How much does a bathroom remodel cost in Brooklyn?
By Our research team · Last verified · Methodology
Most bathroom remodels in Brooklyn cost $12,200–$34,400 for a mid-range 5×8 full bath, labor and materials, with $20,800 the typical bill. A half bath runs $3,500–$16,700; a primary bath $24,300–$67,400.
How we get this data- Typical
- $20,800
- Low end
- $7,200
- High end
- $57,400
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical Brooklyn price is $20,800, 43% above the US typical of $14,500.
Brooklyn's price band
Brooklyn is pricier than 98% of the 195 US metros we price for bathroom remodel work.
Gutting and rebuilding a 5×8 full bath in Brooklyn costs $12,200–$34,400, typically $20,800. Budget versions with a prefab shower and stock vanity run $7,650–$16,700; upscale jobs with stone tile and frameless glass $32,600–$78,300.
Brooklyn remodels follow New York City pricing: Block Renovation's May 2026 guide puts a mid-range bathroom at about $25,000 and adds $1,500–$5,000 for permits and building approvals. Co-op and condo buildings add their own alteration agreements and work-hour rules, and every contractor needs a city Home Improvement Contractor license.
Prices on this page include demolition, disposal, materials, labor and cleanup unless the row says otherwise. Permits ($185–$1,850) and design fees are usually extra, and a Brooklyn contractor should list them on the quote.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$12,200–$34,400 for a mid-range remodel of a 5×8 bathroom in Brooklyn, labor and materials — typically $20,800. A half bath runs $3,500–$16,700, a primary bath $24,300–$67,400, and a tub-to-shower conversion $3,350–$16,200. Verified November 2026. Get free Brooklyn quotes →
- Mid-range 5×8 full bath remodel: $12,200–$34,400 ($20,800 typical)
- Half bath $3,500–$16,700; primary bath $24,300–$67,400
- Tub-to-shower conversion $3,350–$16,200; tiled walk-in shower $7,400–$21,600
- Vanity installed $975–$4,850; toilet $455–$1,300; permits $185–$1,850
- Priciest area to remodel in: Downtown Brooklyn & Park Slope; lowest quotes: South & East Brooklyn
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Brooklyn metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $12,200per project | $20,800 | $34,400 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $7,650per project | $11,800 | $16,700 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $32,600per project | $49,600 | $78,300 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $63,100per project | $100,900 | $151,300 |
| Half bath (powder room) remodelper project | $3,500per project | $8,350 | $16,700 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $8,350per project | $13,900 | $22,300 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $24,300per project | $39,100 | $67,400 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $165per sq ft | $350 | $555 |
| Demolition to studs and debris disposalper project | $975per project | $1,950 | $3,500 |
| Plumbing rough-in or moving one fixtureper fixture | $1,100per fixture | $2,800 | $6,950 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $695per project | $1,650 | $3,500 |
| Shower waterproofing (membrane or pan liner)per shower | $810per shower | $1,600 | $3,350 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $16per sq ft | $30 | $54 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $975installed | $2,200 | $4,850 |
| Toilet, installed (mid-range two-piece)installed | $455installed | $785 | $1,300 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,900installed | $3,800 | $7,550 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $3,650installed | $7,300 | $12,200 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,900installed | $4,050 | $7,550 |
| Custom tiled walk-in shower, installedinstalled | $7,400installed | $12,800 | $21,600 |
| Tub-to-shower conversionper project | $3,350per project | $7,400 | $16,200 |
| Frameless glass shower door, installedinstalled | $1,100installed | $1,850 | $3,400 |
| Heated towel rack, hardwired, installedinstalled | $440installed | $885 | $1,500 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $885per project | $1,650 | $3,150 |
| Permits: building, plumbing and electricalper project | $185per project | $610 | $1,850 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in Brooklyn
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices cover the Brooklyn metro. Outlying towns can run 5–10% lower; condos and older homes in Downtown Brooklyn & Park Slope sit at the top of each range.
Bathroom remodel prices across Brooklyn
Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Downtown Brooklyn & Park Slope take the longest; same-layout jobs in South & East Brooklyn tend to come in at or under the city typical.
