Skip to content
Independent United States Cost GuidesPrices verified November 2026 · 39 trades · 195 US cities · 221+ sources For pros →
Get a fair quote

Cost guides

Plumbing & water4 trades
Electrical & energy5 trades
Renovation8 trades
Structural7 trades
Outdoor & yard7 trades
Cleaning & maintenance8 trades

More

Get a fair quote
Cost guide

How much does a bathroom remodel cost in Wilmington?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched12 min read
Bathroom remodel cost

Bathroom remodel costs in Wilmington

Wilmington, NCChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Wilmington, NC
$7,650–$21,700per project

Most bathroom remodels in Wilmington cost $7,650–$21,700 per project for a 5×8 full bath gutted and rebuilt on the same layout. Most homeowners here pay about $13,100. A tub-to-shower conversion is $2,300–$11,100.

How we get this data
Typical
$13,100
Low end
$4,500
High end
$36,100
Mid-range 5×8 bath
$7,650–$21,700
Half bath
$2,300–$10,900
Tub-to-shower
$2,300–$11,100
Primary bath
$16,600–$46,100

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.

Get my fair quote →
Typical bathroom remodel price: Wilmington vs nearby citiesTypical price, per project. The line marks the US typical.
Raleigh, NC $14,300
Charleston, SC $14,100
Durham, NC $13,900
Greenville, NC $13,300
Wilmington, NCThis guide $13,100

The typical Wilmington price is $13,100, 10% below the US typical of $14,500.

Where Wilmington sits among 195 US metrosNumber of metros at each typical bathroom remodel price, per project.

Wilmington's price band

Wilmington is cheaper than 79% of the 195 US metros we price for bathroom remodel work.

Expect $2,300–$11,100 to convert a tub to a walk-in shower in Wilmington, $5,050–$14,700 for a custom tiled shower, $760–$3,800 for a new vanity installed and $325–$930 for a toilet. A full mid-range remodel of a 5×8 bath is $7,650–$21,700.

As a smaller market, Wilmington prices a 5×8 remodel about 10% below the US typical. Same-layout jobs in Leland, Carolina Beach & Jacksonville NC are the simplest; older homes in Downtown Wilmington & the Brooklyn Arts District take longer once the walls are open.

Every project price here covers tear-out, rough-in, waterproofing, tile, fixtures and labor for a job on the same layout. Moving the toilet or shower adds $730–$4,550 per fixture.

Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.

Quick answer

$7,650–$21,700 for a mid-range remodel of a 5×8 bathroom in Wilmington, labor and materials — typically $13,100. A half bath runs $2,300–$10,900, a primary bath $16,600–$46,100, and a tub-to-shower conversion $2,300–$11,100. Verified November 2026. Get free Wilmington quotes →

  • Mid-range 5×8 full bath remodel: $7,650–$21,700 ($13,100 typical)
  • Half bath $2,300–$10,900; primary bath $16,600–$46,100
  • Tub-to-shower conversion $2,300–$11,100; tiled walk-in shower $5,050–$14,700
  • Vanity installed $760–$3,800; toilet $325–$930; permits $145–$1,450
  • Priciest area to remodel in: Downtown Wilmington & the Brooklyn Arts District; lowest quotes: UNCW & Midtown

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Detailed pricing — Bathroom remodel cost in Wilmington 2026

Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Wilmington metro, re-verified November 2026.

