How much does a bathroom remodel cost in Santa Fe?
By Our research team · Last verified · Methodology
Most bathroom remodels in Santa Fe cost $7,450–$21,100 per project for a 5×8 full bath gutted and rebuilt on the same layout. Most homeowners here pay about $12,700. A tub-to-shower conversion is $2,250–$10,800.
How we get this data- Typical
- $12,700
- Low end
- $4,400
- High end
- $35,100
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical Santa Fe price is $12,700, 12% below the US typical of $14,500.
Santa Fe's price band
Santa Fe is cheaper than 86% of the 195 US metros we price for bathroom remodel work.
A mid-range remodel of a 5×8 bathroom costs $7,450–$21,100 in Santa Fe, and $12,700 is what most homeowners pay. A half bath runs $2,200–$10,700, a primary bath $16,200–$45,100, and a tub-to-shower conversion $2,250–$10,800.
Santa Fe is a smaller market. Fixtures and tile cost about the same everywhere; what changes here is the crew's hourly rate, permit fees and how busy good remodelers are.
Project prices include materials and labor. Fixtures, tile and the vanity are the lines you control; demolition, waterproofing and plumbing are where Santa Fe remodelers earn their fee.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$7,450–$21,100 for a mid-range remodel of a 5×8 bathroom in Santa Fe, labor and materials — typically $12,700. A half bath runs $2,200–$10,700, a primary bath $16,200–$45,100, and a tub-to-shower conversion $2,250–$10,800. Verified November 2026. Get free Santa Fe quotes →
- Mid-range 5×8 full bath remodel: $7,450–$21,100 ($12,700 typical)
- Half bath $2,200–$10,700; primary bath $16,200–$45,100
- Tub-to-shower conversion $2,250–$10,800; tiled walk-in shower $4,950–$14,400
- Vanity installed $750–$3,750; toilet $320–$915; permits $140–$1,400
- Priciest area to remodel in: Downtown Santa Fe & the Railyard; lowest quotes: Los Alamos, Española & Eldorado
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Santa Fe metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $7,450per project | $12,700 | $21,100 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $4,900per project | $7,550 | $10,700 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $22,900per project | $34,700 | $54,900 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $46,300per project | $74,100 | $111,200 |
| Half bath (powder room) remodelper project | $2,200per project | $5,350 | $10,700 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $5,350per project | $8,900 | $14,200 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $16,200per project | $26,200 | $45,100 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $105per sq ft | $220 | $355 |
| Demolition to studs and debris disposalper project | $625per project | $1,250 | $2,200 |
| Plumbing rough-in or moving one fixtureper fixture | $710per fixture | $1,800 | $4,450 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $445per project | $1,050 | $2,200 |
| Shower waterproofing (membrane or pan liner)per shower | $540per shower | $1,100 | $2,250 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $11per sq ft | $20 | $36 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $750installed | $1,700 | $3,750 |
| Toilet, installed (mid-range two-piece)installed | $320installed | $550 | $915 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,400installed | $2,800 | $5,550 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $2,800installed | $5,650 | $9,400 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,400installed | $2,950 | $5,550 |
| Custom tiled walk-in shower, installedinstalled | $4,950installed | $8,550 | $14,400 |
| Tub-to-shower conversionper project | $2,250per project | $4,950 | $10,800 |
| Frameless glass shower door, installedinstalled | $845installed | $1,400 | $2,650 |
| Heated towel rack, hardwired, installedinstalled | $325installed | $650 | $1,100 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $650per project | $1,200 | $2,300 |
| Permits: building, plumbing and electricalper project | $140per project | $470 | $1,400 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in Santa Fe
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices cover the Santa Fe metro. Outlying towns can run 5–10% lower; condos and older homes in Downtown Santa Fe & the Railyard sit at the top of each range.
Bathroom remodel prices across Santa Fe
Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Downtown Santa Fe & the Railyard take the longest; same-layout jobs in Los Alamos, Española & Eldorado tend to come in at or under the city typical.
