Skip to content
Independent United States Cost GuidesPrices verified November 2026 · 39 trades · 195 US cities · 221+ sources For pros →
Get a fair quote

Cost guides

Plumbing & water4 trades
Electrical & energy5 trades
Renovation8 trades
Structural7 trades
Outdoor & yard7 trades
Cleaning & maintenance8 trades

More

Get a fair quote
Cost guide

How much does a bathroom remodel cost in Los Angeles?

By Our research team · Last verified · Methodology

Updated November 2026Independently researched13 min read
Bathroom remodel cost

Bathroom remodel costs in Los Angeles

Los Angeles, CAChange location
Get free quotesFree · no obligation · max 2 pros
Normal range for Los Angeles, CA
$11,700–$33,100per project

Most bathroom remodels in Los Angeles cost $11,700–$33,100 including demolition, tile, fixtures and labor. $20,000 is the usual price; a budget version is $7,350–$16,100 and an upscale one $31,600–$75,900.

How we get this data
Typical
$20,000
Low end
$6,900
High end
$55,200
Mid-range 5×8 bath
$11,700–$33,100
Half bath
$3,350–$16,100
Tub-to-shower
$3,250–$15,600
Primary bath
$23,500–$65,200

Want an exact price for your job?

Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.

Get my fair quote →
Typical bathroom remodel price: Los Angeles vs nearby citiesTypical price, per project. The line marks the US typical.
Los Angeles, CAThis guide $20,000
Long Beach, CA $19,600
Bakersfield, CA $15,300
Oxnard, CA $15,100
Riverside, CA $14,700

The typical Los Angeles price is $20,000, 38% above the US typical of $14,500.

Where Los Angeles sits among 195 US metrosNumber of metros at each typical bathroom remodel price, per project.

Los Angeles's price band

Los Angeles is pricier than 96% of the 195 US metros we price for bathroom remodel work.

Gutting and rebuilding a 5×8 full bath in Los Angeles costs $11,700–$33,100, typically $20,000. Budget versions with a prefab shower and stock vanity run $7,350–$16,100; upscale jobs with stone tile and frameless glass $31,600–$75,900.

HomeAdvisor's Los Angeles cost box puts a bathroom remodel at $19,887 on average, most paying $12,705 to $27,773, about 64% above its US average of $12,101. Angi's February 2026 Los Angeles page says $20,124 ($13,185–$27,072) and Thumbtack's July 2026 page $8,495–$26,582 for a complete remodel. LADBS charges $23 per new plumbing fixture on the permit ($10 to replace one in place) with a $90 minimum, and a like-for-like fixture swap with no moved lines needs no permit at all. In California any job worth $1,000 or more in labor and materials, or any job that needs a permit, must be done by a contractor licensed by the state board (CSLB), and a bathroom remodel needs both; ask for the license number and check it online before paying a deposit.

Every project price here covers tear-out, rough-in, waterproofing, tile, fixtures and labor for a job on the same layout. Moving the toilet or shower adds $1,050–$6,700 per fixture.

Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.

Quick answer

$11,700–$33,100 for a mid-range remodel of a 5×8 bathroom in Los Angeles, labor and materials — typically $20,000. A half bath runs $3,350–$16,100, a primary bath $23,500–$65,200, and a tub-to-shower conversion $3,250–$15,600. Verified November 2026. Get free Los Angeles quotes →

  • Mid-range 5×8 full bath remodel: $11,700–$33,100 ($20,000 typical)
  • Half bath $3,350–$16,100; primary bath $23,500–$65,200
  • Tub-to-shower conversion $3,250–$15,600; tiled walk-in shower $7,150–$20,800
  • Vanity installed $950–$4,750; toilet $445–$1,250; permits $180–$1,800
  • Priciest area to remodel in: Hollywood & West Hollywood; lowest quotes: South LA, Inglewood & Long Beach

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Detailed pricing — Bathroom remodel cost in Los Angeles 2026

Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Los Angeles metro, re-verified November 2026.

