How much does a bathroom remodel cost in Dallas?
By Our research team · Last verified · Methodology
Most bathroom remodels in Dallas cost $7,800–$22,000 per project for a 5×8 full bath gutted and rebuilt on the same layout. Most homeowners here pay about $13,300. A tub-to-shower conversion is $2,350–$11,200.
How we get this data- Typical
- $13,300
- Low end
- $4,600
- High end
- $36,700
Want an exact price for your job?
Tell us the job. Casey checks it by text, then up to 2 local bathroom remodelers send you a real quote. Free, no obligation.
Get my fair quote →The typical Dallas price is $13,300, 8% below the US typical of $14,500.
Dallas's price band
Dallas is cheaper than 73% of the 195 US metros we price for bathroom remodel work.
Expect $2,350–$11,200 to convert a tub to a walk-in shower in Dallas, $5,150–$14,900 for a custom tiled shower, $765–$3,850 for a new vanity installed and $330–$940 for a toilet. A full mid-range remodel of a 5×8 bath is $7,800–$22,000.
HomeAdvisor's Dallas cost box puts a bathroom remodel at $10,468 on average, most paying $5,533 to $16,253, about 13% below its US average of $12,101. Texas has no state license for general remodelers, so vet the company yourself; anyone doing electrical work in Texas must hold a TDLR license, the state plumbing board tells homeowners to always hire a licensed plumber, and city permits still apply.
Prices on this page include demolition, disposal, materials, labor and cleanup unless the row says otherwise. Permits ($145–$1,450) and design fees are usually extra, and a Dallas contractor should list them on the quote.
Comparing cities, or after the US-wide picture? See the national guide: Bathroom remodel cost in the USA.
$7,800–$22,000 for a mid-range remodel of a 5×8 bathroom in Dallas, labor and materials — typically $13,300. A half bath runs $2,300–$11,100, a primary bath $16,800–$46,700, and a tub-to-shower conversion $2,350–$11,200. Verified November 2026. Get free Dallas quotes →
- Mid-range 5×8 full bath remodel: $7,800–$22,000 ($13,300 typical)
- Half bath $2,300–$11,100; primary bath $16,800–$46,700
- Tub-to-shower conversion $2,350–$11,200; tiled walk-in shower $5,150–$14,900
- Vanity installed $765–$3,850; toilet $330–$940; permits $145–$1,450
- Priciest area to remodel in: Deep Ellum & Downtown; lowest quotes: North Dallas & Richardson
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Project prices include demolition, materials, labor and cleanup on the existing layout; permits and design are separate rows. Dallas metro, re-verified November 2026.
| Service | Low | Typical | High |
|---|---|---|---|
| Mid-range full remodel, 5×8 ft bath, same layoutper project | $7,800per project | $13,300 | $22,000 |
| Budget full remodel, 5×8 ft, stock fixtures and ceramic tileper project | $5,100per project | $7,850 | $11,100 |
| Upscale remodel, high-end tile and fixtures (5×8 to 8×10)per project | $23,500per project | $35,800 | $56,500 |
| Luxury primary bathroom remodel, 100+ sq ftper project | $47,500per project | $76,000 | $114,000 |
| Half bath (powder room) remodelper project | $2,300per project | $5,550 | $11,100 |
| Small full bath remodel (under 40 sq ft), same layoutper project | $5,550per project | $9,250 | $14,800 |
| Primary bathroom remodel, mid-range, about 100 sq ftper project | $16,800per project | $27,100 | $46,700 |
| Full remodel, cost per square foot (whole-room average)per sq ft | $110per sq ft | $230 | $370 |
| Demolition to studs and debris disposalper project | $650per project | $1,300 | $2,300 |
| Plumbing rough-in or moving one fixtureper fixture | $740per fixture | $1,850 | $4,650 |
| Electrical: GFCI outlets, vanity lights and exhaust fanper project | $465per project | $1,100 | $2,300 |
| Shower waterproofing (membrane or pan liner)per shower | $560per shower | $1,100 | $2,350 |
| Tile installation, floor or shower walls, materials and laborper sq ft | $11per sq ft | $21 | $37 |
| Vanity with top, sink and faucet, installed (36–48 in)installed | $765installed | $1,750 | $3,850 |
| Toilet, installed (mid-range two-piece)installed | $330installed | $565 | $940 |
| Alcove bathtub replacement, 60-in acrylic, installedinstalled | $1,450installed | $2,850 | $5,700 |
| Freestanding soaking tub with floor-mount filler, installedinstalled | $2,900installed | $5,750 | $9,600 |
| Prefab shower (acrylic or fiberglass kit), installedinstalled | $1,450installed | $3,050 | $5,700 |
| Custom tiled walk-in shower, installedinstalled | $5,150installed | $8,850 | $14,900 |
| Tub-to-shower conversionper project | $2,350per project | $5,150 | $11,200 |
| Frameless glass shower door, installedinstalled | $865installed | $1,450 | $2,700 |
| Heated towel rack, hardwired, installedinstalled | $335installed | $665 | $1,150 |
| Faucet, showerhead and trim package, installed (mid-range)per project | $665per project | $1,250 | $2,400 |
| Permits: building, plumbing and electricalper project | $145per project | $480 | $1,450 |
Got it as a PDF or photo? Upload up to 3 quotes and compare →
Get free quotes from up to 2 local bathroom remodelers in Dallas
Free · No obligation · About a minute
- 1The job
- 2Budget
- 3Your details
What are you planning?