Downtown Santa Fe & the Railyard
- Full remodel (5×8)
- $8,050–$24,300 per project
- Tub-to-shower
- $2,450–$12,400 / tub-to-shower conversion
Condos, apartments and older buildings: elevator bookings, building rules, parking and tight stairwells all add crew time. Older plumbing stacks here often need work once the walls are open.
Southside Santa Fe
- Full remodel (5×8)
- $7,600–$22,400 per project
- Tub-to-shower
- $2,300–$11,400 / tub-to-shower conversion
A mix of older homes and new infill. Older houses here often turn up galvanized supply lines or a rotted subfloor under the tub once demolition starts.
Midtown & Siler Road
- Full remodel (5×8)
- $7,450–$21,100 per project
- Tub-to-shower
- $2,250–$10,800 / tub-to-shower conversion
Standard pricing for standard jobs. Driveway access for the dumpster and easy parking keep crew time down.
Los Alamos, Española & Eldorado
- Full remodel (5×8)
- $6,950–$20,700 per project
- Tub-to-shower
- $2,100–$10,600 / tub-to-shower conversion
The lowest remodeling labor prices in the metro, with a travel charge at some companies. Simple same-layout jobs keep most bills low.
Real-World Bathroom Remodel Costs in Santa Fe
Here's what common bathroom remodel jobs cost in Santa Fe in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Santa Fe jobs land here; stone tile or a layout change pushes it toward $21,100.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,250–$10,800) and add a frameless glass door ($845–$2,650). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($4,950–$14,400) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,400–$5,550), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in Santa Fe?
A mid-range 5×8 remodel in Santa Fe costs $7,450 to $21,100. The middle of the market, about $12,700, buys a gut to the studs, new waterproofing and tile, a new tub or shower, vanity, toilet and fixtures, on the same layout. Moving a fixture adds $710–$4,450 each.
Size moves the total more than anything: a half bath is $2,200–$10,700, a small full bath $5,350–$14,200, a 100 sq ft primary bath $16,200–$45,100. Prices re-checked against 103 sources in November 2026.
Bathroom remodel prices in Santa Fe (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $7,450–$21,100, a half bath $2,200–$10,700, a tiled walk-in shower $4,950–$14,400 installed and a vanity $750–$3,750.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $2,200 | $5,350 | $10,700 |
| Small full bath remodel (under 40 sq ft), same layout | $5,350 | $8,900 | $14,200 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $16,200 | $26,200 | $45,100 |
| Tub-to-shower conversion | $2,250 | $4,950 | $10,800 |
| Custom tiled walk-in shower, installed | $4,950 | $8,550 | $14,400 |
| Prefab shower kit, installed | $1,400 | $2,950 | $5,550 |
| Vanity with top, sink and faucet, installed | $750 | $1,700 | $3,750 |
| Toilet, installed | $320 | $550 | $915 |
Labor is the bulk of a Santa Fe bill. Tile at $11–$36 per sq ft installed and a tiled shower at $4,950–$14,400 are mostly skilled hours; the vanity at $750–$3,750 and toilet at $320–$915 are mostly the product.
What moves a bathroom remodel quote in Santa Fe:
- Room size — a half bath is $2,200–$10,700; a 5×8 full bath $7,450–$21,100; a 100 sq ft primary bath $16,200–$45,100.
- Tub or shower — a prefab kit is $1,400–$5,550; a custom tiled walk-in shower $4,950–$14,400; a tub-to-shower conversion $2,250–$10,800.