ServiceLowTypicalHigh
Mid-range full remodel, 5×8 ft bath, same layoutper project$7,650per project$13,100$21,700
Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project$5,000per project$7,750$10,900
Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project$23,300per project$35,400$55,900
Luxury primary bathroom remodel, 100+ sq ftper project$47,100per project$75,300$113,000
Half bath (powder room) remodelper project$2,300per project$5,450$10,900
Small full bath remodel (under 40 sq ft), same layoutper project$5,450per project$9,100$14,600
Primary bathroom remodel, mid-range, about 100 sq ftper project$16,600per project$26,700$46,100
Full remodel, cost per square foot (whole-room average)per sq ft$110per sq ft$230$365
Demolition to studs and debris disposalper project$640per project$1,300$2,300
Plumbing rough-in or moving one fixtureper fixture$730per fixture$1,800$4,550
Electrical: GFCI outlets, vanity lights and exhaust fanper project$455per project$1,100$2,300
Shower waterproofing (membrane or pan liner)per shower$555per shower$1,100$2,300
Tile installation, floor or shower walls, materials and laborper sq ft$11per sq ft$20$37
Vanity with top, sink and faucet, installed (36–48 in)installed$760installed$1,700$3,800
Toilet, installed (mid-range two-piece)installed$325installed$560$930
Alcove bathtub replacement, 60-in acrylic, installedinstalled$1,400installed$2,800$5,650
Freestanding soaking tub with floor-mount filler, installedinstalled$2,850installed$5,700$9,500
Prefab shower (acrylic or fiberglass kit), installedinstalled$1,400installed$3,000$5,650
Custom tiled walk-in shower, installedinstalled$5,050installed$8,750$14,700
Tub-to-shower conversionper project$2,300per project$5,050$11,100
Frameless glass shower door, installedinstalled$855installed$1,450$2,650
Heated towel rack, hardwired, installedinstalled$330installed$660$1,150
Faucet, showerhead and trim package, installed (mid-range)per project$660per project$1,200$2,350
Permits: building, plumbing and electricalper project$145per project$475$1,450
Bigger bathroom remodel jobs in Wilmington: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Luxury primary bathroom remodel, 100+ sq ft $75,300$47.1K–$113K
Upscale remodel, high-end tile and fixtures (5×8 to 8×10) $35,400$23.3K–$55.9K
Primary bathroom remodel, mid-range, about 100 sq ft $26,700$16.6K–$46.1K
Mid-range full remodel, 5×8 ft bath, same layout $13,100$7,650–$21.7K
Small full bath remodel (under 40 sq ft), same layout $9,100$5,450–$14.6K
Smaller bathroom remodel jobs and repairs in WilmingtonPer project, low to high with the typical price marked. Every line is in the table above.
Budget full remodel, 5×8 ft, stock fixtures and ceramic tile $7,750$5,000–$10.9K
Half bath (powder room) remodel $5,450$2,300–$10.9K
Tub-to-shower conversion $5,050$2,300–$11.1K
Demolition to studs and debris disposal $1,300$640–$2,300
Faucet, showerhead and trim package, installed (mid-range) $1,200$660–$2,350
Electrical: GFCI outlets, vanity lights and exhaust fan $1,100$455–$2,300
Permits: building, plumbing and electrical $475$145–$1,450
Already got a quote?
Check it against these Wilmington prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local bathroom remodelers in Wilmington

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Prices cover the Wilmington metro. Outlying towns can run 5–10% lower; condos and older homes in Downtown Wilmington & the Brooklyn Arts District sit at the top of each range.

How bathroom remodel costs vary across Wilmington

Bathroom remodel prices across Wilmington

Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Downtown Wilmington & the Brooklyn Arts District take the longest; same-layout jobs in UNCW & Midtown tend to come in at or under the city typical.

Bathroom remodel prices across WilmingtonTypical range by part of the metro, per project. The line marks the Wilmington typical.
Downtown Wilmington & the Brooklyn Arts District10–15% above the city average $8,250–$25Kper project
Northside & CreekwoodStandard to 5% above $7,800–$23Kper project
UNCW & MidtownStandard to 5% below $7,250–$21.3Kper project
Leland, Carolina Beach & Jacksonville NCStandard; bigger primary baths $7,650–$22.8Kper project

Downtown Wilmington & the Brooklyn Arts District

10–15% above the city average
Downtown, Brooklyn Arts District, Castle Street
Full remodel (5×8)
$8,250–$25,000 per project
Tub-to-shower
$2,500–$12,800 / tub-to-shower conversion

Pre-war and mid-century buildings with cast-iron drains and plaster walls. Expect a bigger contingency and a longer schedule than in a newer house.

Northside & Creekwood

Standard to 5% above
Northside, Creekwood, Greenfield
Full remodel (5×8)
$7,800–$23,000 per project
Tub-to-shower
$2,350–$11,800 / tub-to-shower conversion

A mix of older homes and new infill. Older houses here often turn up galvanized supply lines or a rotted subfloor under the tub once demolition starts.

