How much does a bathroom remodel cost in Ogden?
By Our research team · Last verified · Methodology
Most bathroom remodels in Ogden cost $8,050–$22,700 per project for a 5×8 full bath gutted and rebuilt on the same layout. Most homeowners here pay about $13,700. A tub-to-shower conversion is $2,400–$11,500.
How we get this data- Typical
- $13,700
- Low end
- $4,750
- High end
- $37,800
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical Ogden price is $13,700, 6% below the US typical of $14,500.
Ogden's price band
Ogden is cheaper than 60% of the 195 US metros we price for bathroom remodel work.
A mid-range remodel of a 5×8 bathroom costs $8,050–$22,700 in Ogden, and $13,700 is what most homeowners pay. A half bath runs $2,400–$11,400, a primary bath $17,200–$47,800, and a tub-to-shower conversion $2,400–$11,500.
Ogden is a smaller market. Fixtures and tile cost about the same everywhere; what changes here is the crew's hourly rate, permit fees and how busy good remodelers are.
Project prices include materials and labor. Fixtures, tile and the vanity are the lines you control; demolition, waterproofing and plumbing are where Ogden remodelers earn their fee.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$8,050–$22,700 for a mid-range remodel of a 5×8 bathroom in Ogden, labor and materials — typically $13,700. A half bath runs $2,400–$11,400, a primary bath $17,200–$47,800, and a tub-to-shower conversion $2,400–$11,500. Verified November 2026. Get free Ogden quotes →
- Mid-range 5×8 full bath remodel: $8,050–$22,700 ($13,700 typical)
- Half bath $2,400–$11,400; primary bath $17,200–$47,800
- Tub-to-shower conversion $2,400–$11,500; tiled walk-in shower $5,250–$15,300
- Vanity installed $780–$3,900; toilet $335–$960; permits $145–$1,450
- Priciest area to remodel in: Downtown Ogden & 25th Street; lowest quotes: Weber State & the East Bench
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Ogden metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $8,050per project | $13,700 | $22,700 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $5,250per project | $8,100 | $11,400 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $24,100per project | $36,600 | $57,700 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $48,400per project | $77,400 | $116,100 |
| Half bath (powder room) remodelper project | $2,400per project | $5,700 | $11,400 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $5,700per project | $9,500 | $15,200 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $17,200per project | $27,700 | $47,800 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $115per sq ft | $240 | $380 |
| Demolition to studs and debris disposalper project | $665per project | $1,350 | $2,400 |
| Plumbing rough-in or moving one fixtureper fixture | $760per fixture | $1,900 | $4,750 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $475per project | $1,150 | $2,400 |
| Shower waterproofing (membrane or pan liner)per shower | $575per shower | $1,150 | $2,400 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $11per sq ft | $21 | $38 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $780installed | $1,750 | $3,900 |
| Toilet, installed (mid-range two-piece)installed | $335installed | $575 | $960 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,450installed | $2,900 | $5,800 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $2,900installed | $5,850 | $9,750 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,450installed | $3,100 | $5,800 |
| Custom tiled walk-in shower, installedinstalled | $5,250installed | $9,100 | $15,300 |
| Tub-to-shower conversionper project | $2,400per project | $5,250 | $11,500 |
| Frameless glass shower door, installedinstalled | $875installed | $1,450 | $2,700 |
| Heated towel rack, hardwired, installedinstalled | $340installed | $675 | $1,150 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $675per project | $1,250 | $2,400 |
| Permits: building, plumbing and electricalper project | $145per project | $485 | $1,450 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in Ogden
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Figures are for the Ogden metro area. Travel charges can apply on the far edges; older plumbing in Downtown Ogden & 25th Street adds the most surprises.
Bathroom remodel prices across Ogden
Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Downtown Ogden & 25th Street take the longest; same-layout jobs in Weber State & the East Bench tend to come in at or under the city typical.