ServiceLowTypicalHigh
Mid-range full remodel, 5×8 ft bath, same layoutper project$11,700per project$20,000$33,100
Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project$7,350per project$11,400$16,100
Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project$31,600per project$48,100$75,900
Luxury primary bathroom remodel, 100+ sq ftper project$61,400per project$98,200$147,300
Half bath (powder room) remodelper project$3,350per project$8,050$16,100
Small full bath remodel (under 40 sq ft), same layoutper project$8,050per project$13,400$21,500
Primary bathroom remodel, mid-range, about 100 sq ftper project$23,500per project$37,800$65,200
Full remodel, cost per square foot (whole-room average)per sq ft$160per sq ft$335$535
Demolition to studs and debris disposalper project$940per project$1,900$3,350
Plumbing rough-in or moving one fixtureper fixture$1,050per fixture$2,700$6,700
Electrical: GFCI outlets, vanity lights and exhaust fanper project$670per project$1,600$3,350
Shower waterproofing (membrane or pan liner)per shower$780per shower$1,550$3,250
Tile installation, floor or shower walls, materials and laborper sq ft$16per sq ft$29$52
Vanity with top, sink and faucet, installed (36–48 in)installed$950installed$2,150$4,750
Toilet, installed (mid-range two-piece)installed$445installed$760$1,250
Alcove bathtub replacement, 60-in acrylic, installedinstalled$1,850installed$3,700$7,350
Freestanding soaking tub with floor-mount filler, installedinstalled$3,550installed$7,150$11,900
Prefab shower (acrylic or fiberglass kit), installedinstalled$1,850installed$3,950$7,350
Custom tiled walk-in shower, installedinstalled$7,150installed$12,400$20,800
Tub-to-shower conversionper project$3,250per project$7,150$15,600
Frameless glass shower door, installedinstalled$1,050installed$1,800$3,350
Heated towel rack, hardwired, installedinstalled$430installed$860$1,450
Faucet, showerhead and trim package, installed (mid-range)per project$860per project$1,600$3,050
Permits: building, plumbing and electricalper project$180per project$595$1,800
Bigger bathroom remodel jobs in Los Angeles: what they costPer project, low to high with the typical price marked. Every line is in the table above.
Luxury primary bathroom remodel, 100+ sq ft $98,200$61.4K–$147K
Upscale remodel, high-end tile and fixtures (5×8 to 8×10) $48,100$31.6K–$75.9K
Primary bathroom remodel, mid-range, about 100 sq ft $37,800$23.5K–$65.2K
Mid-range full remodel, 5×8 ft bath, same layout $20,000$11.7K–$33.1K
Small full bath remodel (under 40 sq ft), same layout $13,400$8,050–$21.5K
Smaller bathroom remodel jobs and repairs in Los AngelesPer project, low to high with the typical price marked. Every line is in the table above.
Budget full remodel, 5×8 ft, stock fixtures and ceramic tile $11,400$7,350–$16.1K
Half bath (powder room) remodel $8,050$3,350–$16.1K
Tub-to-shower conversion $7,150$3,250–$15.6K
Demolition to studs and debris disposal $1,900$940–$3,350
Electrical: GFCI outlets, vanity lights and exhaust fan $1,600$670–$3,350
Faucet, showerhead and trim package, installed (mid-range) $1,600$860–$3,050
Permits: building, plumbing and electrical $595$180–$1,800
Already got a quote?
Check it against these Los Angeles prices — free, no sign-up.
$

Got it as a PDF or photo? Upload up to 3 quotes and compare →

Free quotes

Get free quotes from up to 2 local bathroom remodelers in Los Angeles

Free · No obligation · About a minute

  1. 1The job
  2. 2Budget
  3. 3Your details
Casey · LocalGoingRate

What are you planning?

Tap one to start.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Figures are for the Los Angeles metro area. Travel charges can apply on the far edges; older plumbing in Hollywood & West Hollywood adds the most surprises.

How bathroom remodel costs vary across Los Angeles

Bathroom remodel prices across Los Angeles

Same tile, four price bands. Parking, building rules and old plumbing push Hollywood & West Hollywood to the top; South LA, Inglewood & Long Beach sits at or below the city typical.

Bathroom remodel prices across Los AngelesTypical range by part of the metro, per project. The line marks the Los Angeles typical.
Hollywood & West Hollywood10–15% above the city average $12.6K–$38.1Kper project
Downtown & the Arts DistrictStandard to 5% above $11.9K–$35.1Kper project
The ValleyStandard pricing $11.7K–$33.1Kper project
South LA, Inglewood & Long Beach5–7% below; some travel time $10.9K–$32.4Kper project

Hollywood & West Hollywood

10–15% above the city average
Hollywood, West Hollywood, Mid-City, Koreatown
Full remodel (5×8)
$12,600–$38,100 per project
Tub-to-shower
$3,500–$17,900 / tub-to-shower conversion

Condos, apartments and older buildings: elevator bookings, building rules, parking and tight stairwells all add crew time. Older plumbing stacks here often need work once the walls are open.

