conversion with glass runs $3,350–$14,600.
How much does a walk-in shower cost in New Orleans?
$5,450–$15,800 for a custom tiled walk-in shower installed, or $1,500–$5,950 for a prefab kit. Frameless glass is $890–$2,800 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in New Orleans?
$17,800–$49,300 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $49,500–$118,800.
Do I need a permit to remodel a bathroom in New Orleans?
Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $150–$1,500 for a New Orleans remodel and make sure the contractor, not you, pulls it.
How long does a bathroom remodel take in New Orleans?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in New Orleans?
Labor is 40–65% of the bill, so about $5,700–$9,300 of a $14,300 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in a New Orleans bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($150–$1,500), moving fixtures ($790–$4,900 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the New Orleans metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in New Orleans
Local bathroom remodelers · Free quotes · No obligation, no spam.