Tap one to start.
What's your rough budget?
A ballpark is fine. It helps the bathroom remodelers who reply.
Where should they text you?
- Max 2 bathroom remodelers. No call floods.
- 100% free. No obligation.
- 🔒 Only your matched bathroom remodelers see your number.
By continuing you agree to our Terms and Privacy Policy, and to texts from LocalGoingRate and up to 2 bathroom remodelers about this request.Msg & data rates may apply · frequency varies · STOP to end · HELP for help
Check your phone
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices cover the Dallas metro. Outlying towns can run 5–10% lower; condos and older homes in Deep Ellum & Downtown sit at the top of each range.
Bathroom remodel prices across Dallas
Where you live in the metro changes the labor and the surprises, not the fixtures. Older homes and condos in Deep Ellum & Downtown take the longest; same-layout jobs in North Dallas & Richardson tend to come in at or under the city typical.
Deep Ellum & Downtown
- Full remodel (5×8)
- $8,400–$25,300 per project
- Tub-to-shower
- $2,550–$12,900 / tub-to-shower conversion
Pre-war and mid-century buildings with cast-iron drains and plaster walls. Expect a bigger contingency and a longer schedule than in a newer house.
Oak Cliff & South Dallas
- Full remodel (5×8)
- $7,950–$23,300 per project
- Tub-to-shower
- $2,400–$11,900 / tub-to-shower conversion
Renovated older homes next to new builds. Pricing sits near the city typical; the extras come from what's behind the old tile.
North Dallas & Richardson
- Full remodel (5×8)
- $7,800–$23,100 per project
- Tub-to-shower
- $2,350–$11,800 / tub-to-shower conversion
Two or three full baths per house are common here. Expect standard pricing, and ask about doing two baths at once to share the demo and permit costs.
Arlington & Irving
- Full remodel (5×8)
- $7,800–$22,000 per project
- Tub-to-shower
- $2,350–$11,200 / tub-to-shower conversion
Established neighborhoods of single-family homes. Most jobs are a standard 5×8 full bath with the tub and toilet staying where they are, at the city's usual price.
Real-World Bathroom Remodel Costs in Dallas
Here's what common bathroom remodel jobs cost in Dallas in 2026, labor and materials on the existing layout.
Mid-range 5×8 full bath, same layout — 2–4 weeks
Gut to the studs, new waterproofing, porcelain tile floor and tub surround, new alcove tub, semi-custom vanity, toilet and fixtures. Most Dallas jobs land here; stone tile or a layout change pushes it toward $22,000.
Tub-to-shower conversion with frameless glass
Remove the tub, build a tiled or prefab walk-in shower on the same drain ($2,350–$11,200) and add a frameless glass door ($865–$2,700). The most popular single upgrade in older homes.
Half bath (powder room) refresh — 3–7 days
New vanity, toilet, faucet, tile floor, lighting and paint. No shower means no waterproofing, so it's the cheapest room in the house to redo.
Primary bath, mid-range, about 100 sq ft — 4–6 weeks
Double vanity, separate tiled shower ($5,150–$14,900) and tub, more floor tile and lighting. Roughly double a 5×8 bath because there's twice the tile and twice the fixtures.
Budget rental or resale remodel — 1–2 weeks
Prefab shower or tub surround ($1,450–$5,700), stock vanity, standard toilet, ceramic tile floor, paint. Keeps every fixture where it is.
How much does a bathroom remodel cost in Dallas?
A mid-range 5×8 remodel in Dallas costs $7,800 to $22,000. The middle of the market, about $13,300, buys a gut to the studs, new waterproofing and tile, a new tub or shower, vanity, toilet and fixtures, on the same layout. Moving a fixture adds $740–$4,650 each.