UNCW & Midtown

Standard to 5% below
UNC Wilmington, Midtown, Ogden
Full remodel (5×8)
$7,250–$21,300 per project
Tub-to-shower
$2,200–$10,900 / tub-to-shower conversion

Lots of rental housing and small baths. Simple same-layout remodels with stock fixtures keep most quotes at or below the city typical.

Leland, Carolina Beach & Jacksonville NC

Standard; bigger primary baths
Leland, Carolina Beach, Wrightsville, Jacksonville NC
Full remodel (5×8)
$7,650–$22,800 per project
Tub-to-shower
$2,300–$11,700 / tub-to-shower conversion

Bigger homes with primary baths of 80–120 sq ft. Double vanities, tiled walk-in showers and freestanding tubs push totals well above a 5×8 bath.

What you'll actually pay — job by job

Real-World Bathroom Remodel Costs in Wilmington

Here's what common bathroom remodel jobs cost in Wilmington in 2026, labor and materials on the existing layout.

Mid-range 5×8 full bath, same layout — 2–4 weeks

$7,650–$13,100

Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Wilmington jobs land here; stone tile or a layout change pushes it toward $21,700.

Tub-to-shower conversion with frameless glass

$3,150–$13,800

Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,300–$11,100) and add a frameless glass door ($855–$2,650). The most popular single upgrade in older homes.

Half bath (powder room) refresh — 3–7 days

$2,300–$10,900

New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.

Primary bath, mid-range, about 100 sq ft — 4–6 weeks

$16,600–$46,100

Double vanity, separate tiled shower ($5,050–$14,700) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.

Budget rental or resale remodel — 1–2 weeks

$5,000–$10,900

Prefab shower or tub surround ($1,400–$5,650), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.

How much does a bathroom remodel cost in Wilmington?

$7,650–$21,700, with $13,100 typical. A budget job with a prefab shower and stock vanity is $5,000–$10,900; a mid-range job with porcelain tile and a semi-custom vanity lands near $13,100; stone tile, frameless glass and a custom vanity push it to $23,300–$55,900. Quotes above $21,700 usually mean a layout change or a primary-size room.

Size moves the total more than anything: a half bath is $2,300–$10,900, a small full bath $5,450–$14,600, a 100 sq ft primary bath $16,600–$46,100. Prices re-checked against 103 sources in November 2026.

Bathroom remodel prices in Wilmington (2026): by room, tub, shower and vanity

A mid-range 5×8 remodel costs $7,650–$21,700, a half bath $2,300–$10,900, a tiled walk-in shower $5,050–$14,700 installed and a vanity $760–$3,800.

Line on the quoteLowTypicalHigh
Half bath (powder room) remodel$2,300$5,450$10,900
Small full bath remodel (under 40 sq ft), same layout$5,450$9,100$14,600
Primary bathroom remodel, mid-range, about 100 sq ft$16,600$26,700$46,100
Tub-to-shower conversion$2,300$5,050$11,100
Custom tiled walk-in shower, installed$5,050$8,750$14,700
Prefab shower kit, installed$1,400$3,000$5,650
Vanity with top, sink and faucet, installed$760$1,700$3,800
Toilet, installed$325$560$930

Labor is the bulk of a Wilmington bill. Tile at $11–$37 per sq ft installed and a tiled shower at $5,050–$14,700 are mostly skilled hours; the vanity at $760–$3,800 and toilet at $325–$930 are mostly the product.

What moves a bathroom remodel quote in Wilmington:

  • Room size — a half bath is $2,300–$10,900; a 5×8 full bath $7,650–$21,700; a 100 sq ft primary bath $16,600–$46,100.
  • Tub or shower — a prefab kit is $1,400–$5,650; a custom tiled walk-in shower $5,050–$14,700; a tub-to-shower conversion $2,300–$11,100.
  • Layout — moving the toilet, sink or shower adds $730–$4,550 per fixture; keeping the layout saves $3,000–$8,000.
  • Tile and finishes — tile runs $11–$37 per sq ft installed, about $1,300–$4,450 for a 5×8 bath; a vanity $760–$3,800; frameless glass $855–$2,650.
  • What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.