Downtown & the Arts District

Standard to 5% above
DTLA, Arts District, Echo Park, Silver Lake
Full remodel (5×8)
$11,900–$35,100 per project
Tub-to-shower
$3,300–$16,500 / tub-to-shower conversion

Older housing stock with character. Keeping the layout and reusing the drain locations keeps a remodel here at the standard rate.

The Valley

Standard pricing
North Hollywood, Burbank, Van Nuys, Sherman Oaks
Full remodel (5×8)
$11,700–$33,100 per project
Tub-to-shower
$3,250–$15,600 / tub-to-shower conversion

Established neighborhoods of single-family homes. Most jobs are a standard 5×8 full bath with the tub and toilet staying where they are, at the city's usual price.

South LA, Inglewood & Long Beach

5–7% below; some travel time
Inglewood, Compton, Long Beach, Gardena
Full remodel (5×8)
$10,900–$32,400 per project
Tub-to-shower
$3,000–$15,300 / tub-to-shower conversion

The lowest remodeling labor prices in the metro, with a travel charge at some companies. Simple same-layout jobs keep most bills low.

What you'll actually pay — job by job

Real-World Bathroom Remodel Costs in Los Angeles

Here's what common bathroom remodel jobs cost in Los Angeles in 2026, labor and materials on the existing layout.

Mid-range 5×8 full bath, same layout — 2–4 weeks

$11,700–$20,000

Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Los Angeles jobs land here; stone tile or a layout change pushes it toward $33,100.

Tub-to-shower conversion with frameless glass

$4,300–$19,000

Remove the tub, build a tiled or prefab walk-in shower on the same drain ($3,250–$15,600) and add a frameless glass door ($1,050–$3,350). The most popular single upgrade in older homes.

Half bath (powder room) refresh — 3–7 days

$3,350–$16,100

New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.

Primary bath, mid-range, about 100 sq ft — 4–6 weeks

$23,500–$65,200

Double vanity, separate tiled shower ($7,150–$20,800) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.

Budget rental or resale remodel — 1–2 weeks

$7,350–$16,100

Prefab shower or tub surround ($1,850–$7,350), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.

How much does a bathroom remodel cost in Los Angeles?

A mid-range 5×8 remodel in Los Angeles costs $11,700 to $33,100. The middle of the market, about $20,000, buys a gut to the studs, new waterproofing and tile, a new tub or shower, vanity, toilet and fixtures, on the same layout. Moving a fixture adds $1,050–$6,700 each.

Size moves the total more than anything: a half bath is $3,350–$16,100, a small full bath $8,050–$21,500, a 100 sq ft primary bath $23,500–$65,200. Prices re-checked against 103 sources in November 2026.

Bathroom remodel prices in Los Angeles (2026): by room, tub, shower and vanity

A mid-range 5×8 remodel costs $11,700–$33,100, a half bath $3,350–$16,100, a tiled walk-in shower $7,150–$20,800 installed and a vanity $950–$4,750.

Line on the quoteLowTypicalHigh
Half bath (powder room) remodel$3,350$8,050$16,100
Small full bath remodel (under 40 sq ft), same layout$8,050$13,400$21,500
Primary bathroom remodel, mid-range, about 100 sq ft$23,500$37,800$65,200
Tub-to-shower conversion$3,250$7,150$15,600
Custom tiled walk-in shower, installed$7,150$12,400$20,800
Prefab shower kit, installed$1,850$3,950$7,350
Vanity with top, sink and faucet, installed$950$2,150$4,750
Toilet, installed$445$760$1,250

Remodel or refresh in Los Angeles: a cosmetic refresh (vanity, toilet, fixtures, paint) at $2,450–$10,300 fixes a tired but sound bathroom. A full remodel at $20,000 typical is the answer when the tile, waterproofing or layout has failed.

What moves a bathroom remodel quote in Los Angeles:

  • Room size — a half bath is $3,350–$16,100; a 5×8 full bath $11,700–$33,100; a 100 sq ft primary bath $23,500–$65,200.
  • Tub or shower — a prefab kit is $1,850–$7,350; a custom tiled walk-in shower $7,150–$20,800; a tub-to-shower conversion $3,250–$15,600.
  • Layout — moving the toilet, sink or shower adds $1,050–$6,700 per fixture; keeping the layout saves $3,000–$8,000.
  • Tile and finishes — tile runs $16–$52 per sq ft installed, about $1,900–$6,250 for a 5×8 bath; a vanity $950–$4,750; frameless glass $1,050–$3,350.
  • What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.