Size moves the total more than anything: a half bath is $2,300–$11,100, a small full bath $5,550–$14,800, a 100 sq ft primary bath $16,800–$46,700. Prices re-checked against 103 sources in November 2026.
Bathroom remodel prices in Dallas (2026): by room, tub, shower and vanity
A mid-range 5×8 remodel costs $7,800–$22,000, a half bath $2,300–$11,100, a tiled walk-in shower $5,150–$14,900 installed and a vanity $765–$3,850.
| Line on the quote | Low | Typical | High |
|---|---|---|---|
| Half bath (powder room) remodel | $2,300 | $5,550 | $11,100 |
| Small full bath remodel (under 40 sq ft), same layout | $5,550 | $9,250 | $14,800 |
| Primary bathroom remodel, mid-range, about 100 sq ft | $16,800 | $27,100 | $46,700 |
| Tub-to-shower conversion | $2,350 | $5,150 | $11,200 |
| Custom tiled walk-in shower, installed | $5,150 | $8,850 | $14,900 |
| Prefab shower kit, installed | $1,450 | $3,050 | $5,700 |
| Vanity with top, sink and faucet, installed | $765 | $1,750 | $3,850 |
| Toilet, installed | $330 | $565 | $940 |
Labor is the bulk of a Dallas bill. Tile at $11–$37 per sq ft installed and a tiled shower at $5,150–$14,900 are mostly skilled hours; the vanity at $765–$3,850 and toilet at $330–$940 are mostly the product.
What moves a bathroom remodel quote in Dallas:
- Room size — a half bath is $2,300–$11,100; a 5×8 full bath $7,800–$22,000; a 100 sq ft primary bath $16,800–$46,700.
- Tub or shower — a prefab kit is $1,450–$5,700; a custom tiled walk-in shower $5,150–$14,900; a tub-to-shower conversion $2,350–$11,200.
- Layout — moving the toilet, sink or shower adds $740–$4,650 per fixture; keeping the layout saves $3,000–$8,000.
- Tile and finishes — tile runs $11–$37 per sq ft installed, about $1,300–$4,450 for a 5×8 bath; a vanity $765–$3,850; frameless glass $865–$2,700.
- What's behind the walls — water damage repair is $3.75–$7 per sq ft and old supply lines $1,500–$4,000 to replace; budget a 10–20% contingency.
Ask every Dallas remodeler for the same five things: a line-item quote (demo, plumbing, electrical, waterproofing, tile, fixtures, labor), who pulls the permit, the waterproofing method and warranty, an allowance list for fixtures and tile, and the schedule with a start and finish date. Compare those, not the headline price. Get a quote for your bathroom remodel →
Bathroom Remodel Cost in Dallas by Bathroom Size
Half bath (20–30 sq ft): $2,300–$11,100. Small full bath under 40 sq ft: $5,550–$14,800. Standard 5×8 full bath: $7,800–$22,000. Primary bath, about 100 sq ft: $16,800–$46,700; luxury primary $47,500–$114,000.
Worked example, a mid-range 5×8 hall bath on the same layout: demolition $1,300, electrical with GFCI outlets, lights and fan $1,100, shower waterproofing $1,100, tile (about 120 sq ft at $21 per sq ft) $2,500, alcove tub $2,850, vanity with top and faucet $1,750, toilet $565, shower trim and fixtures $1,250, frameless glass $1,450, paint $415. Bought one job at a time in Dallas those pieces come to about $14,300. A contractor pricing the whole room on the same layout lands near $13,300, because one crew does the demolition, rough plumbing, drywall and tile in one pass instead of ten separate visits. Permits at $480 and any moved fixture are on top.
Per square foot, bathrooms run $110–$370 for a full remodel, and small rooms sit at the top of that range because a toilet, vanity, tub and valve cost the same whether the room is 30 or 100 sq ft. A 100 sq ft primary bath at $27,100 typical is about double a 5×8 bath, not two and a half times.