- Layout — moving the toilet, sink or shower adds $710–$4,450 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $11–$36 per sq ft installed, about $1,300–$4,300 for a 5×8 bath; a vanity $750–$3,750; frameless glass $845–$2,650.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every Santa Fe remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in Santa Fe by Bathroom Size
Half bath (20–30 sq ft): $2,200–$10,700. Small full bath under 40 sq ft: $5,350–$14,200. Standard 5×8 full bath: $7,450–$21,100. Primary bath, about 100 sq ft: $16,200–$45,100; luxury primary $46,300–$111,200.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,250, electrical with GFCI outlets, lights and fan $1,050, shower waterproofing $1,100, tile (about 120 sq ft at $20 per sq ft) $2,400, alcove tub $2,800, vanity with top and faucet $1,700, toilet $550, shower trim and fixtures $1,200, frameless glass $1,400, paint $400. Bought one job at a time in Santa Fe those pieces come to about $13,900. A contractor pricing the whole room on the same layout lands near $12,700, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $470 and any moved fixture are on top.
Per square foot, bathrooms run $105–$355 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $26,200 typical is about double a 5×8 bath, not two and a half times.
Santa Fe Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $1,850–$7,750 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $4,900–$10,700 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $7,450–$21,100 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $22,900–$54,900 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $46,300–$111,200 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $2,200–$10,700 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $5,350–$14,200 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $16,200–$45,100 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $2,250–$10,800 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $4,950–$14,400 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,400–$5,550 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $2,250–$26,200 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the Santa Fe bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $12,700 mid-range 5×8 job in Santa Fe that's roughly $5,100–$8,250 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in Santa Fe bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in a Santa Fe bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $140–$1,400 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $710–$4,450 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $845–$2,650, heated floor $600–$2,800, towel warmer $325–$1,100
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $2,200–$10,700 in Santa Fe, a 5×8 full bath $7,450–$21,100, a 100 sq ft primary bath $16,200–$45,100. Moving a fixture adds $710–$4,450 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,400–$5,550 installed; a custom tiled walk-in shower $4,950–$14,400; an alcove tub $1,400–$5,550; a freestanding soaking tub $2,800–$9,400. Converting a tub to a shower runs $2,250–$10,800.
Tile and finish level
Tile costs $11–$36 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,300–$4,300. Large-format porcelain and stone sit at the top; a vanity runs $750–$3,750 and frameless glass $845–$2,650.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Santa Fe homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $140–$1,400 for a Santa Fe remodel and make sure the contractor, not you, pulls it.
Labor rates in Santa Fe
Labor is 40–65% of the bill. Santa Fe is a smaller market, so a mid-range 5×8 remodel is about 12% below the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $325–$1,100, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $710–$4,450.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,250–$10,800 fixes the room's biggest problem for a fraction of a full remodel at $12,700.
- Go prefab where it won't show.A prefab shower kit at $1,400–$5,550 costs less than half a tiled shower at $4,950–$14,400, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $650–$2,300 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $750–$3,750 looks like custom for far less.
- Get three line-item quotes.Each Santa Fe quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($140–$1,400) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Santa Fe remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in Santa Fe?
$7,450–$21,100 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $12,700 is typical. A half bath runs $2,200–$10,700, a primary bath $16,200–$45,100.
How much is a small bathroom remodel in Santa Fe?
$5,350–$14,200 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $4,900–$10,700; a half bath $2,200–$10,700.
How much does a tub-to-shower conversion cost in Santa Fe?
$2,250–$10,800, prefab at the low end and custom tile at the top. Add $845–$2,650 for a frameless glass door, so a tiled conversion with glass runs $3,100–$13,500.
How much does a walk-in shower cost in Santa Fe?
$4,950–$14,400 for a custom tiled walk-in shower installed, or $1,400–$5,550 for a prefab kit. Frameless glass is $845–$2,650 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in Santa Fe?
$16,200–$45,100 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $46,300–$111,200.
Do I need a permit to remodel a bathroom in Santa Fe?
Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $140–$1,400 for a Santa Fe remodel and make sure the contractor, not you, pulls it.
How long does a bathroom remodel take in Santa Fe?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in Santa Fe?
Labor is 40–65% of the bill, so about $5,100–$8,250 of a $12,700 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in a Santa Fe bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($140–$1,400), moving fixtures ($710–$4,450 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the Santa Fe metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in Santa Fe
Local bathroom remodelers · Free quotes · No obligation, no spam.