Williamsburg & Greenpoint
- Full remodel (5×8)
- $12,400–$36,500 per project
- Tub-to-shower
- $3,400–$17,200 / tub-to-shower conversion
Older housing stock with character. Keeping the layout and reusing the drain locations keeps a remodel here at the standard rate.
Bushwick & Bed-Stuy
- Full remodel (5×8)
- $12,400–$36,500 per project
- Tub-to-shower
- $3,400–$17,200 / tub-to-shower conversion
Renovated older homes next to new builds. Pricing sits near the city typical; the extras come from what's behind the old tile.
Downtown Brooklyn & Park Slope
- Full remodel (5×8)
- $13,200–$39,600 per project
- Tub-to-shower
- $3,600–$18,600 / tub-to-shower conversion
The priciest part of the metro to remodel in. Carrying tile and a tub through a lobby or up narrow stairs, protecting hallways and working within building hours add days to a job.
South & East Brooklyn
- Full remodel (5×8)
- $11,300–$33,700 per project
- Tub-to-shower
- $3,100–$15,900 / tub-to-shower conversion
Lower overhead keeps quotes at or a little below the city typical. Local crews with short drives are the best value; book before the spring rush.
Real-World Bathroom Remodel Costs in Brooklyn
Here's what common bathroom remodel jobs cost in Brooklyn in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Brooklyn jobs land here; stone tile or a layout change pushes it toward $34,400.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($3,350–$16,200) and add a frameless glass door ($1,100–$3,400). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($7,400–$21,600) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,900–$7,550), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in Brooklyn?
Between $12,200 and $34,400 for a mid-range 5×8 full bath, and $20,800 is the price most Brooklyn homeowners pay. Labor is 40–65% of that: demolition $975–$3,500, plumbing, electrical ($695–$3,500), waterproofing ($810–$3,350) and tile setting. The rest is the vanity, toilet, tub or shower, glass and tile.
Two things to budget beyond the quote: permits at $185–$1,850 and a 10–20% contingency for what's behind the walls, since rotted subfloor ($3.75–$7 per sq ft) and old pipes are common finds. Re-checked against 103 sources in November 2026.
Bathroom remodel prices in Brooklyn (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $12,200–$34,400, a half bath $3,500–$16,700, a tiled walk-in shower $7,400–$21,600 installed and a vanity $975–$4,850.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $3,500 | $8,350 | $16,700 |
| Small full bath remodel (under 40 sq ft), same layout | $8,350 | $13,900 | $22,300 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $24,300 | $39,100 | $67,400 |
| Tub-to-shower conversion | $3,350 | $7,400 | $16,200 |
| Custom tiled walk-in shower, installed | $7,400 | $12,800 | $21,600 |
| Prefab shower kit, installed | $1,900 | $4,050 | $7,550 |
| Vanity with top, sink and faucet, installed | $975 | $2,200 | $4,850 |
| Toilet, installed | $455 | $785 | $1,300 |
Labor is the bulk of a Brooklyn bill. Tile at $16–$54 per sq ft installed and a tiled shower at $7,400–$21,600 are mostly skilled hours; the vanity at $975–$4,850 and toilet at $455–$1,300 are mostly the product.
What moves a bathroom remodel quote in Brooklyn:
- Room size — a half bath is $3,500–$16,700; a 5×8 full bath $12,200–$34,400; a 100 sq ft primary bath $24,300–$67,400.
- Tub or shower — a prefab kit is $1,900–$7,550; a custom tiled walk-in shower $7,400–$21,600; a tub-to-shower conversion $3,350–$16,200.
- Layout — moving the toilet, sink or shower adds $1,100–$6,950 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $16–$54 per sq ft installed, about $1,900–$6,500 for a 5×8 bath; a vanity $975–$4,850; frameless glass $1,100–$3,400.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every Brooklyn remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in Brooklyn by Bathroom Size
Half bath (20–30 sq ft): $3,500–$16,700. Small full bath under 40 sq ft: $8,350–$22,300. Standard 5×8 full bath: $12,200–$34,400. Primary bath, about 100 sq ft: $24,300–$67,400; luxury primary $63,100–$151,300.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,950, electrical with GFCI outlets, lights and fan $1,650, shower waterproofing $1,600, tile (about 120 sq ft at $30 per sq ft) $3,600, alcove tub $3,800, vanity with top and faucet $2,200, toilet $785, shower trim and fixtures $1,650, frameless glass $1,850, paint $625. Those pieces come to about $19,700 in Brooklyn; add rough plumbing on the existing lines, drywall, trim and the contractor's margin and the whole room lands near the $20,800 typical. Permits at $610 and any moved fixture are on top.