Dallas Bathroom Remodel Costs by Type and Level
| Remodel type | Cost | Best for |
|---|---|---|
| Cosmetic refresh (vanity, toilet, fixtures, paint) | $1,900–$8,050 per project | A tired but sound bathroom. No demolition; often no permit, though some cities want one for the plumbing swap. 2–4 days of work. |
| Budget full remodel, 5×8 | $5,100–$11,100 per project | Rentals and resale prep. Prefab tub surround or shower kit, stock vanity, ceramic tile floor, same layout. |
| Mid-range full remodel, 5×8 | $7,800–$22,000 per project | Most family and guest baths. Gut to the studs, new waterproofing, porcelain tile, semi-custom vanity, same layout. |
| Upscale remodel | $23,500–$56,500 per project | Large-format or stone tile, frameless glass, custom vanity, heated floor; often a layout change. |
| Luxury primary bath, 100+ sq ft | $47,500–$114,000 per project | Freestanding tub plus a big tiled shower, double vanity, designer fixtures and lighting; design fees and a longer schedule. |
| Half bath (powder room) | $2,300–$11,100 per project | Toilet and sink only. No shower means no waterproofing, so it's the cheapest room to redo. |
| Small full bath under 40 sq ft | $5,550–$14,800 per project | Hall and guest baths in older homes. Same work as a 5×8 in a tighter space; fixtures cost the same. |
| Primary bath, mid-range, ~100 sq ft | $16,800–$46,700 per project | Double vanity, separate tub and shower, more tile. Roughly double a 5×8 bath. |
| Tub-to-shower conversion | $2,350–$11,200 per project | Replacing an unused tub with a walk-in shower, prefab or tiled. Keeps the drain location. |
| Custom tiled walk-in shower | $5,150–$14,900 installed | Any size or shape, bench and niche, curbless entry possible. Needs proper waterproofing. |
| Prefab shower kit | $1,450–$5,700 installed | Acrylic or fiberglass walls and base in one or two days. Fewer grout lines to maintain. |
| Accessible / aging-in-place remodel | $2,350–$27,100 per project | Curbless shower, grab bars, bench, comfort-height toilet and wider door. Price depends on how much moves. |
Materials vs. labor — the Dallas bathroom remodel bill
Labor is 40–65% of a bathroom remodel. On a $13,300 mid-range 5×8 job in Dallas that's roughly $5,300–$8,650 for demolition, plumbing, electrical, waterproofing, tile setting, carpentry and cleanup; the rest buys the tub or shower, vanity, toilet, tile, glass and fixtures.
Plumbers in Dallas bill about $45–$200 an hour, electricians $50–$130 and tile setters $30–$100. A general contractor coordinating all of them adds 10–20% of the job. Demolition, painting and buying fixtures are fair DIY jobs; waterproofing, plumbing valves and wiring are not.
What's included in a Dallas bathroom remodel quote (and what costs extra)
A standard full-remodel price covers demolition and disposal, rough plumbing and electrical on the existing layout, waterproofing, tile, the tub or shower, vanity, toilet, fixtures, drywall patching, paint and cleanup. The headline price often leaves out:
- Permits — $145–$1,450 for building, plumbing and electrical, often billed at cost
- Moving fixtures — $740–$4,650 per toilet, sink or shower relocated
- Hidden damage — rotted subfloor at $3.75–$7 per sq ft, old supply lines $1,500–$4,000
- Upgrades — frameless glass $865–$2,700, heated floor $600–$2,800, towel warmer $335–$1,150
Ask whether fixtures and tile are 'allowances' (a budget you can overspend) or fixed prices, and get the waterproofing method and warranty in writing.
Room size and layout
A half bath costs $2,300–$11,100 in Dallas, a 5×8 full bath $7,800–$22,000, a 100 sq ft primary bath $16,800–$46,700. Moving a fixture adds $740–$4,650 each; keeping the layout saves $3,000–$8,000.
Tub or shower choice
A prefab shower kit is $1,450–$5,700 installed; a custom tiled walk-in shower $5,150–$14,900; an alcove tub $1,450–$5,700; a freestanding soaking tub $2,900–$9,600. Converting a tub to a shower runs $2,350–$11,200.
Tile and finish level
Tile costs $11–$37 per sq ft installed, so a 5×8 bath's floor and tub walls run about $1,300–$4,450. Large-format porcelain and stone sit at the top; a vanity runs $765–$3,850 and frameless glass $865–$2,700.
What's behind the walls
Rotted subfloor costs $3.75–$7 per sq ft to repair, mold $500–$6,000, and old galvanized or cast-iron supply lines $1,500–$4,000 to replace. Older Dallas homes should carry a 10–20% contingency.
Permits and local rules
A permit is needed in most Texas cities once fixtures move or circuits are added; paint, tile and a vanity swap are usually cosmetic and exempt. Budget $145–$1,450. Texas has no state license for general remodelers, so vet the company yourself; the electrician on a Dallas job must hold a TDLR license and the plumber a state plumbing license, and the permit should be pulled in the contractor's name.
Labor rates in Dallas
Labor is 40–65% of the bill. Dallas is a large metro with mid-range remodeling prices, so a mid-range 5×8 remodel is about 8% below the US typical of $14,500. Plumbers bill $45–$200 an hour, tile setters $30–$100.