Ask every Los Angeles remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →

Bathroom Remodel Cost in Los Angeles by Bathroom Size

Quick answer

Half bath (20–30 sq ft): $3,350–$16,100. Small full bath under 40 sq ft: $8,050–$21,500. Standard 5×8 full bath: $11,700–$33,100. Primary bath, about 100 sq ft: $23,500–$65,200; luxury primary $61,400–$147,300.

Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,900, electrical with GFCI outlets, lights and fan $1,600, shower waterproofing $1,550, tile (about 120 sq ft at $29 per sq ft) $3,500, alcove tub $3,700, vanity with top and faucet $2,150, toilet $760, shower trim and fixtures $1,600, frameless glass $1,800, paint $605. Those pieces come to about $19,200 in Los Angeles; add rough plumbing on the existing lines, drywall, trim and the contractor's margin and the whole room lands near the $20,000 typical. Permits at $595 and any moved fixture are on top.

Per square foot, bathrooms run $160–$535 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $37,800 typical is about double a 5×8 bath, not two and a half times.

Los Angeles Bathroom Remodel Costs by Type and Level

Remodel typeCostBest for
Cosmetic refresh (vanity, toilet, fixtures, paint)$2,450–$10,300 per projectA tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work.
Budget full remodel, 5×8$7,350–$16,100 per projectRentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout.
Mid-range full remodel, 5×8$11,700–$33,100 per projectMost family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout.
Upscale remodel$31,600–$75,900 per projectLarge-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change.
Luxury primary bath, 100+ sq ft$61,400–$147,300 per projectFreestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule.
Half bath (powder room)$3,350–$16,100 per projectToilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo.
Small full bath under 40 sq ft$8,050–$21,500 per projectHall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same.
Primary bath, mid-range, ~100 sq ft$23,500–$65,200 per projectDouble vanity, separate tub and shower, more tile. Roughly double a 5×8 bath.
Tub-to-shower conversion$3,250–$15,600 per projectReplacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location.
Custom tiled walk-in shower$7,150–$20,800 installedAny size or shape, bench and niche, curbless entry possible. Needs proper waterproofing.
Prefab shower kit$1,850–$7,350 installedAcrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain.
Accessible / aging-in-place remodel$3,250–$37,800 per projectCurbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves.
Cost by remodel type in Los AngelesTypical range, per project.
Cosmetic refresh (vanity, toilet, fixtures, paint) $2,450–$10.3Kper project
Budget full remodel, 5×8 $7,350–$16.1Kper project
Mid-range full remodel, 5×8 $11.7K–$33.1Kper project
Upscale remodel $31.6K–$75.9Kper project
Luxury primary bath, 100+ sq ft $61.4K–$147Kper project
Half bath (powder room) $3,350–$16.1Kper project
Small full bath under 40 sq ft $8,050–$21.5Kper project
Primary bath, mid-range, ~100 sq ft $23.5K–$65.2Kper project
Tub-to-shower conversion $3,250–$15.6Kper project
Accessible / aging-in-place remodel $3,250–$37.8Kper project
Los Angeles tip: if nobody uses the tub, convert it to a walk-in shower ($3,250–$15,600) rather than replacing it ($1,850–$7,350). Keep one tub in the house for resale.

Materials vs. labor — the Los Angeles bathroom remodel bill

Labor is 40–65% of a bathroom remodel. On a $20,000 mid-range 5×8 job in Los Angeles that's roughly $8,000–$13,000 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.

Plumbers in Los Angeles bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.

What's included in a Los Angeles bathroom remodel quote (and what costs extra)

A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:

  • Permits — $180–$1,800 for building, plumbing and electrical, often billed at cost
  • Moving fixtures — $1,050–$6,700 per toilet, sink or shower relocated
  • Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
  • Upgrades — frameless glass $1,050–$3,350, heated floor $600–$2,800, towel warmer $430–$1,450

Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.

What Affects Bathroom Remodel Costs in Los Angeles

Room size and layout

A half bath costs $3,350–$16,100 in Los Angeles, a 5×8 full bath $11,700–$33,100, a 100 sq ft primary bath $23,500–$65,200. Moving a fixture adds $1,050–$6,700 each; keeping the layout saves $3,000–$8,000.

Tub or shower choice

A prefab shower kit is $1,850–$7,350 installed; a custom tiled walk-in shower $7,150–$20,800; an alcove tub $1,850–$7,350; a freestanding soaking tub $3,550–$11,900. Converting a tub to a shower runs $3,250–$15,600.