Per square foot, bathrooms run $165–$555 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $39,100 typical is about double a 5×8 bath, not two and a half times.
Brooklyn Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $2,550–$10,600 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $7,650–$16,700 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $12,200–$34,400 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $32,600–$78,300 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $63,100–$151,300 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $3,500–$16,700 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $8,350–$22,300 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $24,300–$67,400 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $3,350–$16,200 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $7,400–$21,600 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,900–$7,550 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $3,350–$39,100 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the Brooklyn bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $20,800 mid-range 5×8 job in Brooklyn that's roughly $8,300–$13,500 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in Brooklyn bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in a Brooklyn bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $185–$1,850 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $1,100–$6,950 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $1,100–$3,400, heated floor $600–$2,800, towel warmer $440–$1,500
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $3,500–$16,700 in Brooklyn, a 5×8 full bath $12,200–$34,400, a 100 sq ft primary bath $24,300–$67,400. Moving a fixture adds $1,100–$6,950 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,900–$7,550 installed; a custom tiled walk-in shower $7,400–$21,600; an alcove tub $1,900–$7,550; a freestanding soaking tub $3,650–$12,200. Converting a tub to a shower runs $3,350–$16,200.
Tile and finish level
Tile costs $16–$54 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,900–$6,500. Large-format porcelain and stone sit at the top; a vanity runs $975–$4,850 and frameless glass $1,100–$3,400.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Brooklyn homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $185–$1,850 for a Brooklyn remodel and make sure the contractor, not you, pulls it.
Labor rates in Brooklyn
Labor is 40–65% of the bill. Brooklyn is a high-cost metro for remodeling labor, so a mid-range 5×8 remodel is about 43% above the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $440–$1,500, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $1,100–$6,950.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $3,350–$16,200 fixes the room's biggest problem for a fraction of a full remodel at $20,800.
- Go prefab where it won't show.A prefab shower kit at $1,900–$7,550 costs less than half a tiled shower at $7,400–$21,600, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $885–$3,150 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $975–$4,850 looks like custom for far less.
- Get three line-item quotes.Each Brooklyn quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($185–$1,850) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Brooklyn remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in Brooklyn?
$12,200–$34,400 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $20,800 is typical. A half bath runs $3,500–$16,700, a primary bath $24,300–$67,400.
How much is a small bathroom remodel in Brooklyn?
$8,350–$22,300 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $7,650–$16,700; a half bath $3,500–$16,700.
How much does a tub-to-shower conversion cost in Brooklyn?
$3,350–$16,200, prefab at the low end and custom tile at the top. Add $1,100–$3,400 for a frameless glass door, so a tiled conversion with glass runs $4,450–$19,600.
How much does a walk-in shower cost in Brooklyn?
$7,400–$21,600 for a custom tiled walk-in shower installed, or $1,900–$7,550 for a prefab kit. Frameless glass is $1,100–$3,400 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in Brooklyn?
$24,300–$67,400 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $63,100–$151,300.
Do I need a permit to remodel a bathroom in Brooklyn?
Yes, a permit is needed in most cities when plumbing, electrical or walls change, with the plumbing and electrical permits often separate from the building permit; some building departments want a plumbing permit even for a like-for-like toilet or tub swap, so ask before work starts. Budget $185–$1,850 for a Brooklyn remodel and make sure the contractor, not you, pulls it.
How long does a bathroom remodel take in Brooklyn?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in Brooklyn?
Labor is 40–65% of the bill, so about $8,300–$13,500 of a $20,800 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in a Brooklyn bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($185–$1,850), moving fixtures ($1,100–$6,950 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the Brooklyn metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in Brooklyn
Local bathroom remodelers · Free quotes · No obligation, no spam.