Downtown Ogden & 25th Street
- Full remodel (5×8)
- $8,700–$26,100 per project
- Tub-to-shower
- $2,600–$13,200 / tub-to-shower conversion
Pre-war and mid-century buildings with cast-iron drains and plaster walls. Expect a bigger contingency and a longer schedule than in a newer house.
West Ogden & Marshall White
- Full remodel (5×8)
- $8,200–$24,100 per project
- Tub-to-shower
- $2,450–$12,200 / tub-to-shower conversion
Renovated older homes next to new builds. Pricing sits near the city typical; the extras come from what's behind the old tile.
Weber State & the East Bench
- Full remodel (5×8)
- $7,650–$22,200 per project
- Tub-to-shower
- $2,300–$11,300 / tub-to-shower conversion
Lots of rental housing and small baths. Simple same-layout remodels with stock fixtures keep most quotes at or below the city typical.
Layton, Roy & Clearfield
- Full remodel (5×8)
- $8,050–$23,800 per project
- Tub-to-shower
- $2,400–$12,100 / tub-to-shower conversion
Two or three full baths per house are common here. Expect standard pricing, and ask about doing two baths at once to share the demo and permit costs.
Real-World Bathroom Remodel Costs in Ogden
Here's what common bathroom remodel jobs cost in Ogden in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Ogden jobs land here; stone tile or a layout change pushes it toward $22,700.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,400–$11,500) and add a frameless glass door ($875–$2,700). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($5,250–$15,300) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,450–$5,800), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in Ogden?
Between $8,050 and $22,700 for a mid-range 5×8 full bath, and $13,700 is the price most Ogden homeowners pay. Labor is 40–65% of that: demolition $665–$2,400, plumbing, electrical ($475–$2,400), waterproofing ($575–$2,400) and tile setting. The rest is the vanity, toilet, tub or shower, glass and tile.
Two things to budget beyond the quote: permits at $145–$1,450 and a 10–20% contingency for what's behind the walls, since rotted subfloor ($3.75–$7 per sq ft) and old pipes are common finds. Re-checked against 103 sources in November 2026.
Bathroom remodel prices in Ogden (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $8,050–$22,700, a half bath $2,400–$11,400, a tiled walk-in shower $5,250–$15,300 installed and a vanity $780–$3,900.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $2,400 | $5,700 | $11,400 |
| Small full bath remodel (under 40 sq ft), same layout | $5,700 | $9,500 | $15,200 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $17,200 | $27,700 | $47,800 |
| Tub-to-shower conversion | $2,400 | $5,250 | $11,500 |
| Custom tiled walk-in shower, installed | $5,250 | $9,100 | $15,300 |
| Prefab shower kit, installed | $1,450 | $3,100 | $5,800 |
| Vanity with top, sink and faucet, installed | $780 | $1,750 | $3,900 |
| Toilet, installed | $335 | $575 | $960 |
Remodel or refresh in Ogden: a cosmetic refresh (vanity, toilet, fixtures, paint) at $1,950–$8,100 fixes a tired but sound bathroom. A full remodel at $13,700 typical is the answer when the tile, waterproofing or layout has failed.
What moves a bathroom remodel quote in Ogden:
- Room size — a half bath is $2,400–$11,400; a 5×8 full bath $8,050–$22,700; a 100 sq ft primary bath $17,200–$47,800.
- Tub or shower — a prefab kit is $1,450–$5,800; a custom tiled walk-in shower $5,250–$15,300; a tub-to-shower conversion $2,400–$11,500.