Ask every Wilmington remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →

Bathroom Remodel Cost in Wilmington by Bathroom Size

Quick answer

Half bath (20–30 sq ft): $2,300–$10,900. Small full bath under 40 sq ft: $5,450–$14,600. Standard 5×8 full bath: $7,650–$21,700. Primary bath, about 100 sq ft: $16,600–$46,100; luxury primary $47,100–$113,000.

Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,300, electrical with GFCI outlets, lights and fan $1,100, shower waterproofing $1,100, tile (about 120 sq ft at $20 per sq ft) $2,400, alcove tub $2,800, vanity with top and faucet $1,700, toilet $560, shower trim and fixtures $1,200, frameless glass $1,450, paint $410. Bought one job at a time in Wilmington those pieces come to about $14,000. A contractor pricing the whole room on the same layout lands near $13,100, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $475 and any moved fixture are on top.

Per square foot, bathrooms run $110–$365 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $26,700 typical is about double a 5×8 bath, not two and a half times.

Wilmington Bathroom Remodel Costs by Type and Level

Remodel typeCostBest for
Cosmetic refresh (vanity, toilet, fixtures, paint)$1,900–$7,900 per projectA tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work.
Budget full remodel, 5×8$5,000–$10,900 per projectRentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout.
Mid-range full remodel, 5×8$7,650–$21,700 per projectMost family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout.
Upscale remodel$23,300–$55,900 per projectLarge-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change.
Luxury primary bath, 100+ sq ft$47,100–$113,000 per projectFreestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule.
Half bath (powder room)$2,300–$10,900 per projectToilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo.
Small full bath under 40 sq ft$5,450–$14,600 per projectHall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same.
Primary bath, mid-range, ~100 sq ft$16,600–$46,100 per projectDouble vanity, separate tub and shower, more tile. Roughly double a 5×8 bath.
Tub-to-shower conversion$2,300–$11,100 per projectReplacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location.
Custom tiled walk-in shower$5,050–$14,700 installedAny size or shape, bench and niche, curbless entry possible. Needs proper waterproofing.
Prefab shower kit$1,400–$5,650 installedAcrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain.
Accessible / aging-in-place remodel$2,300–$26,700 per projectCurbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves.
Cost by remodel type in WilmingtonTypical range, per project.
Cosmetic refresh (vanity, toilet, fixtures, paint) $1,900–$7,900per project
Budget full remodel, 5×8 $5,000–$10.9Kper project
Mid-range full remodel, 5×8 $7,650–$21.7Kper project
Upscale remodel $23.3K–$55.9Kper project
Luxury primary bath, 100+ sq ft $47.1K–$113Kper project
Half bath (powder room) $2,300–$10.9Kper project
Small full bath under 40 sq ft $5,450–$14.6Kper project
Primary bath, mid-range, ~100 sq ft $16.6K–$46.1Kper project
Tub-to-shower conversion $2,300–$11.1Kper project
Accessible / aging-in-place remodel $2,300–$26.7Kper project
Wilmington tip: decide on waterproofing before tile. A proper membrane or pan ($555–$2,300) is the one line never to cut; it's what fails first in a cheap remodel.

Materials vs. labor — the Wilmington bathroom remodel bill

Labor is 40–65% of a bathroom remodel. On a $13,100 mid-range 5×8 job in Wilmington that's roughly $5,250–$8,500 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.

Plumbers in Wilmington bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.

What's included in a Wilmington bathroom remodel quote (and what costs extra)

A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:

  • Permits — $145–$1,450 for building, plumbing and electrical, often billed at cost
  • Moving fixtures — $730–$4,550 per toilet, sink or shower relocated
  • Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
  • Upgrades — frameless glass $855–$2,650, heated floor $600–$2,800, towel warmer $330–$1,150

Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.

What Affects Bathroom Remodel Costs in Wilmington

Room size and layout

A half bath costs $2,300–$10,900 in Wilmington, a 5×8 full bath $7,650–$21,700, a 100 sq ft primary bath $16,600–$46,100. Moving a fixture adds $730–$4,550 each; keeping the layout saves $3,000–$8,000.