Tile and finish level

Tile costs $16–$52 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,900–$6,250. Large-format porcelain and stone sit at the top; a vanity runs $950–$4,750 and frameless glass $1,050–$3,350.

What's behind the walls

Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Los Angeles homes should carry a 10–20% contingency.

Permits and local rules

A permit is needed once plumbing, electrical or walls change; a like-for-like swap of a toilet or vanity with no moved lines usually doesn't need one. Budget $180–$1,800. California also requires a state-licensed contractor (CSLB) on any job worth $1,000 or more in labor and materials, or any job that needs a permit, so every Los Angeles remodel quote should carry a license number you can check online.

Labor rates in Los Angeles

Labor is 40–65% of the bill. Los Angeles is one of the priciest places in the country to remodel a bathroom, so a mid-range 5×8 remodel is about 38% above the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.

Scope creep and extras

Heated floors add $600–$2,800, a heated towel rack $430–$1,450, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.

How to Save Money on a Bathroom Remodel in Los Angeles
  1. Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $1,050–$6,700.
  2. Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $3,250–$15,600 fixes the room's biggest problem for a fraction of a full remodel at $20,000.
  3. Go prefab where it won't show.A prefab shower kit at $1,850–$7,350 costs less than half a tiled shower at $7,150–$20,800, and has no grout to maintain.
  4. Buy mid-range fixtures from one collection.A $860–$3,050 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $950–$4,750 looks like custom for far less.
  5. Get three line-item quotes.Each Los Angeles quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($180–$1,800) and labor on separate lines. Compare the lines, not the total.
  6. Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Bathroom Remodel Cost in Los Angeles: What the Quote Should Include

Los Angeles remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:

  • Demolition and disposal, including the dumpster
  • Plumbing and electrical scope, and whether fixtures move
  • Waterproofing method (sheet or liquid membrane, pan) and its warranty
  • Tile type, square footage and labor, with layout and pattern noted
  • Fixture and vanity allowances or fixed prices, by model
  • Permits: who pulls them and what they cost
  • Schedule with start and finish dates and the payment stages
  • Contingency for hidden damage and how change orders are priced
Frequently asked questions — Bathroom remodel cost in Los Angeles
How much does a bathroom remodel cost in Los Angeles?

$11,700–$33,100 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $20,000 is typical. A half bath runs $3,350–$16,100, a primary bath $23,500–$65,200.

How much is a small bathroom remodel in Los Angeles?

$8,050–$21,500 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $7,350–$16,100; a half bath $3,350–$16,100.

How much does a tub-to-shower conversion cost in Los Angeles?

$3,250–$15,600, prefab at the low end and custom tile at the top. Add $1,050–$3,350 for a frameless glass door, so a tiled conversion with glass runs $4,300–$19,000.

How much does a walk-in shower cost in Los Angeles?

$7,150–$20,800 for a custom tiled walk-in shower installed, or $1,850–$7,350 for a prefab kit. Frameless glass is $1,050–$3,350 more; a curbless entry adds $1,000–$4,000.

How much is a primary bathroom remodel in Los Angeles?

$23,500–$65,200 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $61,400–$147,300.

Do I need a permit to remodel a bathroom in Los Angeles?

Yes, a permit is needed once plumbing, electrical or walls change; a like-for-like swap of a toilet or vanity with no moved lines usually doesn't need one. Budget $180–$1,800. California also requires a state-licensed contractor (CSLB) on any job worth $1,000 or more in labor and materials, or any job that needs a permit, so every Los Angeles remodel quote should carry a license number you can check online.

How long does a bathroom remodel take in Los Angeles?

About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.

What does labor cost for a bathroom remodel in Los Angeles?

Labor is 40–65% of the bill, so about $8,000–$13,000 of a $20,000 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.

Does a bathroom remodel add value to my home?

Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.

What's included in a Los Angeles bathroom remodel quote?

Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($180–$1,800), moving fixtures ($1,050–$6,700 each) and hidden damage.

Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology

Prices for the Los Angeles metro area, November 2026. Outer suburbs may vary.

Our methodology
These are independent estimates built from public cost guides, the Cost vs Value and Houzz studies, remodeler price pages, dated city price pages and federal wage data. No remodeling company can pay to change them, so always get two or three quotes. Last reviewed November 2026. Read our full methodology →

Get a fair bathroom remodel quote in Los Angeles

Local bathroom remodelers · Free quotes · No obligation, no spam.

Get quotes in Los Angeles →Max 2 bathroom remodelers will contact you
Get quotes in Los AngelesMax 2 bathroom remodelers · free · no spam→