Scope creep and extras
Heated floors add $600–$2,800, a heated towel rack $335–$1,150, a shower bench $300–$800 and a niche $200–$500. Each is cheap to add while the walls are open and expensive later.
- Keep the layout.Leaving the toilet, sink and shower where they are saves $3,000–$8,000 in plumbing and patching. Moving one fixture costs $740–$4,650.
- Convert the tub instead of rebuilding everything.If the tile and vanity are sound, a tub-to-shower conversion at $2,350–$11,200 fixes the room's biggest problem for a fraction of a full remodel at $13,300.
- Go prefab where it won't show.A prefab shower kit at $1,450–$5,700 costs less than half a tiled shower at $5,150–$14,900, and has no grout to maintain.
- Buy mid-range fixtures from one collection.A $665–$2,400 trim package in one finish and line costs less than mixing brands, and a semi-custom vanity at $765–$3,850 looks like custom for far less.
- Get three line-item quotes.Each Dallas quote should list demo, plumbing, electrical, waterproofing, tile, fixtures, permits ($145–$1,450) and labor on separate lines. Compare the lines, not the total.
- Book the off-season.Remodelers are busiest from spring through early fall. A winter start in most markets gets you a better crew and sometimes a better price.
Dallas remodelers should give you a written, line-item quote. Before you pay a deposit, get these in writing:
- Demolition and disposal, including the dumpster
- Plumbing and electrical scope, and whether fixtures move
- Waterproofing method (sheet or liquid membrane, pan) and its warranty
- Tile type, square footage and labor, with layout and pattern noted
- Fixture and vanity allowances or fixed prices, by model
- Permits: who pulls them and what they cost
- Schedule with start and finish dates and the payment stages
- Contingency for hidden damage and how change orders are priced
How much does a bathroom remodel cost in Dallas?
$7,800–$22,000 for a mid-range remodel of a 5×8 full bath on the same layout, labor and materials, and $13,300 is typical. A half bath runs $2,300–$11,100, a primary bath $16,800–$46,700.
How much is a small bathroom remodel in Dallas?
$5,550–$14,800 for a small full bath under 40 sq ft, same layout. A budget 5×8 job with a prefab shower and stock vanity is $5,100–$11,100; a half bath $2,300–$11,100.
How much does a tub-to-shower conversion cost in Dallas?
$2,350–$11,200, prefab at the low end and custom tile at the top. Add $865–$2,700 for a frameless glass door, so a tiled conversion with glass runs $3,200–$13,900.
How much does a walk-in shower cost in Dallas?
$5,150–$14,900 for a custom tiled walk-in shower installed, or $1,450–$5,700 for a prefab kit. Frameless glass is $865–$2,700 more; a curbless entry adds $1,000–$4,000.
How much is a primary bathroom remodel in Dallas?
$16,800–$46,700 for a mid-range remodel of a 100 sq ft primary bath with a double vanity and separate tub and shower. Luxury versions run $47,500–$114,000.
Do I need a permit to remodel a bathroom in Dallas?
Yes, a permit is needed in most Texas cities once fixtures move or circuits are added; paint, tile and a vanity swap are usually cosmetic and exempt. Budget $145–$1,450. Texas has no state license for general remodelers, so vet the company yourself; the electrician on a Dallas job must hold a TDLR license and the plumber a state plumbing license, and the permit should be pulled in the contractor's name.
How long does a bathroom remodel take in Dallas?
About 2–4 weeks of work for a 5×8 full bath once materials are on site, longer if fixtures move or tile is back-ordered. A half bath takes a few days to a week; a primary bath four to six weeks.
What does labor cost for a bathroom remodel in Dallas?
Labor is 40–65% of the bill, so about $5,300–$8,650 of a $13,300 job. Plumbers bill $45–$200 an hour, electricians $50–$130, tile setters $30–$100.
Does a bathroom remodel add value to my home?
Remodeling's 2025 Cost vs Value Report put a midrange bath remodel at $26,138 nationally and estimated it recoups about 80% at resale; an upscale remodel at $81,612 recoups about 42%. Mid-range pays back best.
What's included in a Dallas bathroom remodel quote?
Demolition, rough plumbing and electrical on the existing layout, waterproofing, tile, tub or shower, vanity, toilet, fixtures, drywall, paint and cleanup. Often extra: permits ($145–$1,450), moving fixtures ($740–$4,650 each) and hidden damage.
Prices verified November 2026 · Cross-referenced against 103+ American pricing sources · See methodology
Prices for the Dallas metro area, November 2026. Outer suburbs may vary.
Get a fair bathroom remodel quote in Dallas
Local bathroom remodelers · Free quotes · No obligation, no spam.