Tub or shower choice

A prefab shower kit is $1,400–$5,650 installed; a custom tiled walk-in shower $5,050–$14,700; an alcove tub $1,400–$5,650; a freestanding soaking tub $2,850–$9,500. Converting a tub to a shower runs $2,300–$11,100.

Tile and finish level

Tile costs $11–$37 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,300–$4,450. Large-format porcelain and stone sit at the top; a vanity runs $760–$3,800 and frameless glass $855–$2,650.

What's behind the walls

Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Wilmington homes should carry a 10–20% contingency.

Permits and local rules

A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $145–$1,450 for a Wilmington remodel and make sure the contractor, not you, pulls it.

Labor rates in Wilmington

Labor is 40–65% of the bill. Wilmington is a smaller market, so a mid-range 5×8 remodel is about 10% below the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.

Scope creep and extras

Heated floors add $600–$2,800, a heated towel rack $330–$1,150, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.

How to Save Money on a Bathroom Remodel in Wilmington
  1. Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $730–$4,550.
  2. Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,300–$11,100 fixes the room's biggest problem for a fraction of a full remodel at $13,100.
  3. Go prefab where it won't show.A prefab shower kit at $1,400–$5,650 costs less than half a tiled shower at $5,050–$14,700, and has no grout to maintain.
  4. Buy mid-range fixtures from one collection.A $660–$2,350 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $760–$3,800 looks like custom for far less.
  5. Get three line-item quotes.Each Wilmington quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($145–$1,450) and labor on separate lines. Compare the lines, not the total.
  6. Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Bathroom Remodel Cost in Wilmington: What the Quote Should Include

Wilmington remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:

  • Demolition and disposal, including the dumpster
  • Plumbing and electrical scope, and whether fixtures move
  • Waterproofing method (sheet or liquid membrane, pan) and its warranty
  • Tile type, square footage and labor, with layout and pattern noted
  • Fixture and vanity allowances or fixed prices, by model
  • Permits: who pulls them and what they cost
  • Schedule with start and finish dates and the payment stages
  • Contingency for hidden damage and how change orders are priced
Frequently asked questions — Bathroom remodel cost in Wilmington
How much does a bathroom remodel cost in Wilmington?

$7,650–$21,700 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $13,100 is typical. A half bath runs $2,300–$10,900, a primary bath $16,600–$46,100.

How much is a small bathroom remodel in Wilmington?

$5,450–$14,600 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $5,000–$10,900; a half bath $2,300–$10,900.

How much does a tub-to-shower conversion cost in Wilmington?

$2,300–$11,100, prefab at the low end and custom tile at the top. Add $855–$2,650 for a frameless glass door, so a tiled conversion with glass runs $3,150–$13,800.

How much does a walk-in shower cost in Wilmington?

$5,050–$14,700 for a custom tiled walk-in shower installed, or $1,400–$5,650 for a prefab kit. Frameless glass is $855–$2,650 more; a curbless entry adds $1,000–$4,000.

How much is a primary bathroom remodel in Wilmington?

$16,600–$46,100 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $47,100–$113,000.

Do I need a permit to remodel a bathroom in Wilmington?

Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $145–$1,450 for a Wilmington remodel and make sure the contractor, not you, pulls it.

How long does a bathroom remodel take in Wilmington?

About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.

What does labor cost for a bathroom remodel in Wilmington?

Labor is 40–65% of the bill, so about $5,250–$8,500 of a $13,100 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.

Does a bathroom remodel add value to my home?

Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.

What's included in a Wilmington bathroom remodel quote?

Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($145–$1,450), moving fixtures ($730–$4,550 each) and hidden damage.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Prices for the Wilmington metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, the Cost vs Value and Houzz studies, remodeler price pages, dated city price pages and federal wage data. No remodeling company can pay to change them, so always get two or three quotes. Last reviewed November 2026. Read our full methodology →

Get a fair bathroom remodel quote in Wilmington

Local bathroom remodelers · Free quotes · No obligation, no spam.

Get quotes in Wilmington →Max 2 bathroom remodelers will contact you
Get quotes in WilmingtonMax 2 bathroom remodelers · free · no spam→