- Layout — moving the toilet, sink or shower adds $760–$4,750 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $11–$38 per sq ft installed, about $1,300–$4,550 for a 5×8 bath; a vanity $780–$3,900; frameless glass $875–$2,700.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every Ogden remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in Ogden by Bathroom Size
Half bath (20–30 sq ft): $2,400–$11,400. Small full bath under 40 sq ft: $5,700–$15,200. Standard 5×8 full bath: $8,050–$22,700. Primary bath, about 100 sq ft: $17,200–$47,800; luxury primary $48,400–$116,100.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,350, electrical with GFCI outlets, lights and fan $1,150, shower waterproofing $1,150, tile (about 120 sq ft at $21 per sq ft) $2,500, alcove tub $2,900, vanity with top and faucet $1,750, toilet $575, shower trim and fixtures $1,250, frameless glass $1,450, paint $430. Bought one job at a time in Ogden those pieces come to about $14,500. A contractor pricing the whole room on the same layout lands near $13,700, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $485 and any moved fixture are on top.
Per square foot, bathrooms run $115–$380 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $27,700 typical is about double a 5×8 bath, not two and a half times.
Ogden Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $1,950–$8,100 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $5,250–$11,400 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $8,050–$22,700 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $24,100–$57,700 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $48,400–$116,100 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $2,400–$11,400 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $5,700–$15,200 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $17,200–$47,800 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $2,400–$11,500 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $5,250–$15,300 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,450–$5,800 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $2,400–$27,700 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the Ogden bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $13,700 mid-range 5×8 job in Ogden that's roughly $5,500–$8,900 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in Ogden bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in an Ogden bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $145–$1,450 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $760–$4,750 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $875–$2,700, heated floor $600–$2,800, towel warmer $340–$1,150
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $2,400–$11,400 in Ogden, a 5×8 full bath $8,050–$22,700, a 100 sq ft primary bath $17,200–$47,800. Moving a fixture adds $760–$4,750 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,450–$5,800 installed; a custom tiled walk-in shower $5,250–$15,300; an alcove tub $1,450–$5,800; a freestanding soaking tub $2,900–$9,750. Converting a tub to a shower runs $2,400–$11,500.
Tile and finish level
Tile costs $11–$38 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,300–$4,550. Large-format porcelain and stone sit at the top; a vanity runs $780–$3,900 and frameless glass $875–$2,700.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Ogden homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $145–$1,450 for a Ogden remodel and make sure the contractor, not you, pulls it.
Labor rates in Ogden
Labor is 40–65% of the bill. Ogden is a smaller market, so a mid-range 5×8 remodel is about 6% below the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $340–$1,150, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $760–$4,750.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,400–$11,500 fixes the room's biggest problem for a fraction of a full remodel at $13,700.
- Go prefab where it won't show.A prefab shower kit at $1,450–$5,800 costs less than half a tiled shower at $5,250–$15,300, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $675–$2,400 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $780–$3,900 looks like custom for far less.
- Get three line-item quotes.Each Ogden quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($145–$1,450) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Ogden remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in Ogden?
$8,050–$22,700 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $13,700 is typical. A half bath runs $2,400–$11,400, a primary bath $17,200–$47,800.
How much is a small bathroom remodel in Ogden?
$5,700–$15,200 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $5,250–$11,400; a half bath $2,400–$11,400.
How much does a tub-to-shower conversion cost in Ogden?
$2,400–$11,500, prefab at the low end and custom tile at the top. Add $875–$2,700 for a frameless glass door, so a tiled conversion with glass runs $3,300–$14,200.
How much does a walk-in shower cost in Ogden?
$5,250–$15,300 for a custom tiled walk-in shower installed, or $1,450–$5,800 for a prefab kit. Frameless glass is $875–$2,700 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in Ogden?
$17,200–$47,800 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $48,400–$116,100.
Do I need a permit to remodel a bathroom in Ogden?
Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $145–$1,450 for a Ogden remodel and make sure the contractor, not you, pulls it.
How long does a bathroom remodel take in Ogden?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in Ogden?
Labor is 40–65% of the bill, so about $5,500–$8,900 of a $13,700 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in an Ogden bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($145–$1,450), moving fixtures ($760–$4,750 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the Ogden metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in Ogden
Local bathroom remodelers · Free quotes · No obligation, no spam.